Drawing for SIMS

USPTO serial 79248400

SIMS

Reviewed by CopyMark Law Group

Reg. 5836967Status 709
Filing date
Status date
Registration date
Aug 20, 2019
Examiner
COLTON, BRITTANY
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SIMS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Anna L. King

Anna L. King Banner & Witcoff, Ltd.71 South Wacker Drive, Suite 3600Chicago, IL 60606UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electronic control, metering, monitoring, regulating apparatus and checking instruments for fluids, condensation, gases and steam; eye sight glasses for use with fluid and steam control apparatus and check valves fitted with eye sight glasses; automatic valves operated automatically by electric or electronic control by solenoid or by temperature or other changes in physical conditions; pressure gauges; apparatus, equipment and instruments namely, electronic controllers for remotely controlling, metering, monitoring, communicating with and measuring and reporting the efficiency, performance and energy consumption of industrial systems, industrial apparatus, steam systems, components of steam systems, steam traps, valves, filters, strainers, pumps, separators, air compressors, lubricators, regulators, gauges, boilers, boiler systems, heat exchangers, heating installations, steam heaters, and steam producing apparatus; computer software for remotely controlling, metering, monitoring, communicating with and measuring and reporting the efficiency, performance and energy consumption of industrial systems, industrial apparatus, steam systems, components of steam systems, steam traps, valves, filters, strainers, pumps, separators, air compressors, lubricators, regulators, gauges, boilers, boiler systems, heat exchangers, heating installations, steam heaters, and steam producing apparatus; wireless communication devices for transmitting and receiving data on the efficiency, performance and energy consumption of industrial systems, industrial apparatus, steam systems, components of steam systems, steam traps, valves, filters, strainers, pumps, separators, air compressors, lubricators, regulators, gauges, boilers, boiler systems, heat exchangers, heating installations, steam heaters, and steam producing apparatus; programmable electronic controllers for thermal energy apparatus; electronic apparatus for the remote control of industrial operations; electronic apparatus for the remote control of industrial operations; structural parts, fittings and accessories for all the aforesaid goodsSECTION 71 - CANCELLED—
042Professional consultations and advice relating to engineering, and design and development of fluid and steam control systems; conducting scientific feasibility studies relating to engineering, and fluid and steam control; technological, research and consultation services relating to engineering, and design and development of fluid and steam control; construction drafting, engineering, industrial design and mechanical research; technical consultancy and technical advisory services relating to custom construction, repair, installation, commissioning and maintenance of engineering systems, and fluid or steam control systems; inspection and safety audit of engineering systems, namely, inspection services in the course of installation of steam systems, steam traps, valves, filters, strainers, pumps, separators, air compressors, lubricators, regulators, gauges, boilers, boiler systems, heat exchangers, heating installations, steam heaters, and steam producing apparatus; remotely monitoring, measuring and reporting the condition, efficiency, performance and energy consumption of industrial systems, industrial apparatus, steam systems, components of steam systems, steam traps, valves, filters, strainers, pumps, separators, air compressors, lubricators, regulators, gauges, boilers, boiler systems, heat exchangers, heating installations, steam heaters, and steam producing apparatus, including by means of a secure online portal accessible through a global computer network; providing online non-downloadable software for remotely controlling, metering, monitoring, communicating with and measuring and reporting the efficiency, performance and energy consumption of industrial systems, industrial apparatus, steam systems, components of steam systems, steam traps, valves, filters, strainers, pumps, separators, air compressors, lubricators, regulators, gauges, boilers, boiler systems, heat exchangers, heating installations, steam heaters, and steam producing apparatus, including by means of a secure online portal accessible through a global computer network; installation, updating, maintenance and repair of computer software, computer programs and computer systems; professional consultations and advice relating to the remote monitoring and control of industrial systems, steam systems, boiler systems and fluid and steam control equipment; conducting engineering surveys of industrial premises; monitoring of industrial fluid and steam systems, industrial fluid and steam apparatus, steam systems, components of steam systems, steam traps, valves, filters, strainers, pumps, separators, air compressors, lubricators, regulators, gauges, boilers, boiler systems, heat exchangers, heating installations, steam heaters, and steam producing apparatus to ensure proper functioning, and preparation of quality control reports relating to the efficiency, performance and energy consumption thereof; information, advisory and consultancy services relating to the aforesaid servicesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 6, 2026C71TCANCELLED SECTION 71—
Aug 20, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 25, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 3, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 18, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 18, 2019FIMPFINAL DISPOSITION PROCESSED—
Nov 20, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 20, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 1, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 4, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 4, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 15, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 26, 2019ALIEASSIGNED TO LIE—
Apr 16, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Apr 16, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 16, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 16, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 15, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 14, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 14, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 16, 2019RFNTREFUSAL PROCESSED BY IB—
Jan 26, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 26, 2019RFRRREFUSAL PROCESSED BY MPU—
Jan 12, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 11, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 9, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 5, 2019DOCKASSIGNED TO EXAMINER—
Jan 5, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 27, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance