USPTO serial 79241442
KPS
Reviewed by CopyMark Law Group
Reg. 5823893Status 709
- Filing date
- Status date
- Registration date
- Aug 6, 2019
- Examiner
- CARROLL, DORITT
- Law office
- TTAB
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with KPS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Electrical energy; electrical energy from renewable sources; electrical energy from wind power; electrical energy from solar power; electrical energy from non-renewable sources | SECTION 71 - CANCELLED | — |
| 007 | Generator of electricity; current generators; electric generators and related equipment, namely, automatic standby electricity generating sets; wind-powered electric power generators; mobile and portable electrical power generators; engines and motors for the generation of electricity; turbines, other than for land vehicles; wind turbines for generation of electricity; wind turbines; generators for wind turbines; wind turbines for power generation; mobile electric power generators; winches; electrically powered winches; windlasses; winding machines; wind powered electricity generators; hydroelectric generators for generating electricity; solar power generators; gears for machines; and structural parts therefor | SECTION 71 - CANCELLED | — |
| 009 | Transformers; power line conditioners; electrical power distribution units; power packs, namely, auxiliary battery packs; apparatus, instruments and cables for electricity, namely, electrical outlets, wires, cables, controllers, connectors, terminal boxes, adaptors, connection boxes, power connectors; downloadable computer software for use in the generation and distribution of electrical energy; downloadable operating software; downloadable computer application software for use in the generation and distribution of electrical energy; downloadable computer application software for mobile phones, smart phones and tablet computers for use in to the generation and distribution of electrical energy; downloadable industrial process control software; downloadable data communication software for use in the generation and distribution of electrical energy; data transmitters being computer hardware and peripheral devices and recorded computer software for data communication and translating and transmitting data; downloadable computer software programs for data processing; mobile data communication receivers; computer hardware; computer hardware for use in relation to data communications in the field of electrical energy generation and distribution; data processing equipment and computers; wind sleeves and wind socks for indicating wind direction and intensity; electric sensors for measuring wind seed, intensity and pressure for use in the field of electrical energy generation and distribution; sensors for measuring wind speed, intensity and pressure and structural parts therefor | SECTION 18 - CANCELLED | — |
| 028 | Kites; kite parts; kite lines; kite string; kite reels; kite tails; hang gliders; paragliders; parachutes for paragliding; parafoils; and structural parts therefor | SECTION 71 - CANCELLED | — |
| 037 | Installation of power generating apparatus; maintenance of power generating apparatus and installations; installation, repair and maintenance of power generators; installation, maintenance and repair of power plants and power grids; repair and maintenance of wind power plants; construction, maintenance and repair of wind power plants; providing information relating to the repair or maintenance of power generators; installation, construction, maintenance, servicing and repair of energy and power generating apparatus, equipment and installations; erection, installation, maintenance and repair of wind turbines, wind stations and other wind power generating machines; maintenance and repair of gears; information, advisory, and consultancy services in relation to the installation of power generating apparatus, maintenance of power generating apparatus and installations, installation, repair and maintenance of power generators, installation, maintenance and repair of power plants and power grids; repair and maintenance of wind power plants, construction, maintenance and repair of wind power plants, providing information relating to the repair or maintenance of power generators, installation, construction, maintenance, servicing and repair of energy and power generating apparatus, equipment and installations, erection, installation, maintenance and repair of wind turbines, wind stations and other wind power generating machines, maintenance and repair of gears | SECTION 71 - CANCELLED | — |
| 040 | Generation of power; production of electrical power from renewable sources; generation of electricity from wind energy; production of energy by power plants; rental of power generating equipment; consultancy services relating to the generation of electrical power; custom manufacture and assembly services of power generating apparatus; information, advisory, and consultancy services in relation to the generation of power, production of electrical power from renewable sources, generation of electricity from wind energy, production of energy by power plants, rental of power generating equipment, consultancy services relating to the generation of electrical power, custom manufacture and assembly services of power generating apparatus | SECTION 71 - CANCELLED | — |
| 042 | Scientific research services in the field of energy production; research in the field of energy; design services relating to power generating apparatus; development of environmentally friendly forms of energy and power; engineering services in the field of energy technology; technological consulting services relating to engineering and development of power generating apparatus in the field of alternative energy generation; research and design of computer hardware and software; computer programming in the energy industry; programming of energy management software; design and development of software for the control, regulation and monitoring of wind energy; IT services; energy auditing; engineering services in the field of energy technology; information, advisory, and consultancy services in relation to scientific research services in the field of energy production, research in the field of energy, engineering and development of power generating apparatus in the field of alternative energy generation, engineering services in the field of energy technology, research and design of computer hardware and software, computer programming in the energy industry, programming of energy management software, design and development of software for the control, regulation and monitoring of wind energy, IT consulting services, energy auditing, engineering services in the field of energy technology | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Kite Power Systems Limited
- Other trademarks owned by Kite Power Systems Limited
- Other trademarks owned by Kite Power Systems Limited
- Other trademarks in Class 004
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 028
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named KPS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 20, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 27, 2026 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Feb 20, 2026 | C71T | CANCELLED SECTION 71 | — |
| Aug 6, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 19, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 15, 2024 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Mar 8, 2024 | C18P | CANCELLED SECTION 18-PARTIAL | — |
| Mar 8, 2024 | REIN | REINSTATED | — |
| Mar 8, 2024 | TTPR | BOARD DECISION SET ASIDE; PROCEEDING REINSTATED | — |
| Nov 27, 2023 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 2, 2023 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Nov 2, 2023 | INPC | INVALIDATION PROCESSED | — |
| Oct 21, 2023 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 21, 2023 | C18. | CANCELLED SECTION 18-TOTAL | — |
| Feb 21, 2023 | CANT | CANCELLATION TERMINATED NO. 999999 | — |
| Feb 18, 2023 | CANG | CANCELLATION GRANTED NO. 999999 | — |
| Nov 15, 2022 | PETC | CANCELLATION INSTITUTED NO. 999999 | — |
| Jun 17, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jun 17, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 17, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 17, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 17, 2020 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 13, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 27, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 27, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 6, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 6, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 21, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 21, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 18, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 1, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 1, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 1, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 12, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 12, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 12, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 12, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 12, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 11, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 4, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 4, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 4, 2019 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 3, 2019 | ALIE | ASSIGNED TO LIE | — |
| Mar 29, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 29, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 2, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 15, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 15, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 5, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 3, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 2, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 1, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 1, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 27, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |