USPTO serial 79244173
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Mitsubishi Hitachi Power Systems Europe GmbH
Duisburg, DE
Other trademarks owned by Mitsubishi Hitachi Power Systems Europe GmbH
Mitsubishi Hitachi Power Systems Europe GmbH
Duisburg, DE
Other trademarks owned by Mitsubishi Hitachi Power Systems Europe GmbH
Mitsubishi Hitachi Power Systems Europe GmbH
Duisburg, DE
Other trademarks owned by Mitsubishi Hitachi Power Systems Europe GmbH
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anna King
Anna King Banner & Witcoff, Ltd.71 South Wacker DriveSuite 3600Chicago, IL 60606| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Combustible agglomerated fuels; pellets of compressed fiber manufactured from a plant crop to be used as fuel; biomass fuel; combustible briquettes; household fuel briquettes; fuel; hydrocarbon fuels; combustible fuels for use in heating apparatus; fuels for heating purposes; fuels and illuminants; fuel pellets; coal briquettes; manufactured solid fuels; wood briquettes and pellets for use as fuel; wood briquettes; wood heating pellets; wood chips for use as fuel; peat briquettes | SECTION 71 - CANCELLED | — |
| 007 | Waste crushing machines; waste converters being machines for crushing industrial waste; recycling machines being machines for crushing industrial waste; briquetting machines being machines for crushing industrial waste; steam engine boilers for steam generating as parts of machines; food waste disposal machines; machines for comminuting being machines for crushing industrial waste; machines for shredding horticultural waste; liquid waste removal machines; mills and crushing machines being machines for crushing industrial waste; spiral de-watering units being machines for removing water from solid substances, namely, fuels; wear segments for crushers being replacement parts for industrial waste crushing machines; scrap recovery apparatus being machines for crushing industrial waste; shredders for industrial use for waste; crushing machines for industrial purposes; comminutors for solid materials being machines for crushing industrial waste; crushing machines being machines for crushing industrial waste; recycling crushing units; size reduction machines for wood being machines for crushing wood; shredders for industrial use; feeding units for size reduction machines being conveyer systems, namely, conveyor belts for machines for crushing wood | SECTION 71 - CANCELLED | — |
| 011 | Wastewater treatment installations; waste water treatment tanks; wastewater treatment tanks for industrial purposes; sewage treatment installations for purification of waste water; purification installations for sewage; sewage disposal plants; sewage purification apparatus; wastewater purification units; apparatus for vapour producing installations being power-operated vaporizers for industrial or commercial purposes; steam generating apparatus; autoclaves, non electric, for sterilization of food for cooking and not for medical purposes; biological reactors for clarifying industrial effluents; bioreactors for use in the treatment of waste; bioreactors for use in the treatment of wastewater; burners for boilers; steam generating installations; steam generators; steam heating apparatus; steam boilers being boilers for heating, other than parts of machines; steam accumulators; electric dehydrators; heating apparatus for solid, liquid or gaseous fuels; heating apparatus for use in the treatment of waste material; heating boilers; industrial waste water purification plants being wastewater treatment installations for industrial use; industrial drying installations for heating and dehumidifying; purification installations for waste material; apparatus for drying for chemical processing; thermal treatment furnaces; reactors being industrial chemical installations; reactors for gas-solids reactions; reactor vessels; settler apparatus for waste being waste water treatment tanks; settler apparatus for sewage being waste water treatment tanks; water purification, desalination and conditioning installations | SECTION 71 - CANCELLED | — |
| 037 | Construction of drainage systems; installation of boilers; installation of storage facilities; installation of drying apparatus; installation, repair and maintenance of steam condensers; maintenance and repair of solid fuel boilers; boiler cleaning and repair; repair or maintenance of boilers; repair or maintenance of waste crushing machines and apparatus; repair of biogas plants and machines; boiler repair services; repair of machines for treating organic waste; repair of drying apparatus; routine servicing of drying apparatus being maintenance and repair services; maintenance and repair of storage installations | SECTION 71 - CANCELLED | — |
| 042 | Consultancy relating to biotechnology; biochemistry services; biochemistry research services; biochemical engineering services; biotechnological research relating to industry; research relating to biotechnology; design services relating to process systems for the biotechnology industry; design services relating to plant for the biotechnology industry; design of storage systems; writing of computer programs for biotechnological applications; research and development in the field of biotechnology; environmental monitoring of waste storage areas; environmental monitoring of waste treatment areas | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 27, 2026 | C71T | CANCELLED SECTION 71 | — |
| Nov 20, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 10, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Aug 16, 2023 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Aug 16, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 16, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 16, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 16, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 16, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 7, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 31, 2019 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Dec 31, 2019 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Dec 10, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 10, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 25, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 25, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 21, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 5, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 5, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 5, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 17, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 17, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 17, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 17, 2019 | ALIE | ASSIGNED TO LIE | — |
| May 10, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 16, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 25, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 24, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 11, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 10, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 27, 2018 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Nov 27, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 26, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 6, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 6, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 1, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |