Drawing for PANDROL

USPTO serial 79249262

PANDROL

Reviewed by CopyMark Law Group

Reg. 6035868Status 708Registered
Filing date
Status date
Registration date
Apr 21, 2020
Examiner
NEVILLE, BRIAN
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with PANDROL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Julie E. Reitz

Julie E. Reitz HONIGMAN LLP39400 WOODWARD AVE STE 101BLOOMFIELD HILLS, MI 48304-5151United States

Goods and services

ClassDescriptionStatusFirst use
007machines for railway construction, repair and maintenance; [ rail-laying machines; machines and machine tools for installing and replacing railway sleepers; ] welding machines, namely, electric welding machines; power-operated rail saws; grinding machines for the treatment of metal; drilling machines; ballast tamping machines, namely, machines for packing track ballasts under railway tracks to increase their durability; rail reprofiling machines in the nature of grinding machines; rail polishing machines; [ machines for installing, removing, tightening and loosening rail fastenings and bolted components therefor; power-operated lifting machines for moving railway pieces, including rails and sleepers; conveyors being machines; hydraulically actuated tools for laying railway lines and sleepers, and for inserting or removing rail fastenings; engines, other than for land vehicles; shaft couplings and drive belts for engines, other than for land vehicles engines; parts, fittings and component part accessories for rail-laying machines, machines and machine tools for installing and replacing railway sleepers, welding machines, ] rail saws and grinding machines namely, brackets, grapple claws, rotors, gauges, mechanized lifting systems comprised of wrenches, wrench handles, spike pullers and drivers, hooks, hydraulic pumps; power operated safety systems comprised of power units, grinders, safety frames, rollers; and clipping tools, namely, mechanized clipping tools for installing and removing rail fasteningsACTIVE—
008Hand-operated tools for use in installing and removing railway tracks and railway track fasteningsACTIVE—
009[ Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; electrical controlling devices for the electrification of railway lines; electric conductor rails; electric cables; protective clothing, namely, clothing for protection against fire, electricity and accidents; ] electronic measuring and monitoring goods for the railway industry, namely, electronic monitors and monitor modules for monitoring electric rail current and associated electrical signals; electronic equipment for use in condition monitoring in the railway industry, namely, electronic monitors and monitor modules, computer hardware and recorded software system for remotely monitoring railway and train conditions; railway stress gauges in the nature of strain gauges; electronic rail temperature monitors; remote monitoring equipment for the railway industry, namely, wireless communication devices for relaying data about railway and train conditions; data processing equipment for the railway industry, namely, computers; software for the railway industry, namely, software for monitoring, analysing and reporting on railway and train condition; [ railway signaling equipment, namely, railway signals, train control magnets, mounting systems, anti-trip devices, cable guards, insulators, and signboard supports all for use with railway signals; ] railway testing, measuring and detection equipment, namely electronic remote condition and fault monitoring equipment capable of detecting wheel flats and bogie hunting, and for monitoring rail temperatures, strain or ground disturbance; [ magnetic or electronic recording supports, namely, magnetic data carriers being blank; ] parts, fittings and accessories for electric conductor rails, namely, insulators, brackets, anchors, expansion joints, coextruded rail, covers and cable terminalsACTIVE—
037Installation, repair, maintenance and routine servicing of [ railways and ] railway equipment; installation and repair of [ railways and ] railway equipment by means of welding; consultancy and advisory services in relation to railway system construction, servicing, maintenance and repairACTIVE—
040[ Treatment of materials in the nature of metal; rail grinding services; welding services ]SECTION 71 - CANCELLED—
042Engineering services, namely, analyzing and reporting on data relating to the structural integrity and proper functioning of railways [ and trains thereon ] ; engineering and systems analysis of data relating to the structural integrity and proper functioning of railways [ and trains thereon ] ; design and development of computer software for railway and train condition monitoring; providing online non-downloadable software for monitoring the condition of railways [ and trains thereon ] ; calibration of monitoring and measuring equipment for use in the rail industry; railway engineering consultancy and advisory services concerning the condition monitoring of railways; quality control inspection and quality testing of railways and railway equipmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 5, 2026NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Aug 5, 2026C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jul 27, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 17, 2026ES75TEAS SECTION 71 & 15 RECEIVED—
Oct 10, 2025EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Oct 10, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 10, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 10, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 10, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 10, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 21, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 12, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 25, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 26, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 5, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 27, 2020FIMPFINAL DISPOSITION PROCESSED—
Jul 21, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 21, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 4, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 4, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 31, 2020GPNXNOTIFICATION PROCESSED BY IB—
Jan 15, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 15, 2020OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 15, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 27, 2019PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 27, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 19, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Dec 19, 2019ALIEASSIGNED TO LIE—
Dec 19, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 19, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 19, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 24, 2019GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 24, 2019GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 24, 2019CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 1, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 31, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 31, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 31, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 31, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 30, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 30, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 8, 2019DOCKASSIGNED TO EXAMINER—
Feb 16, 2019RFNPREFUSAL PROCESSED BY IB—
Jan 31, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 30, 2019RFRRREFUSAL PROCESSED BY MPU—
Jan 19, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 17, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 16, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 15, 2019DOCKASSIGNED TO EXAMINER—
Jan 15, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 14, 2019LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Jan 10, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance