USPTO serial 79245305
EXYTE
Reviewed by CopyMark Law Group
Reg. 5893739Status 707Registered
- Filing date
- Status date
- Registration date
- Oct 29, 2019
- Examiner
- BULLOFF, TOBY ELLEN
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with EXYTE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Carole Klinger
Carole Klinger Fross Zelnick Lehrman & Zissu, P.C.151 West 42nd Street, 17th FloorNew York, NY 10036United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | [ Electronic apparatus and instruments for controlling, regulating and monitoring heating, air conditioning and ventilating installations for use in clean room installations; electronic control, regulating and monitoring apparatus and instruments, namely, thermostats, monitors and recording devices, measuring and control devices for pressure, temperature, consumption, and speed, all for control and monitoring of building and supply components, namely, air conditioners, clean rooms, clean air suppliers, and filter fan units; computers for monitoring and/or automating building control technology ] | SECTION 71 - CANCELLED | — |
| 011 | Fans, filters for the industrial air purification, air filter ventilator units, lights, ventilating apparatus for air conditioning as well as air conditioning apparatus, all being for use in clean rooms, climatic chambers, clean room ceilings, rotation locks and tunnel locks; all the aforementioned goods fitted to the use in grid ceilings, walls, floors, covering plates and partitions; heating and air conditioning installations for building technology; refrigerating, heating, drying and ventilating installations, equipment and apparatus; air conditioning equipment and apparatus and installations consisting thereof; dust, solvent vapour and oil mist extraction and separating apparatus and installations, all being for use in clean room installations or for use in the treatment of atmospheric gases; fans for the aforementioned goods | ACTIVE | — |
| 037 | Building construction supervision, assembly services relating to the installation and installation services in the field of building technology and process technology installations for air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; maintenance in the field of repair and cleaning of semi-conductor factories; construction of semi-conductor factories, assembly services relating to the installation and installation services relating to the building of semi-conductor factories; installation and assembly services relating to the installation of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; implementation of maintenance and inspection works in the context of maintenance and inspection intervals stipulated by the manufacturer and repair and maintenance of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; assembly services relating to the installation and installation of environmental protection apparatus and devices for existing factories | ACTIVE | — |
| 042 | Technical planning of building technology and process technology installations for the air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; performance of technical inspections of statutory operability of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; building technology services, namely, performance of technical inspections of operability of building technology installations and of technical production and process flow; technical planning and consultancy therefor relating to implementation of production process and flow in the field of microelectronics, the pharmaceutical industry and the food industry; technical planning and consultancy therefor relating to design and engineering of environmentally-friendly microelectronics; technological consultancy for the design and engineering of environmentally-friendly microelectronics; technical consultancy in the redesigning of semi-conductor factories; technical consultancy in the fields of energy measurement for improving ecological efficiency and energy saving and recycling technology; technical planning relating to the design and engineering of semi-conductor factories; technical planning, performance of technical inspection, as well as certification of clean rooms and all types of technical building equipment at the stages of planning, installation, function and performance, and of the documentation therefore in the context of technical project management and performance of technical inspections; technical planning relating to the design and engineering of building and process technology installations | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Exyte GmbH
- Other trademarks owned by Exyte GmbH
- Other trademarks owned by Exyte AG
- Other trademarks owned by Exyte AG
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named EXYTE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Aug 20, 2026 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Aug 10, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 29, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Nov 14, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 20, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| May 8, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Mar 13, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 22, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 21, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 29, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 29, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 13, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 9, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 24, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 24, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 24, 2019 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 11, 2019 | ALIE | ASSIGNED TO LIE | — |
| Jul 1, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 25, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 24, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 24, 2019 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jun 11, 2019 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 10, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 5, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 4, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 4, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 19, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 1, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 24, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 5, 2019 | RFNP | REFUSAL PROCESSED BY IB | — |
| Dec 4, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 4, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 23, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 21, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 20, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 19, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 19, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 15, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |