Drawing for BUZON

USPTO serial 79256919

BUZON

Reviewed by CopyMark Law Group

Reg. 5964112Status 707Registered
Filing date
Status date
Registration date
Jan 21, 2020
Examiner
MAHMOUDI, MARIAM AZIZ
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with BUZON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Martin W. Schiffmiller

Martin W. Schiffmiller Kirschstein Israel Schiffmiller & Pieroni, P.C.66 Palmer Avenue, Suite 49BBronxville, NY 10708United States

Goods and services

ClassDescriptionStatusFirst use
019Non-metallic building materials, namely, plastic pedestals for elevating pavers and deck materials; non-metallic rigid pipes for building; transportable buildings not of metal; carriers in the form of non-metallic structures for elevated decks, roofdecks, terraces, fountains, temporary floors, swimming pool decks and metal gratings; monuments not of metal; slab and floor supports, not of metal, namely, concrete and wood blocksACTIVE—
037[ Construction of commercial, residential and public buildings; construction of transportable buildings, elevated decks, roof decks, terraces, balconies, plazas and gardens, pedestrian pathways and walkways, fountains, temporary floors, swimming pool decks and monuments; construction consultancy; building construction information; building construction supervision; installation of building materials, namely, installation of pedestals for pavers and deck materials, pipes for buildings, transportable buildings, structures for elevated decks, roof decks, terraces, balconies, plazas and gardens, pedestrian pathways and walkways, fountains, temporary floors, swimming pool decks, metal gratings, monuments and slab and floor supports; installation of bases being scaffolds for building construction; building construction site preparation, namely, site clearing; work repair services, namely, repair on buildings; repair and maintenance of earth moving equipment ]SECTION 71 - CANCELLED—
042Technical research with respect to building construction; technical project studies with respect to construction, namely, conducting scientific feasibility studies; research and development of new products for others with respect to construction; analysis and evaluation of product design with respect to building construction products; behavioral analysis of the structure of construction materials; testing of building materials; industrial design with respect to construction; construction drafting; construction work planning, namely, drafting of building construction plans; architectural design servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 5, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 5, 202671.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 4, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 26, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 30, 2025ES71TEAS SECTION 71 RECEIVED—
Nov 30, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 28, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 21, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 22, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 6, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 6, 2020FIMPFINAL DISPOSITION PROCESSED—
Apr 21, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 21, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 5, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 5, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 1, 2019GPNXNOTIFICATION PROCESSED BY IB—
Oct 16, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 16, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 16, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 1, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 19, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 19, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 19, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 22, 2019RFNTREFUSAL PROCESSED BY IB—
Jun 6, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 6, 2019RFRRREFUSAL PROCESSED BY MPU—
May 18, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 17, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 16, 2019DOCKASSIGNED TO EXAMINER—
Apr 30, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 24, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 18, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance