USPTO serial 79269949
INTAKS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 11, 2020
- Examiner
- BROWN, BARBARA TROFFKIN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with INTAKS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $1,275
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Scaffolding made of metal; metallic building materials, namely, wire, steel, girders of metal, rails of metal and materials of metal for scaffolds; metallic pipes, pipe fittings; metallic transportable buildings and structures, namely, temporary edge protection structures, namely, scaffolding made of metal; common metals and their alloys; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery in the nature of small items of metal hardware, namely, springs, washers, pulls, nuts, bolts, hinges, rivets, nails and screws; pipes and tubes of metal; safes; goods of common metal not included in other classes, namely, alloys of common metal and ingots of common metal; ores of metal | ACTIVE | — |
| 019 | Scaffolding made of non-metallic materials including those made of plastics; non-metallic building materials, namely, concrete, stones, cement, bricks, plaster, planks, plywood and non-metallic materials for scaffolds; non-metallic scaffolding pipes and pipe fittings; non-metallic transportable buildings and structures, namely temporary edge protection structures, namely, scaffolding made of non-metallic materials; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal | ACTIVE | — |
| 037 | Installation, assembly and disassembly of scaffolding systems, apparatus and structures; rental of scaffolding equipment; building and construction services, namely the building and construction of scaffolding systems, apparatus and structures; repair services, namely the repair of scaffolding systems, apparatus and structures; maintenance and servicing of scaffolding systems, structures and apparatus | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by INTAKS NZ LIMITED
- Other trademarks owned by INTAKS NZ LIMITED
- Other trademarks owned by INTAKS NZ LIMITED
- Other trademarks owned by INTAKS IP LIMTED
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 037
- Similar marks named INTAKS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 11, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 28, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Dec 26, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 4, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 3, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 11, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 11, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 26, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 26, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 6, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 9, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 25, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 24, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 24, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 7, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 20, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 19, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 24, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 23, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 21, 2020 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Dec 13, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 12, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 5, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 3, 2019 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Nov 29, 2019 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Oct 25, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 21, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 17, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |