USPTO serial 79259718
POWER ROAD BY EUROVIA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 20, 2020
- Examiner
- JACKSON, SHA-KARA ELOUISE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with POWER ROAD BY EUROVIA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $1,275
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Dianne M. Smith-Misemer
Dianne M. Smith-Misemer HOVEY WILLIAMS LLP10801 Mastin Boulevard, Suite 1000Overland Park, KS 66210UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Non-metallic building materials and products in the nature of bitumen and asphalt for the construction, coating, maintenance and renovation of roads, roads, works of art, platforms, sidewalks and all types of road surfaces, namely, geothermal energy capture, diffusion, exchange and transport of calories; asphalt, pitch, bitumen and emulsions of bitumen, gravel, sand, artificial and natural stone, cement aggregates, slag stone, macadam; bituminous building products and coatings for soils and road pavements, namely, bituminous coatings for roofing, bituminous binders for road construction and maintenance; bituminous coated materials; paving blocks and slabs, not of metal; all the above mentioned goods incorporating geothermal technologies | ACTIVE | — |
| 037 | Construction, maintenance and repair of roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, sidewalks and any road surface; information regarding construction of roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, sidewalks and any road surface; supervision of construction work for roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, car parks, sidewalks and any road surface; asphalting; all the above mentioned services incorporating geothermal technologies | ACTIVE | — |
| 042 | Design of roads, traffic lanes, civil engineering structures, bridges, platforms, sidewalks, parking lots and any type of road surface namely, geothermal devices for capture, distribution, exchange and transport of calories; quality evaluations and assessments in the fields of science and technology provided by engineers; scientific and technical research; research and development of new products for others; construction drafting services; environmental protection-related research; quality control for others; all of the above services incorporating geothermal technologies applicable to the field of construction and maintenance of roads, traffic lanes, civil engineering structures, bridges, platforms, sidewalks, parking lots and any type of road surface | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by EUROVIA
- Other trademarks owned by EUROVIA
- Other trademarks owned by EUROVIA
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named POWER ROAD BY EUROVIA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 20, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Feb 28, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 5, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 5, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 20, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 20, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 4, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 4, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 31, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 15, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 15, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 15, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 30, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 24, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 24, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 24, 2020 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Feb 3, 2020 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Feb 3, 2020 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 3, 2020 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 13, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 13, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 10, 2020 | ALIE | ASSIGNED TO LIE | — |
| Dec 18, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 19, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 28, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 27, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 11, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 10, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 5, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 3, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 1, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 30, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |