Drawing for FONROCHE

USPTO serial 79256254

FONROCHE

Reviewed by CopyMark Law Group

Reg. 6177064Status 700Renewal
Filing date
Status date
Registration date
Oct 20, 2020
Examiner
LAM, HAI-LY HUYNH
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with FONROCHE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $1,700

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeannine Rittenhouse

Jeannine Rittenhouse IpHorgan Ltd.195 Arlington Heights Rd, Suite #125Buffalo Grove, IL 60089-1768United States

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, storing, regulating or controlling electric or solar current, namely, electricity conduits, solar cells; light switches; lighting control apparatus; electric or solar light dimmers; downloadable mobile application for use in electronic storage of data; downloadable computer software applications for mobile phones, namely, software for monitoring and remotely controlling of autonomous candelabra; apparatus and instruments for the exchange, storage, transmission and collection of data in the field of energy, the environment and sustainable development, namely, computers, data processing equipment; apparatus and instruments for conducting, switching, transforming, storing, regulating or controlling current, namely, current transformers and current rectifiers; photovoltaic cells and modules; cameras; electronic surveillance apparatus, namely, electronic video surveillance installations; alarm monitoring systems; access control and alarm monitoring systems; wireless controllers for the remote monitoring and control of the operation and condition of other electrical, electronic and mechanical systems or devicesACTIVE—
011Lighting apparatus, namely, electric candelabras, solar powered candelabras, photovoltaic powered candelabras, solar street lamps, photovoltaic street lamps; installations for the treatment of waste, in particular for transformation into energy via methanization and for production of energy and biogas, namely, bioreactor for use in the treatment of waste, waste processing machines using heat and chemical breakdown processes; installations for the purification of gasACTIVE—
037Installation and maintenance of apparatus for lighting; installation, maintenance and repair of methanization plants; providing information with respect to the repair or maintenance of apparatus for lighting; repair of machines and plants producing biogas; installation, repair and maintenance of installations for the treatment of waste and the production of energy; installation, repair and maintenance of installations for the purification and storage of gas and biogas; installation, repair and maintenance of installations for the distribution of energy in the form of gas and biogas; installation, repair and maintenance of apparatus for anaerobic digestion and fermentation; installation, repair and maintenance of installations for the recycling of waste; construction of methanization factories, structures for the production of natural gas, and structures for the production of biogas; building construction supervision; demolition of buildings; construction, installation, servicing, repair, maintenance, remediation being cleaning, disinfection, dismantling and renovation of geothermal power plants and biomass power plants; construction, maintenance and repair of installations for the provision and/or storage and/or production and/or distribution of energy especially from renewable sources, namely, wave energy power plants; building inspection in the course of building construction, inspection services in the course of building construction; installation and maintenance services for fire alarm, detection and suppression systems, especially in buildings and installations for providing and/or producing and/or distributing energy; construction, maintenance and repair of gas transportation pipelines in the field of renewable energy; information on maintenance and repair of apparatus and installations in the field of renewable energy, sustainable development, environmental protection, natural resource preservation and efforts to combat climate change, namely, methanization factories; construction consultancy; advice in constructing power plants, wind energy facilities for the producing, distribution and storage of energy, geothermal power plants and biomass power plants; servicing, maintenance and repair of apparatus for producing, provision, storage and distribution of energy; maintenance of installations for technical management of buildings, namely, building access control and alarm monitoring systems; installation, repair, maintenance, and servicing of installations and equipment for the production, storage and distribution of renewable energyACTIVE—
042Lighting system design; research in the field of renewable energy; technical studies being technical research and design of installations for waste treatment and production of energy and production of biogas; engineering and scientific research consulting relating to waste treatment and production of energy and biogas; development, rental, maintenance and updating of software used for controlling installations for waste treatment and energy production; research and development of new products for others in the field of environment and energy as well as biogas; research and development of new products for others in the field of electrical engineering, production, and storage and of new products for others relating to distribution of energy, geothermal energy, energy obtained from biomass, and renewable energies; design and development of computer systems and telecommunication apparatus and equipment all in the field of renewable energy; elaboration being design and hosting for others of online databases in the field of renewable energiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 20, 2026ES75TEAS SECTION 71 & 15 RECEIVED—
Oct 20, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 9, 2024ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 10, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 20, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 3, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 3, 2021FIMPFINAL DISPOSITION PROCESSED—
Jan 20, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 20, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 3, 2020OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 16, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 16, 2020OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 4, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 4, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 31, 2020GPNXNOTIFICATION PROCESSED BY IB—
Jul 15, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 15, 2020OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 15, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 1, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 11, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Jun 11, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 11, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 11, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 5, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 5, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 5, 2020ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 6, 2019GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Dec 6, 2019GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 6, 2019CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 18, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 18, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 18, 2019ALIEASSIGNED TO LIE—
Nov 12, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 1, 2019RFNTREFUSAL PROCESSED BY IB—
May 11, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 11, 2019RFRRREFUSAL PROCESSED BY MPU—
Apr 19, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 18, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 16, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 12, 2019DOCKASSIGNED TO EXAMINER—
Apr 12, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 11, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance