Drawing for QFORT

USPTO serial 79270548

QFORT

Reg. 6182031Status 700Renewal
Filing date
Aug 15, 2019
Status date
Oct 27, 2020
Registration date
Oct 27, 2020
Examiner
INGOLD, GERALDINE

Need help with QFORT?

CopyMark Law Group can help you respond to USPTO correspondence, keep a registration alive, or watch new filings against your mark.

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Deadline: October 27th, 2026

Owner

  • PIER IP MANAGEMENT SRL

    RO

  • CASA NOASTRA S.R.L.

    RO

  • CASA NOASTRA S.R.L.

    RO

  • CASA NOASTRA S.R.L.

    RO

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; Metal reinforcement materials for building; Transportable buildings of metal; Materials of metal for railway tracks; Non-electric cables and wires of common metal; Ironmongery in the nature of small items of metal hardware, namely, thimbles and double-ended swivels; Ironmongery in the nature of small items of metal hardware, namely, door security hardware, namely, keys and key cylinders, non-powered door actuators; Ironmongery in the nature of small items of metal hardware, namely, gate hardware, namely, metal gate laches; Ironmongery in the nature of small items of metal hardware, namely, metal components for metal protective and security window shutters, namely, slats, shutterboxes, side frames, end caps, crank handles, pull straps, side tracks, ball bearings and installation hardware, namely, rollers, rails, cables, carriers, pins, locks, clips, brackets and screws; Pipes and tubes of metal; Safes; Goods of common metal not included in other classes, namely, wires, door pulls of metal, metal unwrought and semi-worked goods for further manufacture, door knobs, metal wall plaques, drawer pulls, split rings of common metal for keys; Ores of metalACTIVE
019Non-metallic building material, namely, manufactured glass, fiberglass, plastic, wood, cement, marble, and stone for use on floors, wall panels, walls, exterior surfaces, doors, windows, gates, shutters, window and door frames, sashes and casements of wood clad in aluminum, commercial buildings, and residential use; Non-metallic rigid pipes for building, asphalt, pitch and bitumen; Non-metallic transportable buildings; Monuments, not of metalACTIVE
035Advertising; Business management; Business administration; Providing office functionsACTIVE
037Building construction; Repair of interior and exterior surfaces, doors, windows, gates, shutters, window blind, repair works on buildings, pipeline, roofing, building scaffolds, building platforms, residential real property, masonry walls and structures, glass, locks, door frames; Installation services of doors, door frames, windows, gates, shutters, pipeline, roofing, building scaffolds, building platforms, window blind, masonry walls and structures, glass, locksACTIVE

Prosecution history

DateCodeEvent
Oct 27, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Feb 14, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED
Feb 3, 2022LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Dec 31, 2021RHRDRESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED
Dec 31, 2021CHLDCHANGE OF OWNER RECEIVED FROM IB
Mar 7, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 11, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 10, 2021FIMPFINAL DISPOSITION PROCESSED
Jan 27, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 27, 2020R.PRREGISTERED-PRINCIPAL REGISTER
Aug 11, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 11, 2020PUBOPUBLISHED FOR OPPOSITION
Aug 7, 2020GPNXNOTIFICATION PROCESSED BY IB
Jul 22, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jul 22, 2020OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jul 22, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 9, 2020ALIEASSIGNED TO LIE
Jul 6, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 6, 2020XAECEXAMINER'S AMENDMENT ENTERED
Jul 6, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jul 6, 2020GNEAEXAMINERS AMENDMENT E-MAILED
Jul 6, 2020CNEAEXAMINERS AMENDMENT -WRITTEN
Jun 12, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 11, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 11, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVED
Jan 3, 2020RFNTREFUSAL PROCESSED BY IB
Dec 17, 2019RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Dec 16, 2019RFRRREFUSAL PROCESSED BY MPU
Nov 22, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 21, 2019CNRTNON-FINAL ACTION WRITTEN
Nov 14, 2019DOCKASSIGNED TO EXAMINER
Nov 12, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Nov 5, 2019MAFRAPPLICATION FILING RECEIPT MAILED
Oct 30, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Oct 28, 2019PCOIPARTIAL CANCELLATION FROM ORIGINAL APPLICATION ENTERED
Oct 24, 2019SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB

Related guidance