USPTO serial 79241394
SMART OFFSITE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- AGREDA, SAMANTHA LEIGH
- Law office
- TMO LAW OFFICE 123 - EXAMINING ATTORNEY ASSIGNED
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with SMART OFFSITE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys, unwrought or semi-wrought; metal building materials, namely, fascia, metal canopies, soffits; transportable buildings of metal; non-electric cables and wires of common metal; ironmongery being small items of metal hardware, namely, iron scraps, iron strip, cast iron pipes; pipes and tubes of metal; portable buildings of metal; portable buildings made principally of metal; modular portable buildings of metal; portable mobile metal office buildings; prefabricated metal building components, namely, prefabricated garages of metal, prefabricated metal platforms, prefabricated metal bridges; prefabricated metal building elements, namely, prefabricated garages of metal, prefabricated metal platforms, prefabricated metal bridges; prefabricated elements of metal for building, namely, prefabricated garages of metal, prefabricated metal platforms, prefabricated metal bridges; prefabricated metal houses assembly kits; prefabricated houses of metal; prefabricated metal buildings; prefabricated, transportable, metal constructions; metal prefabricated elements for building, namely, prefabricated garages of metal, prefabricated metal platforms, prefabricated metal bridges; modular prefabricated steel frames for building; metal residential and agricultural shelters made of prefabricated metal insulated materials; relocatable buildings in the nature of transportable buildings of metal | ACTIVE | — |
| 019 | Non-metallic building materials, namely, non-metal countertops for further installation, floor boards, fiberglass panels; non-metallic transportable buildings; non-metallic portable buildings; non-metallic portable buildings incorporating kitchen facilities; non-metallic portable buildings incorporating toilet facilities; portable buildings made of non-metallic materials; non-metallic portable buildings; portable non-metal buildings; non-metallic prefabricated building components, namely, non-metal garages, non-metal bridges, non-metal architectural columns; non-metallic prefabricated building elements, namely, non-metal garages, non-metal bridges, non-metal architectural columns; non-metallic prefabricated building elements, namely, non-metal garages, non-metal bridges, non-metal architectural columns for on site assembly; non-metallic prefabricated elements for building, namely, non-metal garages, non-metal bridges, non-metal architectural columns; non-metallic prefabricated houses; prefabricated non-metal houses assembly kits; kits for assembly of prefabricated houses, not of metal; prefabricated non-metal buildings; prefabricated, transportable, non-metallic constructions; prefabricated, non-metal storage shed; non-metallic modular units, namely, non-metal silos, non-metal homes, non-metal dog houses for constructing prefabricated buildings; non-metallic prefabricated buildings; relocatable buildings in the nature of non-metallic transportable buildings | ACTIVE | — |
| 036 | Rental of buildings | ACTIVE | — |
| 037 | Building construction; building services, namely, general building contractor services, building caulking services, building construction services; construction management for the building, construction and engineering industries; repair and installation services of non-metallic building materials, non-metallic transportable buildings, non-metallic portable buildings, non-metallic portable buildings incorporating kitchen facilities, non-metallic portable buildings incorporating toilet facilities, portable buildings made of non-metallic materials, non-metallic portable buildings, portable non-metal buildings, non-metallic prefabricated building components, non-metallic prefabricated building elements, non-metallic prefabricated building elements for on site assembly, non-metallic prefabricated elements for building, non-metallic prefabricated houses, kits for assembly of metal prefabricated houses, kits for assembly of non-metal prefabricated houses, prefabricated non-metal buildings, prefabricated non-metallic constructions, prefabricated, non-metal storage shed, non-metallic modular units for constructing prefabricated buildings, non-metallic prefabricated buildings, non-metallic relocatable buildings; construction of buildings and other structures in the nature of underground structures, masonry structures, athletic facilities; assembly of prefabricated houses; erection of prefabricated buildings and structures in the nature of housing areas, commercial centres, manufacturing plants | ACTIVE | — |
| 039 | Transport, namely, car transport, air transport, boat transport; packaging and storage of food, medical instruments; rental of containers for warehousing and storage; rental of portable storage containers; rental of storage containers; providing self-storage facilities for others, namely, rental of storage facilities; providing self-storage facilities for others, namely, rental of storage space; providing self-storage facilities for others, namely, rental of storage units | ACTIVE | — |
| 042 | Architectural design; architectural design services; architectural services for the design of buildings; architectural services for the design of commercial buildings; architectural services for the design of industrial buildings; architectural services for the design of office buildings; architectural services for the design of office facilities; architectural services for the design of retail premises; consultancy in the field of architectural design; architectural design for others; professional architectural design services; advisory, analytical and information services in the field of architectural, engineering and environmental engineering matters; professional engineering management, namely, computer project management services in the field of engineering | ACTIVE | — |
| 043 | Rental of portable buildings; providing temporary accommodation; rental of temporary accommodation; rental of temporary office space | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by The McAvoy Group Limited
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 042
- Other trademarks in Class 043
- Similar marks named SMART OFFSITE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 19, 2020 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 2, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 2, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 20, 2020 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 4, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 4, 2020 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 2, 2019 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Dec 2, 2019 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| May 17, 2019 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 16, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 18, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 18, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 18, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 2, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 18, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 18, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 10, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 9, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 2, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 28, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 28, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 27, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |