Drawing for RELCARE

USPTO serial 79269374

RELCARE

Reviewed by CopyMark Law Group

Reg. 6121252Status 700Renewal
Filing date
Status date
Registration date
Aug 11, 2020
Examiner
VO, JULIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RELCARE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $1,700

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Electronic and electric apparatus, devices and instruments for generation of electric energy, in particular current generators and electricity generators; apparatus and installations for generation and supply of energy by means of wind, namely, wind-powered installations for generating electricity on wind farms; apparatus and installations for generation and supply of energy by means of water, namely, hydroelectric installations for generating electricity on hydroelectric plants; apparatus and installations for generation and supply of energy by means of gas and steam, namely, combined gas and steam plants for generating electricity; apparatus and installations for generation and supply of energy by means of oil or coal, namely, oil or coal-fired power stations for generating electricityACTIVE—
009Apparatus, installations and instruments for conducting, switching, transforming, transmitting, distributing, accumulating, regulating or control of electricity and energy; substations for transmission and distribution of electricity; apparatus and installations for supply of electricity by means of solar energy, namely photovoltaic solar modules, solar panels for production of electricity, and batteries; apparatus and installations for generation and supply of energy by means of solar energy, namely photovoltaic solar modules, solar panels for production of electricity, and batteries; electric apparatus, devices and instruments as well as the parts thereof for energy generation by means of solar energy, namely photovoltaic solar modules, solar panels for production of electricity, and batteries; machines and apparatus for controlling energy; computer hardware and downloadable software for use with the generation, supply, transmission, storage and distribution of electricity and energy; computer hardware and downloadable software for control of energy and electricity and control of electrical systems; components, parts and accessories for the aforesaid goods, namely, semiconductor power elements, electrical usage meters, transformers, electrical switches, lightning surge arrestors, voltage testers, electric voltage transformers, voltage regulators, electric conductors, electric reactors, electric capacitors, electric contacts, electric converters and inverters, metal grounding bushings and metal grounding clamps both for use only as parts and fittings for coaxial cable and not for non-electric cable or machinery or machine partsACTIVE—
037Construction, installation, repair, modification and maintenance of systems, installations and apparatus, namely, installations and apparatus for use in generation, provision, transmission, storage and distribution of electricity and energy and electrical substations and substation systemsACTIVE—
042Industrial analysis and research services with respect to installations and apparatus for use in generation, provision, transmission, storage and distribution of electricity and energy; design and development of computer hardware and software for use in generation, provision, transmission, storage and distribution of electricity and energy; design and development of computer hardware and software for control of energy and electricity and control of electrical systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 11, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 1, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 9, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jul 30, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 5, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 26, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Apr 3, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 26, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 18, 2020CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 4, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 4, 2020FIMPFINAL DISPOSITION PROCESSED—
Nov 11, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 11, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 26, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 26, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 6, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 11, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 1, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Apr 1, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 1, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 1, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 21, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 20, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 20, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 20, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 20, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 20, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 14, 2019RFNTREFUSAL PROCESSED BY IB—
Nov 27, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 27, 2019RFRRREFUSAL PROCESSED BY MPU—
Nov 5, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 4, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 23, 2019DOCKASSIGNED TO EXAMINER—
Oct 22, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 16, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 10, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance