Drawing for NISSENS COOLING SOLUTIONS

USPTO serial 79252756

NISSENS COOLING SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 5969735Status 708Registered
Filing date
Status date
Registration date
Jan 28, 2020
Examiner
FALK, JONATHAN ROBERT
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with NISSENS COOLING SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Arlene D. Hanks

Arlene D. Hanks Moore & Van Allen PLLC100 N. Tryon Street, Suite 4700Charlotte, NC 28202United States

Goods and services

ClassDescriptionStatusFirst use
007Coolers for engines and machines, namely, oil coolers, intercoolers and combined air/oil coolers, coolers for converters coolers for wind turbines; coolers for generators; [ coolers for hydraulic circuits machines; cooling fans for motors; ] cooling modules for engines and machines; heat exchangers being parts of machines; [ condensing installations, namely, mechanical condensers, air condensers, air-cooled condensers; pumps, compressors and fans, namely, electric pumps, pumps for cooling engines, fans for machine engines, electric compressors, air compressors, centrifugal compressors, refrigerator compressors, gas compressors and compressors as parts of machines, motors and engines; compressors for machines; fans for engines and machine engines; pumps as parts of machines, motors and engines; pump systems as parts of machines, motors and engines; ] pump assemblies as parts of machines, motors and engines; [ hydraulic power units for machines; hydraulic units for power transmission to machines; ] all of the aforementioned goods for use in renewable energy and industrial applicationsACTIVE—
009[ Coolers for electric transformers; coolers for power electronics namely, coolers for electrical power supplies, power conversion devices, power converters, power inverters, power controllers, electrical transformers, and electronic power supplies for driving electric motors ]SECTION 71 - CANCELLED—
011[ Electric coolers, including oil coolers, intercoolers and combined air/oil coolers; cooling apparatus and installations, namely, air cooling apparatus, oil cooling apparatus, cooling installations for water, and cooling domes; refrigeration apparatus and installations; cooling modules, namely, cooling evaporators, air cooling apparatus, oil cooling apparatus, and cooling installations for water; heaters, namely, water heaters, storage heaters, electric heaters for industrial use; heat exchangers not parts of machines; heat accumulators; heat pumps; heat generators; heat installations; gas condensers except parts for machines; thermostatic valves; air conditioning apparatus and installations; fans, namely, electric fans, fans for air conditioning apparatus and ventilating fans for industrial purposes; electric fans; ventilating installations and apparatus, namely, ventilating fans for industrial use, air-ventilation apparatus and instruments, ventilating louvers, ventilation hoods; air cooling installations; cooling apparatus and equipment, namely, air cooling apparatus, oil cooling apparatus, and water cooling apparatus; cooling evaporators; cooling installations for water; cooling installations for liquids, namely, cooling installations for oil and cooling installations for water; heat exchangers for chemical processing; heat exchangers not being parts of machine for transfer of heat between fluid flows; shell heat exchangers not being parts of machines; fans for heat exchangers not being parts of machines; air conditioning installations and climate control systems for heating, ventilation and air-conditioning; all of the aforesaid goods for use in renewable energy and industrial applications ]SECTION 71 - CANCELLED—
037[ Installation, repair and maintenance of cooling components, cooling systems and cooling modules for renewable energy and industrial applications; advice and consultancy services in connection with the aforementioned services ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 14, 2026NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Apr 14, 2026C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Apr 14, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 15, 2025ES75TEAS SECTION 71 & 15 RECEIVED—
Jan 28, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 29, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 9, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 9, 2020FIMPFINAL DISPOSITION PROCESSED—
Apr 28, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 28, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 12, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 12, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 8, 2019GPNXNOTIFICATION PROCESSED BY IB—
Oct 23, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 23, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 23, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 10, 2019ALIEASSIGNED TO LIE—
Oct 4, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 13, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 13, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 13, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 22, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Apr 6, 2019RFNTREFUSAL PROCESSED BY IB—
Mar 15, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 15, 2019RFRRREFUSAL PROCESSED BY MPU—
Mar 5, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 5, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 4, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 27, 2019DOCKASSIGNED TO EXAMINER—
Feb 27, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 21, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance