Drawing for VAYU 3D WIND ENERGY SYSTEMS

USPTO serial 79244210

VAYU 3D WIND ENERGY SYSTEMS

Reviewed by CopyMark Law Group

Reg. 5911019Status 709
Filing date
Status date
Registration date
Nov 19, 2019
Examiner
KIDWELL WALKER, JACLYN NOEMI
Law office
TMO LAW OFFICE 113

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with VAYU 3D WIND ENERGY SYSTEMS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy from wind powerSECTION 71 - CANCELLED—
007Windmills; wind turbines; generators for wind turbines; turbines for power generation; turbines, other than for land vehicles; power transmission chains for use with wind turbines; turbine blades for power generationSECTION 71 - CANCELLED—
037Repair services for electric generators and wind turbines; repair of turbines; installation services of windmills; installation services of wind turbines; installation services of generators for wind turbines; installation services of turbines for power generation; installation services of turbines, other than for land vehicles; installation services of power transmission chains; installation services of turbine blades for power generation; installation services of pinwheels; installation services of toys; installation services of toy windmills; installation services of turbines for land vehicles; repair and maintenance of wind turbines; repair and maintenance of generators for wind turbines; repair and maintenance of turbines for power generation; repair and maintenance of turbines, other than for land vehicles; repair and maintenance of power transmission chains; repair and maintenance of turbine blades for power generation; repair and maintenance of pinwheels; repair and maintenance of toys; repair and maintenance of toy windmills; repair and maintenance of turbines for land vehiclesSECTION 71 - CANCELLED—
040Energy production produced via wind; generation of electricity from wind energySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 5, 2026C71TCANCELLED SECTION 71—
Apr 20, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 27, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 11, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 11, 2020FIMPFINAL DISPOSITION PROCESSED—
Feb 19, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 19, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 3, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 30, 2019GPNXNOTIFICATION PROCESSED BY IB—
Aug 14, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 14, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 14, 2019NPUBNOTICE OF PUBLICATION—
Aug 2, 2019CNEAEXAMINERS AMENDMENT MAILED—
Aug 1, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 1, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Aug 1, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 24, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 24, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 22, 2019ALIEASSIGNED TO LIE—
Jul 18, 2019NREVNOTICE OF REVIVAL - MAILED—
Jul 17, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 17, 2019PETGPETITION TO REVIVE-GRANTED—
Jul 17, 2019PROATEAS PETITION TO REVIVE RECEIVED—
Jun 28, 2019MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 28, 2019ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Dec 21, 2018RFNTREFUSAL PROCESSED BY IB—
Dec 1, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 30, 2018RFRRREFUSAL PROCESSED BY MPU—
Nov 16, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 15, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 10, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 6, 2018DOCKASSIGNED TO EXAMINER—
Nov 6, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 1, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance