USPTO serial 79264682
GREENCHAIN
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 18, 2020
- Examiner
- MACFARLANE, JAMES W
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with GREENCHAIN?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $1,275
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Todd A. Sullivan
Todd A. Sullivan Hayes Soloway PC175 Canal StreetManchester, NH 03101UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Wind installations for producing electricity, namely, wind turbines; wind apparatus for electricity generation, namely, generators for wind turbines; energy generating installations, namely, electric generators | ACTIVE | — |
| 009 | Simulation apparatus, namely, flight simulators and driving simulators; simulation devices, namely, flight simulators and driving simulators; environmental test chambers, namely, temperature simulation equipment; simulation equipment, namely, flight simulators and driving simulators; simulators, namely, flight simulators and driving simulators; downloadable and recorded simulation software for simulating driving; downloadable and recorded simulation software for use on digital computers for simulating driving; apparatus for scientific and laboratory research, educational apparatus and simulators, namely, ionization apparatus for scientific use; downloadable and recorded software for system cleaning and optimization; data storage devices, namely, blank flash memory cards; downloadable and recorded data storage programs for simulating driving; sensors for detecting power surges, used for controlling power plants; power modules, namely, power supplies; downloadable software for optimization of computers for deploying parallel applications and performing parallel calculations; energy banks in the nature of rechargeable battery packs; energy control devices, namely, electrical controllers; accumulators for photovoltaic energy; apparatus for controlling electrical energy, namely, electrical controllers; electrical energy transmission apparatus, namely, electrical wires; electric batteries and solar batteries; geiger counters; electronic meters for measuring gas density; electric current meters; downloadable and recorded software for use in remote meter reading; computer hardware for remote meter reading; downloadable and recorded computer software for use in hand-held mobile digital electronic devices and other consumer electronic products for use in database management, use as a spreadsheet, and word processing; fuel consumption meters in the nature of fuel gauges; apparatus for monitoring wind power consumption, namely, electricity meters; downloadable software applications for use in database management, use as a spreadsheet, and word processing; downloadable computer applications for use in database management, use as a spreadsheet, and word processing; electrical energy analyzers in the nature of electricity meters; recorded and downloadable software for monitoring computer systems; apparatus and instruments for monitoring, namely, security cameras; devices for testing and quality control, namely, water testing instrumentation for monitoring and detecting contamination | ACTIVE | — |
| 042 | Electronic storage of images; development of data storage systems; design of storage systems; design and development of systems for renewable energy generation; computer software development, namely, creation of control programs for electric function control modules and activation modules; computer software development and testing relating to calculation methods and algorithms; design and development of wind and photovoltaic systems; engineering project studies, namely, engineering services; provision of scientific information regarding scientific research involving technical project studies relating to the use of natural renewable energy; advisory services in the fields of product development and software programming quality improvement; consultancy in the field of engineering services designed to promote energy saving and energy efficiency; technical advice in connection with energy-saving measures, namely, consulting services in the fields of energy measurement to improve energy efficiency; energy auditing; technological consulting services in the field of energy supply; product development of energy management systems; design and development of energy distribution network products; design and development of software for controlling, regulating and monitoring solar and wind energy systems; scientific research in the field of energy; scientific research involving technical project studies relating to the use of renewable natural energy; advisory services relating to energy consumption, namely, consulting services in the fields of energy measurement to improve energy efficiency; engineering services relating to production of solar and wind energy; certification, namely, quality control for others; troubleshooting in the nature of diagnosing problems of consumer electronic products; safety testing of consumer products; consulting services in the fields of energy measurement to improve energy efficiency involving recording data relating to energy consumption in buildings; design and development of consumer products; development of software applications; providing temporary use of online, non-downloadable computer software for tracking merchandise and production, distribution and consumption of energy via computer networks, intranets and the internet; provision of temporary use of online, non-downloadable computer software for tracking parcels and production, distribution and energy consumption on computer networks, intranet networks and the internet; development of energy and electricity management products; development of computer software for logistics, supply chain management and business portals relating to energy; product design of information systems relating to energy management; design and development of energy management software; product quality testing and quality control for others; product design of data storage systems; product design and development of systems for the input, output, processing, display and storage of data | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ACCIONA ENERGIA, S. A.
- Other trademarks owned by ACCIONA ENERGIA, S. A.
- Other trademarks owned by ACCIONA ENERGIA, S. A.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named GREENCHAIN
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 18, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 26, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 8, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 8, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 18, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 18, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 2, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 2, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 29, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 13, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 13, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 13, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 25, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 25, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 25, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 25, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 2, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 2, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 1, 2020 | ALIE | ASSIGNED TO LIE | — |
| Mar 25, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 26, 2019 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 7, 2019 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 7, 2019 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 26, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 25, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 4, 2019 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Sep 3, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 2, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 21, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 17, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 17, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 8, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |