USPTO serial 79244210
VAYU 3D WIND ENERGY SYSTEMS
Reviewed by CopyMark Law Group
Reg. 5911019Status 709
- Filing date
- Status date
- Registration date
- Nov 19, 2019
- Examiner
- KIDWELL WALKER, JACLYN NOEMI
- Law office
- TMO LAW OFFICE 113
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with VAYU 3D WIND ENERGY SYSTEMS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Electrical energy from wind power | SECTION 71 - CANCELLED | — |
| 007 | Windmills; wind turbines; generators for wind turbines; turbines for power generation; turbines, other than for land vehicles; power transmission chains for use with wind turbines; turbine blades for power generation | SECTION 71 - CANCELLED | — |
| 037 | Repair services for electric generators and wind turbines; repair of turbines; installation services of windmills; installation services of wind turbines; installation services of generators for wind turbines; installation services of turbines for power generation; installation services of turbines, other than for land vehicles; installation services of power transmission chains; installation services of turbine blades for power generation; installation services of pinwheels; installation services of toys; installation services of toy windmills; installation services of turbines for land vehicles; repair and maintenance of wind turbines; repair and maintenance of generators for wind turbines; repair and maintenance of turbines for power generation; repair and maintenance of turbines, other than for land vehicles; repair and maintenance of power transmission chains; repair and maintenance of turbine blades for power generation; repair and maintenance of pinwheels; repair and maintenance of toys; repair and maintenance of toy windmills; repair and maintenance of turbines for land vehicles | SECTION 71 - CANCELLED | — |
| 040 | Energy production produced via wind; generation of electricity from wind energy | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by 3D Wind AG
- Other trademarks owned by 3D Wind AG
- Other trademarks owned by 3D Wind AG
- Other trademarks in Class 004
- Other trademarks in Class 007
- Other trademarks in Class 037
- Other trademarks in Class 040
- Similar marks named VAYU 3D WIND ENERGY SYSTEMS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 5, 2026 | C71T | CANCELLED SECTION 71 | — |
| Apr 20, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 27, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 11, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 11, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 19, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 19, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 3, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 30, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 14, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 14, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 14, 2019 | NPUB | NOTICE OF PUBLICATION | — |
| Aug 2, 2019 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Aug 1, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 1, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 1, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 24, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 24, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 22, 2019 | ALIE | ASSIGNED TO LIE | — |
| Jul 18, 2019 | NREV | NOTICE OF REVIVAL - MAILED | — |
| Jul 17, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 17, 2019 | PETG | PETITION TO REVIVE-GRANTED | — |
| Jul 17, 2019 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Jun 28, 2019 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 28, 2019 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Dec 21, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 1, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 30, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 16, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 15, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 6, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 6, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 1, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |