Drawing for SENVION WE MAKE WIND PERFORM.

USPTO serial 79248299

SENVION WE MAKE WIND PERFORM.

Reviewed by CopyMark Law Group

Reg. 5940617Status 709
Filing date
Status date
Registration date
Dec 24, 2019
Examiner
SABAGH, LAILA TAREK
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SENVION WE MAKE WIND PERFORM.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Wind-powered machines, namely, wind-powered electricity generators, and wind-powered machines for generating electrical and mechanical energy; turbines, in particular wind turbines, except for land vehicles; structural parts and accessories for wind-powered electricity generators and wind-powered machines for generating electrical and mechanical energy, in particular rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generator, emergency power generatorsSECTION 71 - CANCELLED—
009Electric installation material, namely, switch cabinets in the nature of switch boxes designed to house electric switches; electric and electronic instruments and apparatus for recording, processing, storage and transmission of data, namely, computer hardware, electronic data processing apparatus; voltage regulators for electric power, apparatus for regulating electric current, electricity limiters; electrical and electronic regulating, checking, control and monitoring apparatus and instruments, namely, electric or electronic monitors, meter and sensors for measuring turbine performance and power generation in wind power plants; data processing equipment; computers; computer software for acquisition of wind turbine data, data management of wind power plants, operating, regulating and controlling wind turbines and data transmission with wind turbines; computer network interface devices; voltage surge protectors; vibration sensors; watt-hour meter; electric converters, namely, inverter units; electric transformers; all afore-mentioned goods for wind power plants and wind farmsSECTION 71 - CANCELLED—
035Professional business consultancy with regard to wind power plants and wind farmsSECTION 71 - CANCELLED—
037Building construction in the field of wind power plants; installation of wind power plants; installation services for wind farms, namely, installation of wind turbines; maintenance services in the nature of repairing wind power plants, rebuilding machines that have been worn or partially destroyed, namely, wind power plants; maintenance and repair of wind power plants; assembly services as a part of the installation of rotor blades for othersSECTION 71 - CANCELLED—
040Production of energy using wind power; production of electricity using wind powerSECTION 71 - CANCELLED—
042Remote control and monitoring services, namely, remote maintenance through computerised retrieval of wind power plants and wind farms, in particular via the Internet; conducting technical measurements, inspections and calculations in the range of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the field of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; engineering services in the nature of technical planning and development, as well as engineering technical project management and consultancy therefor in the field of wind power plants; engineering services for calculation, dimensioning and design of rotor blades; technical research for wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; quality control, namely, technical condition monitoring of rotor bladesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 10, 2026C71TCANCELLED SECTION 71—
May 21, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 24, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 2, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 2, 2020FIMPFINAL DISPOSITION PROCESSED—
Mar 24, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 24, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 8, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 5, 2019GPNXNOTIFICATION PROCESSED BY IB—
Sep 18, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 18, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 18, 2019NPUBNOTICE OF PUBLICATION—
Sep 5, 2019ALIEASSIGNED TO LIE—
Sep 4, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 3, 2019CNEAEXAMINERS AMENDMENT MAILED—
Sep 3, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Sep 3, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 22, 2019DOCKASSIGNED TO EXAMINER—
Jul 13, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 12, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 12, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 19, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 2, 2019RFNTREFUSAL PROCESSED BY IB—
Jan 17, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 17, 2019RFRRREFUSAL PROCESSED BY MPU—
Jan 8, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 5, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 4, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 4, 2019DOCKASSIGNED TO EXAMINER—
Jan 4, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 27, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance