USPTO serial 79259740
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,275
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
David A Lowe
David A Lowe Lowe Graham Jones PLLC1325 Fourth Avenue, Suite 1130Seattle, WA 98101UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and machine tools for treatment of materials and for manufacturing, in particular stone manufacturing installations, concrete block manufacturing installations, kerbstone manufacturing installations, sand lime brick manufacturing installations, sand lime brick presses, porous concrete block manufacturing installations, aerated concrete block manufacturing installations, stone slab manufacturing installations; Installations for the manufacture of fitting pieces; Concrete slab manufacturing installations; Mixing installations, in particular for the manufacture of stone; Metering installations, in particular for the manufacture of stone and the manufacture of concrete, sand lime brick and porous concrete products; Wet presses for the manufacture of stone; Wet-casting installations for the manufacture of stone; Lifting installations for the manufacture of stone; Packaging installations, in particular for the manufacture of stone and the manufacture of concrete, sand lime brick and porous concrete products; Packaging installations, in particular for the manufacture of stone and the manufacture of concrete, sand lime brick and porous concrete products; Elevator and lowerator installations, in particular for the manufacture of stone; Centering systems, in particular for the manufacture of stone, comprising lifting masts, energy chains, upper frames, frames, clamping baskets, terminal boxes; Doubling device for layering of stones; Sliding platform installations for the manufacture of stone; Reshaping installations for the manufacture of stone; Drying installations being part of stone manufacturing installations; Splitter installations for the manufacture of stone; Surface grinding machines, in particular for the manufacture of stone; Blast installations, in particular for the manufacture of stone; Palette storage installations, in particular for the manufacture of stone; Palette gripper installations, in particular for the manufacture of stone; Strapping installations for the manufacture of stone; Film winder installations, in particular for the manufacture of stone; Turntable presses for the manufacture of stone; Kerbstone presses for the manufacture of stone; Slab presses for the manufacture of stone; Sawing installations, in particular for the manufacture of stone; Stone grapple installations for the manufacture of stone; Hydraulic sand lime brick presses; Element presses for the manufacture of stone; Hermetic presses; Hauling units for the manufacture of stone; Backing concrete feeder installations for the manufacture of stone; Leaching installations for the manufacture of stone; Sand mills, in particular for the manufacture of stone; Stone sawing installations; Green separating table installations for the manufacture of stone; Bottom layer removal installations for the manufacture of stone; Super-smoothing installations for the manufacture of stone; Setting machines for the manufacture of stone; Stone manufacturing reactors; Twin-shaft mixers for the manufacture of stone; Stone conveyor belts for the manufacture of stone; Belts for the transport of concrete; Table removal installations for the manufacture of stone; Car feeder installations, in particular for the manufacture of stone; Crushing installations, in particular for the manufacture of stone; Apron conveyor installations for the manufacture of stone; Main saw installations, in particular for the manufacture of stone; Resaw installations, in particular for the manufacture of stone; Vacuum installations, in particular for the manufacture of stone; Ball mill installations, in particular for the manufacture of stone; Profiling installations for the manufacture of stone; Side cutter installations, in particular for the manufacture of stone; Longitudinal and transverse saw installations, in particular for the manufacture of stone; High-frequency cutting frames being parts of machines, in particular for the manufacture of stone; Oscillating cutting wires being parts of machines, in particular for the manufacture of stone; Separating machines, in particular for the manufacture of stone; Green cake separating machines for the manufacture of stone; Shallow hardening machines for the manufacture of stone; Machines for manufacturing grip pockets for the manufacture of stone; Machines for working stone surfaces; Machines for the surface finishing of stone; Steam chamber autoclave curing device for the production of stones being part of stone production machine; Concrete block hardening installations; Hose dosing installations for the manufacture of stone; Dividing plate dosing installations for the manufacture of stone; Lift and carry conveyors, belt conveyors and transport installations for the transport of stone, artificial stone, concrete, sand lime brick and porous concrete products; Colour metering installations for the manufacture of concrete products and the manufacture of stone; Colour metering belts for the manufacture of concrete products and the manufacture of stone; Device for introducing and discharging production supports in the production circle of a stone producing machine; Board package grippers for the manufacture of stone and the manufacture of concrete, sand lime brick and porous concrete products; Bucket conveyors for the transport of concrete; Conveyors being machines; All the aforesaid goods being machines or parts and components of machines | ACTIVE | — |
| 009 | Density measuring installations, in particular for the manufacture of stone; Installations for measuring the height of stone; Charging scales for the manufacture of stone and the manufacture of concrete products; Weighing feeder belts for the manufacture of stone and the manufacture of concrete products | ACTIVE | — |
| 012 | Forklift trucks, namely, finger cars, in particular for the manufacture of stone | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 2, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 30, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 29, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 1, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 1, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 1, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 17, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 25, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 25, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 2, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 2, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 17, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 17, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 13, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 26, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 26, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 26, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 11, 2020 | ALIE | ASSIGNED TO LIE | — |
| Feb 7, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 21, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 21, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 21, 2020 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 4, 2019 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 4, 2019 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 4, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 27, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 27, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 27, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 13, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 24, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 24, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 7, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 5, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 4, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 3, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 3, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 30, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |