Drawing for RBM

USPTO serial 79261702

RBM

Reviewed by CopyMark Law Group

Reg. 6104087Status 700Renewal
Filing date
Status date
Registration date
Jul 21, 2020
Examiner
BARAHONA, BYRON
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RBM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $2,144*

Plus Government fees of $2,550

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Courtney Thompson

Courtney Thompson Fredrikson & Byron, P.A.60 South Sixth Street, Suite 1500Minneapolis, MN 55402United States

Goods and services

ClassDescriptionStatusFirst use
006Collars of metal for fastening pipes; manifolds of metal for pipelines; ducts of metal for ventilating installations; ducts of metal for air conditioning installations; metal pipes for heating; metal expansion joints for floors and walls; metal expansion joints for pipes and channels; elbows of metal for pipes; junctions of metal, alloy steel and titanium for pipes; metal hose fittings; metal pipes and tubes; flexible tubes of metal; valves of metal, alloy steel and titanium, other than parts of machines; water pipe valves of metal; nuts of metal; screws of metal; metal boxes for containment and inspectionACTIVE—
007Mechanical seals; pressure reducers as parts of machines; control valves for regulating the flow of gases and liquids, being parts of a machine; pumps control valves; valves as machine components; pressure valves as parts of machines; valves for pumpsACTIVE—
009Calorimeters; switchboxes; electrical cables; temperature indicators, level indicators; pressure indicators; electronic indicator boards; electric control panels; pressure gauges; thermostats; digital thermostats for climate control; downloadable software for the accounting of energy consumption, in particular of heat, water, gas and electricity consumption; thermostat controllers, namely, climate control systems consisting of digital thermostats and drying control devices; valve operators, namely automatic valvesACTIVE—
011Regulating accessories for water or gas apparatus and pipes; safety accessories for water or gas apparatus and gas meters, namely reverse flow check valves; air conditioning installations; heating installations; air conditioning installations and apparatus; water distribution installations, namely faucets; taps for pipes and pipelines being parts of sanitary installations; heating armature in the nature of heating elements; water filters; air filters for air conditioning units; air filters for industrial use; automatic temperature regulators; waste pipes for sanitary installations; flexible hoses in the nature of refrigerany hoses as parts of plumbing installations for bathrooms; boiler pipes in the nature of tubes for heating installations; air conditioning units; air purification units; heating and gas installations, namely, dispensing valves parts; thermostatic valves as parts of heating installations; thermostatic valves for radiators; thermostatic valves as parts of heating installations for heating bodies; valves for plumbing and heating installations; air vent valves being valves for air conditioners; fans for air conditioning apparatus; heat pumps; heat exchangers, not being parts of machines; dehumidifiers; components for radiant heating installations, namely metal heat transfer plates; Heating systems for residential and commercial buildings comprised of boilers, valves, pipes, manifolds, control panel switches, and electrical wire, all sold as a unitACTIVE—
017Water-tight rings for plumbing pipes; non-metallic pipe couplings; non-metal coupling for hoses; non-metal elbows for pipes; pipe muffs, not of metal; thermal insulation materials for pipes; fittings, not of metal, for flexible pipes; fittings, not of metal, for rigid pipes; flexible hoses, not of metal; multilayer flexible hoses, not of metal; valves of rubberACTIVE—
020Water pipe valves of plastic, clips, not of metal, for cables and pipes; plastic boxes for containment and inspectionACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 4, 2026ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 7, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 7, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Nov 7, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 7, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 7, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 7, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 21, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 7, 2022CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Nov 3, 2022CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Aug 21, 2022CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Aug 15, 2022CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 9, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 29, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 28, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 11, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 11, 2020FIMPFINAL DISPOSITION PROCESSED—
Oct 21, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 21, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 5, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 5, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 15, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 2, 2020ALIEASSIGNED TO LIE—
Mar 25, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 24, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Mar 24, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 24, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 24, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 23, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 23, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 23, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 19, 2019RFNTREFUSAL PROCESSED BY IB—
Sep 27, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 27, 2019RFRRREFUSAL PROCESSED BY MPU—
Sep 18, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 17, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 30, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 24, 2019DOCKASSIGNED TO EXAMINER—
Jul 24, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 27, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance