USPTO serial 79256922
ENERGY 30
Reviewed by CopyMark Law Group
Reg. 5946925Status 709
- Filing date
- Status date
- Registration date
- Dec 31, 2019
- Examiner
- MARTIN, JENNIFER MCGARRY
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ENERGY 30?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Data processing apparatus; apparatus and instruments for monitoring, measuring and counting, with communication interfaces and the possibility to record, monitor and evaluate consumption data, namely, gas flow monitors, gas sensors for measuring gas concentration, oil flow monitors; apparatus and instruments for switching, transforming, accumulating, regulating or controlling electric current, namely, electric current switches, electric transformers, electric accumulators, voltage regulators for electric power, electrical controllers; apparatus and instruments for switching, transforming, accumulating, regulating or controlling gas, namely, gas sensors for measuring gas concentration, gas meters; apparatus and instruments for switching, transforming, accumulating, regulating or controlling water, namely, water meters; gas meters; electricity meters; water meters; electrical communication meters; recorded computer software for database management, operating sensors and industrial monitoring equipment in the field of gas, electricity, water metering and the control of energy consumption as well as computer interfaces related thereto; information processing apparatus, namely, computers, tablet computers, central processing units for processing information, data, sound or images; power metering apparatus, namely, electric meters; materials testing apparatus for testing the strength of materials used in energy transport and distribution networks; downloadable software for design, management, maintenance, simulation and testing of energy transport and distribution networks; dedicated calculators for simulation and tests of energy transport and distribution networks; apparatus for monitoring the division of energy consumption, namely, energy meters for tracking and monitoring energy usage | SECTION 71 - CANCELLED | — |
| 037 | Maintenance, installation, servicing, troubleshooting, repair of electrical and technological equipment, namely, telecommunication network hardware, electrical hardware systems; remote or on-site maintenance of computer hardware, oil and gas transmission equipment, telecommunications equipment; installation, commissioning and servicing of communication, computer and data networking hardware; installation, maintenance and repair of computer hardware and computer equipment; installation, maintenance and repair of information processing computer hardware equipment and computer hardware as well as their peripherals; installation and maintenance of security systems; installation and maintenance of intelligent security systems for buildings and individual houses; installation, programming and servicing of home automation computer hardware systems for buildings and individual houses | SECTION 71 - CANCELLED | — |
| 039 | Distribution of energy; water distribution; electricity distribution; distribution of gas; distribution and transportation of liquefied petroleum gas; packaging, transport, storage of energy meters; physical storage of electronically-stored data or documents | SECTION 71 - CANCELLED | — |
| 040 | Production of energy and production of electricity, gas, heating, steam and water; professional consulting in energy generation and production of electricity, gas, heating, steam and water | SECTION 71 - CANCELLED | — |
| 042 | Technical project studies in the field of solar, photovoltaic and thermal energy; technical advice in the field of energy-saving; engineering services in the field of energy efficiency; engineering services in the field of energy efficiency for evaluating and optimizing the energy performance of apparatus and buildings; professional consultancy in the field of renewable energies, solar energy provided by engineers; advice and technical information, namely, consulting services in the fields of energy measurement to improve energy efficiency | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Solutions 30 SE
- Other trademarks owned by BRAND 30
- Other trademarks owned by BRAND 30
- Other trademarks owned by BRAND 30
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named ENERGY 30
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 17, 2026 | C71T | CANCELLED SECTION 71 | — |
| Dec 31, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 9, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 18, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| May 1, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 10, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 9, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 31, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 31, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 15, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 15, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 12, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 25, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 25, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 25, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 12, 2019 | ALIE | ASSIGNED TO LIE | — |
| Sep 11, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 10, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 10, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 10, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 14, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 25, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 25, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 2, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 1, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 30, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 24, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 24, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 18, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |