Drawing for RIIFO

USPTO serial 79244201

RIIFO

Reviewed by CopyMark Law Group

Reg. 5864790Status 709
Filing date
Status date
Registration date
Sep 24, 2019
Examiner
KIDWELL WALKER, JACLYN NOEMI
Law office
TMO LAW OFFICE 113

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RIIFO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Tubes of metal; water-pipes of metal; elbows of metal for pipes; junctions of metal for pipes; drain pipes of metal; collars of metal for fastening pipes; ducts of metal, for central heating installations; branching pipes of metal; penstock pipes of metal; ducts of metal for ventilating and air conditioning installations; valves of metal, other than parts of machines; water-pipe valves of metal; drain traps being valves of metal; clips of metal for cables and pipes; screws of metal; ironmongery in the nature of small items of metal hardware, namely, springs, washers, bolts; hardware of metal, small; hooks being metal hardware; reels of metal, non-mechanical, for flexible hoses; trays of metal; metal pipe joints for water heating installationsSECTION 71 - CANCELLED—
011Taps being faucets; heating installations; hot water heating installations; central heating radiators; water distribution installations; pressure water tanks; radiators for household heating purposes; drains for the draining of water in sanitary installations; pipes being parts of sanitary installations; watering installations, automatic; bath tubs; bath fittings, namely, shower heads; flushing tanks being toilets; toilets being water-closets; showers; sinks; clean chambers being sanitary installations; heaters for baths; toilet water tanks; shower cubicles being enclosures; water filtering apparatus; filters for drinking water; water purifying apparatus and machines; bath installations; wash- hand basins being parts of sanitary installations; wash-hand bowls being parts of sanitary installations; sanitary apparatus and installations; toilet bowls; flushing apparatus for sanitary installations; urinals being sanitary fixturesSECTION 71 - CANCELLED—
017Synthetic rubber; water-tight rings for plumbing pipes; joint packings for pipes; synthetic resins being semi-processed; fittings, not of metal, for flexible pipes; fittings, not of metal, for rigid pipes; junctions, not of metal, for pipes; plastic film, other than for wrapping for packing, cushioning, or stuffing purposes; flexible hoses, not of metal; insulating materials; waterproof packings for use with sanitary installationsSECTION 71 - CANCELLED—
019Lumber; plywood; wooden floor boards; building stone; slate; plasterboard; cement; cement slabs; roofing tiles, not of metal; tiles, not of metal, for building; tiles, not of metal; fireproof cement coatings; refractory construction materials, not of metal; bitumen; non-metal water-resistant boards and panels for construction; water-pipes, not of metal; drain pipes, not of metal; rigid plastic pipes for use in building; rigid aluminum-plastic composite pipe; ducts, not of metal, for ventilating and air-conditioning installations; roof gutters, not of metal; water-pipe valves, not of metal or plastic; windows, not of metal; doors, not of metal; building materials, not of metal in the nature of stone veneers, PVC trim, marble, concrete-based slabs; cladding, not of metal, for building; rigid plastic board for construction; shutters, not of metal; rigid plastic rod for construction; advertisement columns, not of metal; building glass; coatings being building materials in the nature of non-metal cladding; works of art of stone, concrete or marble; memorial plaques, not of metal; binding agents for making stones, namely, concrete and mortar mixSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 10, 2026C71TCANCELLED SECTION 71—
Oct 17, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB—
Feb 7, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 17, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 17, 2020FIMPFINAL DISPOSITION PROCESSED—
Dec 24, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 7, 2019CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Sep 24, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 9, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 5, 2019CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 4, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 19, 2019NPUBNOTICE OF PUBLICATION—
Jun 5, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 4, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 4, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 4, 2019ALIEASSIGNED TO LIE—
May 30, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 5, 2019RFNTREFUSAL PROCESSED BY IB—
Dec 7, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 1, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 30, 2018RFRRREFUSAL PROCESSED BY MPU—
Nov 16, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 15, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 10, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 6, 2018DOCKASSIGNED TO EXAMINER—
Nov 6, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 1, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance