USPTO serial 79245960
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Benjamin M. Cantor
Benjamin M. Cantor Cantor Colburn LLP20 Church StreetFloor 22Hartford, CT 06103| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Lintels, not of metal; concrete; cement; concrete building elements, namely, panels; prefabricated non-metal buildings; structures in the nature of prefabricated non-metal bridges; concrete floors; concrete walls; concrete beams; blocks of concrete; concrete slabs; concrete panels; non-metallic prefabricated building components, namely, portal frames; non-metallic prefabricated building elements, namely, wall panels and portal frames for on-site assembly; framework, not of metal, for building | SECTION 71 - CANCELLED | — |
| 037 | Building construction and repair; repairing construction works; heavy engineering construction , namely, construction of retaining walls and bridges; construction of bridges; construction of tunnels; coating of concrete; construction of foundations for civil engineering structures; construction of civil engineering structures by forming concrete; construction of civil engineering structures by pouring concrete; construction of civil engineering structures by laying concrete; construction of portal frames; construction of walls; construction services, namely, retaining walls construction; construction of partition walls for building interiors; infrastructure construction, namely, roads construction; construction of carriageways | SECTION 71 - CANCELLED | — |
| 042 | Engineering drawing services; technical project studies in the field of construction, namely, research on building construction; technical research in the field of engineering; conducting engineering feasibility studies in the field of construction engineering; engineering project studies, namely, conducting scientific feasibility studies in the field of engineering; technical engineering; structural engineering services; engineering consultancy services; design services relating to civil engineering; technical consultancy services relating to structural engineering; engineering design services; engineering services for the design of structures; engineering services for the analysis of structures; conducting technical project studies, namely, research on building construction; engineering services in the field of roads and railways construction; construction drafting | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 14, 2026 | C71T | CANCELLED SECTION 71 | — |
| Jan 28, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 29, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 12, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 12, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 28, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 28, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 12, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 12, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 8, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 23, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 23, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Oct 23, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 9, 2019 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 4, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 4, 2019 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Sep 17, 2019 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Sep 2, 2019 | ALIE | ASSIGNED TO LIE | — |
| Aug 26, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 8, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 8, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 8, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 2, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 11, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 10, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 2, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 1, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 29, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 30, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 26, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 22, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |