Drawing for HO

USPTO serial 79271868

HO

Reviewed by CopyMark Law Group

Reg. 6258625Status 700Renewal
Filing date
Status date
Registration date
Feb 2, 2021
Examiner
WLODARCZYK, CAROLYN A
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with HO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*

Plus Government fees of $975

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Deborah Peckham

Deborah Peckham Barclay Damon LLP160 Federal Street, Suite 1001Boston, MA 02110United States

Goods and services

ClassDescriptionStatusFirst use
007Machines, machine tools, and mechanical installations for the wood, metal, plastic and furniture industries, in particular for the wood working and processing industry, the metal working and processing industry and the plastic working and processing industry, namely, drilling machines, power operated tools in the nature of drill presses, power operated drilling tools, power operated planing tools in the nature of electric planers, material handling machines in the nature of palletizers and automatic slip sheet dispensing machines for creating packaging, handling or conveying goods, and for automated feed and stacking of goods; woodworking machines, namely, saws, sanders, electric planers, routers and electric buffers for form machining and edge machining; veneering machines, namely, veneer manufacturing machines; formatting and profiling machines, namely, sanding machines, drilling machines and routers; postforming machines for laminated and veneer panels, trueing machines, namely wood joint trueing machines; coating machines, namely, lacquer and laminate coating machines; drilling machines; insertion machines, namely, machines for assembling products and packaging in the nature of palletizers and packaging machines; mounting machines and installations, namely, power-operated machines for mounting fiber-reinforced plastics and mounting and lifting installations for the transport of goods; leveling mounts for machines; wrapping machines and installations; saws, namely, metal sawing machines, wood sawing machines, power operated feed through wood sawing machines, power operated saws, saw machines; transport and handling units, namely, roller conveyors, transferring machines, namely belt conveyors; transfer stations in the nature of machine elements not for land vehicles in the nature of ball transfer units, driverless transport systems in the nature of conveyor belts, stacking machines, robots in the nature of industrial robots, feed and discharge systems for materials in machines in the nature of machines for sorting products and removing non-conforming materials, overhead rail systems in the nature of conveyors, material storage and sorting systems in the nature of machine operated platforms capable of elevation above ground level and used for storage; machines installations for transporting, rotating, turning, picking, storing and sorting, namely, conveyor belts and conveyor belt systems; feeding machines and feeding systems composed of feeding machines all for separating stacks; stacking machines and stacking systems composed of loading and unloading machines; storage machines and storage systems in the nature of machine operated platforms capable of elevation above ground level and used for storage and storage systems essentially consisting of the same for storage of materials, composite and lightweight panel installations; joinery machines and beam processing machines, and joinery centres and beam processing centres, namely, woodworking beam processing machines; machines for surface machining, edge machining and component manufacture; machines for timber construction, namely, wood sawing machines; clamping devices, being parts of machines, namely, clamps for use in the precision clamping of work pieces; machine beds and frames, namely, machine tool chasers and machine tool holders; mounts for machines and mechanical installations, namely, leveling mounts for machines; machine engine blocks; structural parts and fittings for the foregoing goods; all of the aforesaid goods solely in the field of wood, metal and plastic processing systems, and in the field of systems for processing combination and composite materialsACTIVE—
009Software, namely, downloadable CAD/CAM software for use in configuration and design of furniture and interiors, creating 3D graphics, creating production processes, and optimization of production processes; CAD/CAM software, namely, downloadable CAD/CAM software for use in furniture and interior fittings design and production; electric and electronic checking apparatus and instruments, namely, electronic monitor for furniture-making machines and carpentry machines; electric and electronic control systems and installations, namely, electronic control systems for wood working machines, packaging machines, sawing machines and cutting machines; programmable controllers for machines, namely, programmable logic controllers for machines; computer hardware and software for controlling machines and mechanical installations, namely, downloadable software and computer hardware for inputting or outputting computer numerical control (CNC) data for machine tools; downloadable industrial process control software for use in the field of creating and optimizing production processes; downloadable business technology software, namely, software for use in creating and tracking orders and for managing packaging, stacking and construction; all of the aforesaid goods solely in the field of wood, metal and plastic processing systems and in the field of systems for processing combination and composite materialsACTIVE—
037Installation of machines, mechanical installations and tools; repair and maintenance for machines, machine installations and tools; none of the aforesaid services in relation to construction equipment and pumpsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 2, 2026REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 20, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 16, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 16, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 16, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 30, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 4, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 4, 2021FIMPFINAL DISPOSITION PROCESSED—
May 2, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 2, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 17, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 17, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 14, 2020GPNXNOTIFICATION PROCESSED BY IB—
Oct 28, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 28, 2020OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 28, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 14, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 13, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 13, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 13, 2020ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 11, 2020GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 11, 2020GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 11, 2020CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 9, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 8, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 8, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 15, 2020RFNTREFUSAL PROCESSED BY IB—
Jan 27, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 27, 2020RFRRREFUSAL PROCESSED BY MPU—
Dec 31, 2019RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 30, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2019DOCKASSIGNED TO EXAMINER—
Nov 22, 2019MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 18, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 14, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance