Drawing for FBR

USPTO serial 79254063

FBR

Reviewed by CopyMark Law Group

Reg. 6187116Status 700Renewal
Filing date
Status date
Registration date
Nov 3, 2020
Examiner
SHOSHO II, ERNEST
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with FBR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $3,191*

Plus Government fees of $2,925

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Danielle I Mattessich

Danielle I Mattessich Merchant & Gould P.C.P.O. Box 2910Minneapolis, MN 55402United States

Goods and services

ClassDescriptionStatusFirst use
001Adhesives for industrial purposes, namely, adhesives for use in industry, adhesives for use in the building construction industry; adhesives for mortar, namely, adhesives for cement manufactured products; adhesives for use in the construction industry; adhesive compositions for use in industry, namely, chemicals for use in the manufacture of adhesivesACTIVE—
006Common metals and their alloys unwrought or semi-wrought; metal scaffolding; metal building materials, namely, fascia, cladding, lintels, ties, anchor plates for brick walls, metal door frames, metal window frames, metal lintels, metal building framework, metal roofing framework, metal roofing trusses, reinforcing materials of metal for use in poured concrete, and metal ties for use in building construction; metal hardware for buildings, namely, nuts, bolts, screws and washersACTIVE—
007Industrial robots; mechanical control apparatus for robots, namely, robotic arms, actuators for robotic arms, and robotic end effectors in the nature of grippers, clamps, vacuum suction pads, buckets, and blades; robots for industrial use; robots for use in industry including robots for operation in outdoor environments; cranes; lifting and hoisting apparatus, namely, self-propelled cranes, power-operated hoists and lifts in the nature of machines for moving bricks, blocks and bulk materials; machines, namely, conveyor machines and lifting installations for the transport of goods, machines for conveying solids, conveyors being machines, electric machines for mixing and applying mortar and adhesive, machines for laying bricks in the nature of industrial construction robots, machines for constructing buildings and walls of brick and block construction in the nature of industrial construction robots; machines in the nature of programmable robotic machines for brick laying, wall building, and construction using bricks and blocks; electric motors for machines, namely, motors for industrial robotic machines, motors for hoists and power-operated lifts for moving objects, items and bulk materials; electric motors for machines, namely, motors for concrete mixers and pneumatic pumps; engines for use in powering stationary land installations, namely, engines for industrial robotic machines, engines for hoists and power-operated lifts for moving objects, items and bulk materials; engines for construction vehicles, namely, engines for concrete mixers and pneumatic pumps; actuators for mechanisms, namely, actuators for operating robotic end effectors, namely, linear actuators, electric linear actuators, hydraulic linear actuators, pneumatic linear actuators, rotary actuators, electric rotary actuators, hydraulic rotary actuators, pneumatic rotary actuatorsACTIVE—
009Surveying machines and instruments; surveying apparatus, namely, total stations, automated total stations, lasers for surveying, laser trackers, metrology instruments; cameras; computer software, namely, digital image processing software and image analysis software for use with computerised vision systems; computer software for controlling robotics employed in the construction of engineering works, constructions, structures and buildings; computer software for planning, designing and modelling engineering works and constructions; computer software for providing a bill of materials for construction of engineering works, constructions, structures, and buildings; computer software for controlling the assembly of engineering works, constructions, structures and buildings; computer software for architectural modelling of engineering works, constructions, structures and buildings; digital power controllers; electronic controllers for robotic systems; security alarm systems other than for vehicles, namely, security and supervision apparatus and instruments for monitoring engineering work sites and construction sites in the nature of cameras; security alarm systems other than for vehicles, namely, security and surveillance equipment for monitoring work sites, engineering works and construction sites, and detecting unauthorised intrusion and issuing alarm indication or a machine safety stop in the nature of cameras or range of proximity sensors and alarm monitoring systems; security systems other than for vehicles, namely, alarm monitoring systems, unauthorised intrusion detection apparatus in the nature of burglar alarms; data processing apparatus; apparatus for interconnecting data processing equipment, namely, couplers in the nature of data processing equipment, interfaces for computers and computers; video surveillance cameras; distance measuring apparatus; apparatus for sensing movement, namely, electronic controllers for robotic systemsACTIVE—
017Insulating material for roofing; materials for insulation other than building glass, namely, insulation materials for use in building construction, roof spaces, and insulated ductworkACTIVE—
019Building materials, not of metal, namely, panels, lintels, glass for panels and windows, non-metallic rigid pipes for building, bricks, concrete or clay blocks, cement slabs, cement for building, sand, cement aggregate, mortar for building, dry mortar mixes for use in brick laying, non-metal doors, non-metal windows, and window glass for buildingACTIVE—
035Business management of architectural services, business management of design services; business management of construction services; business management of robotic construction and assembly servicesACTIVE—
037Building and construction services; repair of machines; installation of machines; rental of apparatus for use in the construction of buildings; rental of building construction machineryACTIVE—
042Scientific and technological services, namely, design and development of computer hardware and software for use with industrial robotic construction and assembly equipment; computer software design; computer software development; design of computer hardware; architectural services; design services, namely, structural engineering services; design services, namely, mechanical engineering services; engineering services relating to computers; engineering services relating to computer programming; engineering services relating to architecture; engineering design; design of commercial, industrial and residential buildings for construction by industrial robotic machines; land surveying; Programming of computer software for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 3, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 29, 2025NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Aug 15, 2024ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Aug 12, 2024COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jul 30, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 26, 2023ES7RTEAS SECTION 7 REQUEST RECEIVED—
Mar 7, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 13, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 13, 2021FIMPFINAL DISPOSITION PROCESSED—
Feb 3, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 3, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 25, 2020FIXDELECTRONIC RECORD REVIEW COMPLETE—
Sep 4, 2020OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 4, 2020ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Aug 19, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 19, 2020OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jul 31, 2020GPNXNOTIFICATION PROCESSED BY IB—
Jul 21, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 21, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 15, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 15, 2020OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 1, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 15, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 2020LIMELIMITATION FROM THE IB - REQUEST EXAM REVIEW—
Dec 13, 2019LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Sep 24, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 23, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 23, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 21, 2019CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 12, 2019RFNTREFUSAL PROCESSED BY IB—
Mar 28, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 28, 2019RFRRREFUSAL PROCESSED BY MPU—
Mar 19, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 18, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 17, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 15, 2019DOCKASSIGNED TO EXAMINER—
Mar 15, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 14, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance