Drawing for LINDNER

USPTO serial 79258095

LINDNER

Reviewed by CopyMark Law Group

Reg. 6077069Status 706Renewal
Filing date
Status date
Registration date
Jun 16, 2020
Examiner
TRUSILO, KELLY JEAN
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with LINDNER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $2,144*

Plus Government fees of $2,550

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

B. Anna McCoy

B. Anna McCoy McCoy Russell LLP1410 NW Johnson StreetSuite 201Portland, OR 97209

Goods and services

ClassDescriptionStatusFirst use
006Building materials of metal, namely, metal ceilings, panel ceilings, air-conditioning ceilings, heating and cooling ceilings, ceiling panels of metal, fire-retardant ceilings, luminous ceilings, facades of metal, metal partitions, moveable wall panels of metal, floorboards of metal, floor boards of metal for false floors and cavity floor systems, metal doors and false floors and cavity floor systems, fittings for buildings, namely, metal window fittings; fire-retardant metallic building materials, namely, metallic compound metal reinforcement and canopies which include metallic films or fibers, and metallic compound materials including metallic oxides as fire retardants; transportable buildings of metal, work cabins in the nature of transportable buildings of metal; ceiling canopies of metallic materials; wall panels of metal; roofs of metal, roofs of metal with integrated solar panelsACTIVE—
011Lighting fixtures, lighting installations, [ namely, electric LED luminaires, built-in lights, namely, wall lights, ceiling lights, specular louvre, namely, electric led luminaires, prism lighting installations, standard lamps, LED lighting installations for canopies; ] * and luminaires, namely, integrated built-in luminaires and light sails, * under floor heating apparatusACTIVE—
017Soundproofing materialsACTIVE—
019Building materials of wood and plastic, namely, panel ceilings, air-conditioning ceilings, heating and cooling ceilings, ceiling panels of wood, fire-retardant ceilings, luminous ceilings, partitions, not of metal, glass partitions; facades not of metal, moveable wall panels, not of metal;, floorboards, not of metal, non-metallic floor boards for false floors and cavity floor systems, non-metallic doors and door frames and fittings, fittings for buildings, namely, ceiling or roof panel fittings, door fittings, window fittings, wall fittings; fire-retardant non-metallic building materials, namely, cement posts, wall panels, fiberglass panels which include fire-retardant non-metallic materials, plastic compounds, chemical compounds or mineral compounds; ceiling canopies of non-metallic materials, ceiling canopies of wooden materials, wall panels, not of metal, for building, transportable buildings, not of metal, work cabins in the nature of non-metallic transportable buildings; dry screed; roofs, not of metal, roofs, not of metal with integrated solar panels; glass roofs; flush and frameless glazing, not of metal, in the nature of glass doorsACTIVE—
020Furniture, such as for hotels and restaurants; wall units, partitions of wood and glass for furnitureACTIVE—
037Construction of building interiors, installation of building insulation for combating heat and cold, cold room and cold store construction, construction of clean rooms installations in the nature of clean room walls, ceilings or floors; asbestos removal; ship conversion in the nature of marine construction; dry construction, namely, construction of interiors of buildings, walls, ceilings or floors of buildings; maintenance work for the aforementioned services; in particular building maintenance of door installations, building facades, movable facade parts, ceilings, walls and floors of buildings and ships, movable facade parts and ceilings, mobile wallsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 21, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 21, 202671AGREGISTERED-SEC.71 ACCEPTED—
Sep 7, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 12, 2026ES71TEAS SECTION 71 RECEIVED—
Jun 16, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 8, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Dec 8, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 8, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Dec 8, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 8, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 8, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 5, 2022INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Mar 12, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 12, 2021LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jul 12, 2021COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jul 12, 2021PLGLASSIGNED TO PARALEGAL—
Jun 19, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Nov 28, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 6, 2020XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Oct 6, 2020XXCRGENERIC MADRID TRANSACTION CREATED—
Sep 16, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 16, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 31, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 31, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 11, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 26, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 26, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Feb 26, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 26, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 26, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 27, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 25, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 25, 2020ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 27, 2019GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Dec 27, 2019GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 27, 2019CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 20, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 20, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 19, 2019ALIEASSIGNED TO LIE—
Dec 6, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 6, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 6, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 22, 2019RFNTREFUSAL PROCESSED BY IB—
Jun 6, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 5, 2019RFRRREFUSAL PROCESSED BY MPU—
May 22, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 21, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
May 10, 2019DOCKASSIGNED TO EXAMINER—
May 10, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 9, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance