Drawing for SUMI-TRACKER

USPTO serial 79257999

SUMI-TRACKER

Reviewed by CopyMark Law Group

Reg. 6039222Status 709
Filing date
Status date
Registration date
Apr 28, 2020
Examiner
AWRICH, ELLEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SUMI-TRACKER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Boris Umansky

Boris Umansky Ladas & Parry LLP224 South Michigan Avenue, Ste. 1600Chicago, IL 60604UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Reinforcing building materials of metal for installation of photovoltaic apparatus and installations for generating solar electricity; reinforcing building materials of metal for installation of photovoltaic apparatus and installations for generating solar electricity, namely, mounts for photovoltaic apparatus and installations for generating solar electricity and mounts for photovoltaic installations for generating electricity; small items of metal hardware for installation of photovoltaic apparatus and installations for generating solar electricity, namely, bolts, nuts, threaded fasteners, washers, spacing brackets, screws, and rivets; roofing of metal for installation of photovoltaic apparatus and installations for generating solar electricity; reinforcing building materials of metal for installation of the whole of photovoltaic apparatus and installations for generating solar electricity; reinforcing building materials of metal for installation of solar panels for the production of electricity; small items of metal hardware for installation of solar panels for the production of electricity, namely, bolts, nuts, threaded fasteners, washers, spacing brackets, screws, and rivets; roofing of metal for installation of solar panels for the production of electricity; reinforcing building materials of metal for installation of the whole of solar panels for the production of electricity; reinforcing building materials of metal for installation of solar cells; roofing of metal for installation of solar cells; metal materials for building and construction, namely, roofing of metal; prefabricated building assembly kits of metal; small items of metal hardware, namely, bolts, nuts, threaded fasteners, washers, spacing brackets, screws and rivets; metal joinery fittings; solar panel mounts made of metal; solar panel mounts made of metal, namely, mounts for solar panels for the production of electricity, mounts for solar modules, and mounts for solar panels for the production of electricity loaded with automatic solar tracking sensors; roofing of metal, incorporating solar cells; substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectors for building purposesSECTION 71 - CANCELLED—
009Photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic units for the production of electrical power comprised of photovoltaic solar modules, inverters, electric junction boxes, power cables, and mounts for photovoltaic solar modules;photovoltaic installations for generating electricity, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; solar panels for the production of electricity; solar cells; photovoltaic solar modules; photovoltaic cells; photovoltaic modules; automatic solar tracking sensors; power distribution or control machines and apparatus, namely, electrical power distribution units; testing and measuring equipment for use in testing the performance and efficiency of power plant equipment; electrical cells and batteries; electricity meters; magnetometers; computer software for measuring power generation performance of solar panels, downloadable or recorded; computers; computer software for design of photovoltaic power generation systems, downloadable or recorded; computer software for simulation of photovoltaic power generation systems, downloadable or recorded; computer software for monitoring and controlling photovoltaic power generation systems, downloadable or recorded; electric cables and wires; magnetic cores; resistance wires; electrodesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 13, 2026C71TCANCELLED SECTION 71—
Apr 28, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 26, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 6, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 31, 2020FIMPFINAL DISPOSITION PROCESSED—
Jul 28, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 28, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 11, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 11, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 7, 2020GPNXNOTIFICATION PROCESSED BY IB—
Jan 22, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 22, 2020OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 22, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 6, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 26, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 26, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 26, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 19, 2019RFNPREFUSAL PROCESSED BY IB—
Jun 29, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 29, 2019RFRRREFUSAL PROCESSED BY MPU—
Jun 13, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 12, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 7, 2019RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
May 21, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
May 16, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 15, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2019DOCKASSIGNED TO EXAMINER—
May 15, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 14, 2019LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
May 2, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance