Drawing for MAIKE

USPTO serial 79249628

MAIKE

Reviewed by CopyMark Law Group

Reg. 5929279Status 706Registered
Filing date
Status date
Registration date
Dec 10, 2019
Examiner
BIACHE, AUBREY
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with MAIKE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dana Stewart-Mekdara

Dana Stewart-Mekdara Global Trademarks, Inc.505 S. Villa Real Drive, Suite 102Anaheim Hills, CA 92807United States

Goods and services

ClassDescriptionStatusFirst use
006Casings of metal for oilwells; ducts of metal for ventilating and air-conditioning installations; hardware of metal, small, namely, nuts, springs; [ anchors; ] nozzles of metal, namely, metal, wash down spray nozzles for commercial and industrial use; jets of metal, namely, metal welding rods; elbows of metal for pipes; oil nozzle, namely, non-automatic fueling nozzles; pipe joints of metal; valves of metal, other than parts of machines; fittings of metal for pipes; reinforcing materials of metal for pipes; collars of metal for fastening pipes; metallic drain traps being valves of metal; water-pipe valves of metal; manifolds of metal for pipelines; steel pipes; rope thimbles of metal; ducts and pipes of metal for central heating installations; water-pipes of metal; sleeves being metal hardware, namely, metal expanding sleeves for affixing screws; drain pipes of metal; pipes of metal; pipe muffs of metal; fittings of metal for compressed air lines; metal cylinder, namely, metal cylinders for compressed gas or liquids, sold empty; pipework of metal; cable thimbles of metal; ducts of metal for ventilating and air-conditioning equipment; penstock pipes of metal; canal pipes of metal, namely, metal drain pipes; [ cable joints of metal, non-electric, namely, structural joint connectors of metal; safety chains of metal; grease nipples; ] metal ring for fastening pipes, namely, metal pipe connectors; pipe clamp of metal; casing of metal for rope, namely, rope thimbles of metal; ducts of metal, for central heating installations; pipes of metal, for central heating installations; railway points; [ steel wire; locks of metal, other than electric; safes being strong boxes; transport pallets of metal; ] containers of metal for storage and transport of goods; [ badges of metal for vehicles; soldering wire of metal; identification bracelets of metal, for hospitals ]ACTIVE—
011Taps for pipes, namely, cocks in the nature of plumbing fittings, spigots, and faucets; drip irrigation emitters being irrigation fittings, namely, irrigation spray nozzles; watering installations, automatic, namely, irrigation sprinklers; water faucets; anti-splash tap nozzles; faucets for pipes; heating installations; hot water heating installations; central heating radiators; humidifiers for central heating radiators; water distribution installations; pipes [parts of sanitary installations]; water conduits installations; fountains; pressure water tanks; ornamental fountains; washers for water taps; mixer taps for water pipes; regulating and safety accessories for water apparatus; water intake apparatus; expansion tanks for central heating installations; water tower; central heating slice; floor drain; metal pipe components for water heating equipment, including pipe steam valve, pipe water valve, water nozzle, three direction pipe joint, four direction pipe joint, pipe joint; pipe hoop, pipe supplement; heat accumulators; anti-splash faucet nozzles; water-pipes for sanitary installations; [ decorative fountains; lighters; blast burner; gas lighters; heating apparatus, electric; boilers, other than parts of machines; polymerisation installations; ] taps [faucets]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 9, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Apr 9, 202671AGREGISTERED-SEC.71 ACCEPTED—
Apr 6, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 8, 2025ES71TEAS SECTION 71 RECEIVED—
Dec 10, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 22, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 26, 2020XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Mar 26, 2020XXCRGENERIC MADRID TRANSACTION CREATED—
Mar 10, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 10, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 6, 2019CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Oct 5, 2019GPNXNOTIFICATION PROCESSED BY IB—
Sep 24, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 24, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 18, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 18, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 12, 2019CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 4, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 16, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 16, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Aug 16, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 16, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 16, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 18, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 18, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 18, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 22, 2019RFNTREFUSAL PROCESSED BY IB—
Feb 7, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 7, 2019RFRRREFUSAL PROCESSED BY MPU—
Jan 29, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 28, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 22, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 17, 2019DOCKASSIGNED TO EXAMINER—
Jan 17, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 10, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance