Drawing for H

USPTO serial 79267526

H

Reviewed by CopyMark Law Group

Reg. 6197460Status 700Renewal
Filing date
Status date
Registration date
Nov 17, 2020
Examiner
GARCIA, CLAUDIA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with H?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*

Plus Government fees of $975

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey A. Smith

Jeffrey A. Smith Millen, White, Zelano & Branigan, P.C.2200 Clarendon BoulevardSuite 1400Arlington, VA 22201

Goods and services

ClassDescriptionStatusFirst use
011Heating apparatus, namely, direct fired tube furnaces, direct fired furnaces, petrochemical and refining furnaces, heat recovery units; steam producing apparatus, namely, heat recovery boilers, industrial boilers; distillation apparatus and installations for distillation, namely, direct fired tube furnaces, direct-fired furnaces, atmospheric and vacuum distillation furnaces; refining towers for chemical distillation; equipment and installations for oil refining and in particular furnaces and distillation columns, namely, direct fired tube furnaces, direct fired furnaces, petrochemical and refining furnaces for heating, vaporizing and thermal cracking of oil products or oil fractions; apparatus and installations for the processing of oil residues, namely, direct fire heating installations for vaporizing oil residues and for rectifying the vaporized charge in a vacuum distillation column unit; equipment and installations for the production of chemicals from hydrocarbons, in particular furnaces and distillation columns for the production of hydrogen, ethylene and synthesis gas, namely, steam methane reformer for the production of hydrogen from natural gas, furnaces used for steam cracking for the production of ethylene from ethane, and for the cracking of dichlorethylene for the production of vinyl chloride monomerACTIVE—
037Construction, rehabilitation, installation and repair services for industrial furnaces, permanent buildings, refineries, petrochemicals and hydrocarbon production plants; demolition of permanent buildings, refineries, petrochemicals and hydrocarbon production plants; installation and repair of heating apparatus, namely, directly fired tubular furnaces, directly fired furnaces, petrochemical and refining furnaces, heat recovery units, steam producing apparatus, namely, heat recovery boilers, industrial boilers, and distillation apparatus, namely, directly fired tubular furnaces, directly fired furnaces, atmospheric and vacuum distillation furnaces, for processing of gas and oilACTIVE—
042Scientific and industrial research services in the fields of energy, environment, natural resources, oil and hydrocarbons; technical project studies, namely, scientific research and studies in the fields of energy, environment, natural resources, oil and hydrocarbons; engineering services, namely, appraisals in the fields of energy, environment, natural resources, oil and hydrocarbons; drawing up of construction plans in the fields of energy, environment, natural resources, oil and hydrocarbons; research and development of new processes in the fields of energy, environment, natural resources, oil and hydrocarbons; industrial design in the fields of energy, environment, natural resources, oil and hydrocarbons; quality control in the fields of energy, environment, natural resources, oil and hydrocarbonsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 17, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jan 23, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 27, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 28, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 19, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 26, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 26, 2021FIMPFINAL DISPOSITION PROCESSED—
Feb 17, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 17, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 1, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 1, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 12, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 30, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 30, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Jul 30, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 30, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 30, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 12, 2020DOCKASSIGNED TO EXAMINER—
Apr 23, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 23, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 23, 2020ALIEASSIGNED TO LIE—
Apr 20, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 16, 2019RFNTREFUSAL PROCESSED BY IB—
Oct 31, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 30, 2019RFRRREFUSAL PROCESSED BY MPU—
Oct 10, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 9, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 8, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 4, 2019DOCKASSIGNED TO EXAMINER—
Oct 4, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 26, 2019LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Sep 19, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance