USPTO serial 79248971
SIKO
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 29, 2020
- Examiner
- PAINTER, VALERIYA SHERMAN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with SIKO?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*
Plus Government fees of $650
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
CH
CH
CH
CH
CH
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus for recording, transmission or reproduction of sounds or images; microprocessors; downloadable computer software for calculating the speed and temperature limits of turbocharger rotor components; lasers not for medical use; chargers for electric storage batteries; electronic, magnetic and optical memories, and data protection devices, namely computer memory hardware; computer peripheral devices; electronic memories for data processing apparatus; fuses included in this class; electrical and electronic installations for the remote control of industrial automated operations, involving electronic bulletin boards, and acoustic and optical alarms; home and office automation systems consisting of wired controls and wireless controls, remote control devices, network devices in the nature of network routers, applications for connecting, operating, and managing the operation of security systems, fire alarms, heating, ventilation and air conditioning systems, lighting controls, indoor air quality systems, water purification systems, smart thermostats, and automation devices for offices and for the home in the internet of things (IoT) and other home and business monitoring and control applications; downloadable mobile applications for remote control, administration, modification and control of home security and automation devices and Internet of Things applications; downloadable computer software for the collection and distribution of data in computer networks for the communication of data between application programs, consumer apparatus and industrial apparatus; downloadable cloud computer software for information management, data compilation and data analysis for asset optimization, industrial automation, machine diagnostics as well as for the optimization of administrative procedures in the field of power generation; downloadable software for information management, data compilation and data analysis for asset optimization, industrial automation, machine diagnostics and optimization of administrative procedures in the field of power generation; electric sensors, downloadable computer software and computer hardware for data compilation, data organization, data distribution and data analysis, administration, control, automation and connection of networks between instruments, apparatus, sensors and control systems for use in home automation; downloadable computer software for monitoring and controlling communication between computers in automatic machine systems; downloadable cloud computing software for data compilation, data organization, data distribution and data analysis and for use in the administration, control, automation and connection of networks between apparatus, instruments, sensors and control systems in the fields of home automation, infrastructure management, building management, power grids, power generation, industrial automation, automation of industrial processes, transportation and infrastructure; downloadable software for compiling, organizing, distributing and analyzing data and for controlling, automating and connecting networks between instruments, apparatus, sensors and control systems in the fields of home automation, infrastructure management, building management, power grids, power generation, industrial automation, automation of industrial processes, transportation and infrastructure | ACTIVE | — |
| 042 | Scientific and industrial research in the field of network technology; creation of data processing computer programs; providing temporary use of non-downloadable computer programs for controlling electricity generating power plants, industrial plants, buildings and networks for the transport of electric energy, gas and oil; providing technical information relating to the use of computers, computer hardware, computer software and computer networks provided on-line from a computer database or via computer networks; materials testing; industrial design; packaging design; quality control for others; underwater exploration; testing of raw materials; technical consulting services relating to pollution detection and testing or and research on prevention of pollution; computer software design, in particular in the field of computer security; network engineering services including consulting in the field of computer and network security; scientific and industrial research in the field of network technology; updating of computer software; carrying out chemical analyses; oil prospecting; monitoring of oil wells; preparation of analyses for oil-field exploitation; oil-field surveys; architectural services; physics research; chemical research; services provided by a physicist, namely, physics research; computer consulting services, particularly in the field of technical security; reconstitution of computer data; maintenance of computer software; computer system analysis; research and development of new products; research in the field of machine construction and engineering; technical surveying; engineering services, namely, consulting in the field of engineering, in particular advice in the field of technical security; engineering services, namely, technical project planning as well as relevant advice in the field of energy usage management and energy efficiency; rental of software and data processing apparatus; software development services; engineering design services; technological monitoring and quality control of mechanical and computer systems to ensure proper functioning in the field of power distribution networks, machinery and machine tools; measurement and monitoring of electricity consumption of machinery and machine tools for electricity producers; monitoring for error detection in transmission and distribution systems, machines and machine tools to ensure proper functioning; computer programming services; industrial analysis services relating to computer software; analysis, design and programming services related to computer systems and networks; providing online non-downloadable software for customers for administration, management, modification and remote control of automation apparatus and home automation apparatus; computer services, in particular providing web-based systems and online portals featuring software for administration, management, modification and remote control of automation apparatus and home automation apparatus; computer platform as a service (PaaS) with software platforms for information management, data compilation and data analysis for asset optimization, industrial automation, machine diagnostic and optimization of administrative procedures in the field of power generation, health care, manufacturing and infrastructure; cloud computing featuring software for information management, data compilation and data analysis in the field of for asset optimization, industrial automation, machine diagnostic and optimization of administrative procedures in the field of power generation, healthcare, manufacturing and infrastructure; provision of online non-downloadable cloud computing software for information management, data compilation and data analysis for asset optimization, industrial automation, machine diagnostic and optimization of administrative procedures in the field of power generation, healthcare, manufacturing and infrastructure; technical consulting services relating to the optimization of power plants, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; engineering services relating to the optimization of power plants, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; engineering and technical and technological consultancy services related to testing and evaluation of power plant equipment to improve performance and efficiency of such equipment for owners and operators of industrial, commercial and government facilities; engineering and technical advice relating to energy measurement and monitoring to improve energy efficiency for owners and operators of industrial, commercial and government facilities; diagnostic services consisting of data analysis to identify the status of parts of turbochargers in the fields of energy production and distribution, oil or gas installations, control systems, machinery and machine tools, computer hardware and computer software, and installation, maintenance and technical advice relating to computer software related thereto; technological advice in the field of electrical installations, control systems, automation systems, power plants, oil and gas installations, machinery and machine tools, energy production and distribution and computer hardware and software; provision of temporary non-downloadable software applications for enabling use of a cloud computing network and its respective access; monitoring of software systems through remote access | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Accelleron Switzerland Ltd
- Other trademarks owned by Turbo Systems Switzerland Ltd
- Other trademarks owned by ABB Schweiz AG
- Other trademarks owned by ABB Schweiz AG
- Other trademarks owned by ABB Schweiz AG
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named SIKO
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 29, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 4, 2025 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 18, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 6, 2022 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Apr 18, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 31, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 31, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 29, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 29, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 25, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 13, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 13, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 30, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 30, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 23, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 8, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 4, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 4, 2020 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Sep 3, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 3, 2020 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jun 19, 2020 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 3, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 3, 2020 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 29, 2020 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 29, 2020 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 29, 2020 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 25, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 25, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 25, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 30, 2019 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 30, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 30, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 19, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 19, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 9, 2019 | ALIE | ASSIGNED TO LIE | — |
| Aug 2, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 2, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 11, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 11, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 2, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 1, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 31, 2019 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Jan 20, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 19, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 18, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 14, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 14, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 3, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |