USPTO serial 79244684
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
83395 Freilassing, DE
83395 Freilassing, DE
Hawle Deutschland Armaturen GmbH
DE
83395 Freilassing, DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John W. McGlynn
John W. McGlynn RatnerPrestia2200 Renaissance Blvd, Suite 350King of Prussia, PA 19406UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Parts, predominantly made of metal, for gas and liquid braces, as far as contained in this class, in particular sleeves in the nature of cable junction sleeves of metal, shutters, sleeve shutters, all-purpose metal straps, shackles for lifting and rigging, caps for tubing ends, flanges, safety devices against traction, dirt and rotation in the nature of metal pipe safety fittings, fittings in the nature of fittings of metal for pipes, valves not being parts of machines, couplings in the nature of pipe couplings of metal, metal couplings for use with hydraulic and pneumatic systems; connecting systems consisting of mechanical fastening elements of metal, metal threaded fasteners, between a fitting and the aforesaid brace; accessories, namely, structural parts predominantly made of metal, for the aforesaid braces, namely, hand wheels, not being hand tools, position indicators in the nature of parts of pipe valves, dummy covers in the nature of housings, insertion pipes, nipples, ring-shaped fittings of metal; Metal shaft covers, height-adjustable and levellable shaft covers for manholes and their base components and frames, being structural parts; braces of metal for handling loads, namely, gas and liquid braces, in particular sliders, installation mountings, tapping braces, also for subsequent installation | ACTIVE | — |
| 008 | Hand-operated tools for assembling and disassembling, maintaining and repairing braces, in particular pipe assembly and disassembly devices in the nature Hand-operated pipe cutters, Manually operated hand tool for crushing pipes, Hand-operated tools for bending pipes, pipe bevelling devices, not being bevels, namely, hand-operated tools for bending pipes, pipe cutters, tapping devices in the nature of hand tools, namely, taps, hex keys, traction devices in the nature of hand tools, namely, socket sets consisting of socket end cups, and hand tools in the nature of hand operated pipe drills and drill bits, pipe drilling saddles, universal pipe saddles | ACTIVE | — |
| 011 | Hydrants, ventilating and evacuating valves, namely, butterfly valves not being parts of machines in the nature of plumbing fittings, automatic and manually-operated regulation valves for water and fluid supply, namely, Manually-operated plumbing valves, Regulating accessories for water supply, namely, metered valves; control valves, namely, plumbing fittings, namely, valves, water control valves for faucets, limiting valves for water and fluid supply with non-return and pressure reduction being plumbing fittings, float control valves for water and fluid supply with open/close control pressure retention being plumbing fittings, valves for water and fluid supply with float control being plumbing fittings, pipe-break safety valves, namely, safety accessories for gas pipes, namely, flashback arrestors and reverse flow check valves, hydraulic valves and flow control valve for water and fluid supply being plumbing fittings | ACTIVE | — |
| 017 | Parts, predominantly made of metal, for gas and liquid braces, namely, gaskets in the nature of pipe gaskets | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 22, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Apr 7, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Sep 5, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 16, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 15, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 7, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 12, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 17, 2020 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 7, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 1, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 1, 2020 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jan 21, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 21, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 1, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 1, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 1, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 16, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 11, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 11, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 11, 2019 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 9, 2019 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Sep 9, 2019 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 9, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 9, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 9, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 9, 2019 | ALIE | ASSIGNED TO LIE | — |
| Aug 2, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 2, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 2, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 22, 2019 | RFNP | REFUSAL PROCESSED BY IB | — |
| Feb 2, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 2, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 23, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 22, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 15, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 31, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 13, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 8, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 7, 2018 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Nov 1, 2018 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |