USPTO serial 79241558
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark E. Olds
Mark E. Olds Muncy, Geissler, Olds & Lowe, P.C.125 S Royal StreetAlexandria, VA 22314United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric relays; [ scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, ] signaling, checking in the nature of supervision [ , life-saving and teaching ] apparatus and instruments, namely, [ electric resistors, fuses and ] controllers and voltage, current and power regulators and [ electric and power ] switches [ , ] * as well as * electronic speed and rotation controllers; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electricity conduits and electric relays; [ electric resistances; electric clips, namely, fuse clips for use with electronic glass and ceramic fuses; electricity terminals, namely, ] electrical terminal blocks and sockets; electrical connectors; electricity junction boxes; electronic connectors; electric cable connectors; [ connectors for electronic circuits; junction sleeves for electric cables; electric connectors; ] electric fuses being fuses for electric current; [ electric fuse boxes; metal alloy wires for electric fuses; accumulators; electric conductors; materials for electricity mains, namely, electric wires and cables; ] circuit breakers; [ switches, electric; printed circuits; ] electronic power regulators, namely, high-voltage regulators for electric power; power voltage regulators; voltage regulators; electric regulating apparatus; electric monitoring apparatus; electric control, [ testing ] and monitoring apparatus; namely, electric control devices for heating and energy management [ ; electric apparatus for commutation, namely, communicators and convertors; electronic circuits; electronic integrated circuits; electronic chips for manufacturing integrated circuits; heat regulating apparatus, namely, temperature sensors for regulating heat; heat detectors ] | ACTIVE | — |
| 017 | [ Electrical insulators; Insulators for electrical cables; dielectrics being electric insulators; insulators for electric mains ] | SECTION 7(e) - CANCELLED | — |
| 037 | [ Repair of electrical systems and electric relays; installation services of electrical systems and electric relays; installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, electric relays electricity conduits, electric resistors, fuses and controllers and voltage, current and power regulators and switches, electronic speed and rotation controllers; advisory services relating to the installation, maintenance and repair of mechanical and electrical equipment; installation, maintenance and repair of electric and electronic apparatus and equipment; installation, maintenance and repair of electronic control apparatus ] | SECTION 7(e) - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 30, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 30, 2025 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Sep 30, 2025 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Sep 8, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 6, 2025 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jan 10, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Sep 25, 2020 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Aug 30, 2020 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 17, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 30, 2019 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Dec 29, 2019 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Dec 27, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 27, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 27, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 27, 2019 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Aug 27, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 11, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 7, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 22, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 22, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 22, 2019 | NPUB | NOTICE OF PUBLICATION | — |
| May 4, 2019 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 3, 2019 | ALIE | ASSIGNED TO LIE | — |
| Apr 19, 2019 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Apr 19, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 19, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 19, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 19, 2019 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Apr 16, 2019 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Apr 3, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 3, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 3, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 9, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 23, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 23, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 13, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 11, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 10, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 9, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 9, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 27, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |