USPTO serial 79248299
SENVION WE MAKE WIND PERFORM.
Reviewed by CopyMark Law Group
Reg. 5940617Status 709
- Filing date
- Status date
- Registration date
- Dec 24, 2019
- Examiner
- SABAGH, LAILA TAREK
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with SENVION WE MAKE WIND PERFORM.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Wind-powered machines, namely, wind-powered electricity generators, and wind-powered machines for generating electrical and mechanical energy; turbines, in particular wind turbines, except for land vehicles; structural parts and accessories for wind-powered electricity generators and wind-powered machines for generating electrical and mechanical energy, in particular rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generator, emergency power generators | SECTION 71 - CANCELLED | — |
| 009 | Electric installation material, namely, switch cabinets in the nature of switch boxes designed to house electric switches; electric and electronic instruments and apparatus for recording, processing, storage and transmission of data, namely, computer hardware, electronic data processing apparatus; voltage regulators for electric power, apparatus for regulating electric current, electricity limiters; electrical and electronic regulating, checking, control and monitoring apparatus and instruments, namely, electric or electronic monitors, meter and sensors for measuring turbine performance and power generation in wind power plants; data processing equipment; computers; computer software for acquisition of wind turbine data, data management of wind power plants, operating, regulating and controlling wind turbines and data transmission with wind turbines; computer network interface devices; voltage surge protectors; vibration sensors; watt-hour meter; electric converters, namely, inverter units; electric transformers; all afore-mentioned goods for wind power plants and wind farms | SECTION 71 - CANCELLED | — |
| 035 | Professional business consultancy with regard to wind power plants and wind farms | SECTION 71 - CANCELLED | — |
| 037 | Building construction in the field of wind power plants; installation of wind power plants; installation services for wind farms, namely, installation of wind turbines; maintenance services in the nature of repairing wind power plants, rebuilding machines that have been worn or partially destroyed, namely, wind power plants; maintenance and repair of wind power plants; assembly services as a part of the installation of rotor blades for others | SECTION 71 - CANCELLED | — |
| 040 | Production of energy using wind power; production of electricity using wind power | SECTION 71 - CANCELLED | — |
| 042 | Remote control and monitoring services, namely, remote maintenance through computerised retrieval of wind power plants and wind farms, in particular via the Internet; conducting technical measurements, inspections and calculations in the range of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the field of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; engineering services in the nature of technical planning and development, as well as engineering technical project management and consultancy therefor in the field of wind power plants; engineering services for calculation, dimensioning and design of rotor blades; technical research for wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; quality control, namely, technical condition monitoring of rotor blades | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Senvion GmbH
- Other trademarks owned by Senvion GmbH
- Other trademarks owned by Senvion GmbH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named SENVION WE MAKE WIND PERFORM.
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 10, 2026 | C71T | CANCELLED SECTION 71 | — |
| May 21, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 24, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 2, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 2, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 24, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 24, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 8, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 5, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 18, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 18, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 18, 2019 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 5, 2019 | ALIE | ASSIGNED TO LIE | — |
| Sep 4, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 3, 2019 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Sep 3, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 3, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 22, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 13, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 12, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 12, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 19, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 2, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 17, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 17, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 8, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 5, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 4, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 4, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 4, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 27, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |