USPTO serial 79263548
EZ8
Reviewed by CopyMark Law Group
Reg. 6115457Status 707Renewal
- Filing date
- Status date
- Registration date
- Aug 4, 2020
- Examiner
- PORTARO, ALEXANDRA J
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with EZ8?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*
Plus Government fees of $425
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
CEGASA PORTABLE ENERGY, S.L.U.
ES
ES
ES
ES
Vitoria-Gasteiz (Álava), ES
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Justin R. Young
Justin R. Young DTL Ltd.134 N. LaSalle St.Suite 1050CHICAGO, IL 60602Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | [ Chemical products for industrial purposes, chemical materials and chemical preparations for industrial purposes; manganese dioxide; manganese dioxide catalysts * ; none of the aforesaid goods for use in connection with any toy vehicles, model vehicles, electric or battery-powered toy vehicles, remote-controlled toy vehicles, or parts and accessories therefor * ] | SECTION 71 - CANCELLED | — |
| 009 | Apparatus and instruments for conducting electricity, namely, electric conductors; apparatus and instruments for switching electricity, namely, electric switches; apparatus and instruments for transforming electricity, namely, electric transformers; apparatus and instruments for accumulating electricity, namely, electric accumulators; apparatus and instruments for regulating electricity, namely, voltage regulators for electric power; apparatus and instruments for the control or distribution of electricity, namely, electrical controllers; batteries and dry cells; electric voltage testers; Electric current testers in the nature of electronic devices for measuring electronic current; devices for checking and monitoring energy, namely, battery monitors; electric power supplies; electrical adapters; electrical controllers; energy storage modules in the nature of photovoltaic modules; electric batteries and cells; battery chargers; electric cables, particularly connection and charging cables; electric connectors and their connection fittings; electric converters and power inverters; dry cells; Dry alkaline batteries; zinc-manganese dioxide alkaline batteries; [ lithium batteries and cells; ] industrial electric batteries; hydrogen cells; battery packs; solar batteries; Hydroelectric cells; fuel cells; rechargeable batteries; electric cells and batteries; battery cables; accumulator boxes; batteries for cars; Batteries for vehicles; rechargeable electric batteries; electric batteries for vehicles; high-voltage batteries; batteries for electric vehicles; auxiliary battery packs ; batteries rechargeable with solar energy; uninterruptible power supply apparatus; Battery charging devices for motor vehicles; [ secondary lithium batteries; lithium-ion batteries; ] battery and cell sets in the nature of batteries and dry cells * ; none of the aforesaid goods being or for use in connection with any toy vehicles, model vehicles, electric or battery-powered toy vehicles, remote-controlled toy vehicles, or parts and accessories therefor * | ACTIVE | — |
| 042 | [ Scientific and technological services, namely, scientific research; Design services, namely, design of batteries; scientific and industrial research services and analysis in the field of energy and electricity; technological engineering, namely, analysis and research, research and design services in the field of batteries and components thereof; laboratory analysis in the field of batteries and components thereof; research in the field of energy storage; consulting in the field of scientific research; consultancy in the field of energy storage research; research in the field of integrated energy concepts; research and development of industrial processes in the field of manufacturing batteries; research and development of new products for others; design and development of photovoltaic systems; scientific and technological services, namely, research and design in the field of energy storage, development of electricity sets; computer hardware and software design and development; energy auditing * ; none of the aforesaid services being in connection with any toy vehicles, model vehicles, electric or battery-powered toy vehicles, remote-controlled toy vehicles, or parts and accessories therefor * ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by CEGASA PORTABLE ENERGY, S.L.U.
- Other trademarks owned by INTRAWAY BUSINESS, S.L.U.
- Other trademarks owned by INTRAWAY BUSINESS, S.L.U.
- Other trademarks owned by INTRAWAY BUSINESS, S.L.U.
- Other trademarks owned by INTRAWAY BUSINESS, S.L.
- Other trademarks in Class 001
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named EZ8
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 22, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 22, 2026 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Sep 20, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 20, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 28, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 4, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jan 31, 2025 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 23, 2024 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Dec 19, 2023 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Dec 19, 2023 | CANT | CANCELLATION TERMINATED NO. 999999 | — |
| Dec 19, 2023 | A7OK | AMENDMENT UNDER SECTION 7 - PROCESSED | — |
| Dec 15, 2023 | CAND | CANCELLATION DENIED NO. 999999 | — |
| Jul 19, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 1, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 5, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 14, 2022 | PETC | CANCELLATION INSTITUTED NO. 999999 | — |
| Jan 8, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 12, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 20, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 20, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 4, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 4, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 29, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 19, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 19, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 13, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 13, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 29, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 13, 2020 | ALIE | ASSIGNED TO LIE | — |
| Apr 6, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 24, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 23, 2020 | FFDM | FILING RECEIPT CORRECTION ENTERED | — |
| Mar 17, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 16, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 16, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 13, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 13, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 23, 2020 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Oct 5, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 16, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 16, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 8, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 7, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 29, 2019 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Aug 8, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 7, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 6, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 31, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 31, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 29, 2019 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jul 25, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |