USPTO serial 79274009
IP
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 8, 2020
- Examiner
- FALK, JONATHAN ROBERT
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with IP?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Industrie-Partner GmbH Radebeul-Coswig
Coswig, DE
Other trademarks owned by Industrie-Partner GmbH Radebeul-Coswig
Industrie-Partner GmbH Radebeul-Coswig
DE
Other trademarks owned by Industrie-Partner GmbH Radebeul-Coswig
Industrie-Partner GmbH Radebeul-Coswig
DE
Other trademarks owned by Industrie-Partner GmbH Radebeul-Coswig
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Myers
Jonathan Myers Lucas & Mercanti, LLP30 Broad Street, 21st FloorNew York, NY 10004United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, machine installations and machine parts for the construction of gear cutting machines and machine installations, for railways and the railway industry, namely, rail laying machines, mobile wheelset lifting and rotation units for railway cars, for the construction of vehicles, for the packaging industry, namely, packaging machines, for the production and distribution of energy, for the food and pharmaceutical industry, namely, granulators, mixers, blenders, electric food blenders, for paper processing, for engine and motor construction, for the ceramic industry, namely, grinding machines, for foundries, namely, molding and die-casting tools, namely, steel pins, molding presses being machine parts for dies and molds, for the construction of gear boxes; control mechanisms for machines, engines or motors, namely, pneumatic controls for machines, engines or motors | SECTION 70 - CANCELLED | — |
| 009 | Measuring apparatus in the nature of pressure gauges for railway sleeping cars, brake testers for measuring brake efficiency of brakes on railroad locomotives and railroad cars, testing benches for testing components of railroad locomotives and railroad cars; switch boards; electrical installations for the remote control of work cycles or industrial machines; regulating apparatus, namely, electrical controllers, voltage regulators | SECTION 70 - CANCELLED | — |
| 037 | Installation, maintenance and repair of railroad track laying machines; rebuilding machines that have been worn or partially destroyed;: modernization of machines, namely, machines for maintenance and repair of railroad tracks, railroad locomotives and railroad cars; installation and repair of electric appliances | SECTION 70 - CANCELLED | — |
| 040 | Metal treating | SECTION 70 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Industrie-Partner GmbH Radebeul-Coswig
- Other trademarks owned by Industrie-Partner GmbH Radebeul-Coswig
- Other trademarks owned by Industrie-Partner GmbH Radebeul-Coswig
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 040
- Similar marks named IP
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 28, 2025 | ERFT | TEAS REQUEST FOR TRANSFORMATION RECEIVED | — |
| Jun 13, 2025 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jun 13, 2025 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 23, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 15, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 29, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 29, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 8, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 8, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 23, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 23, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 3, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 21, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 20, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 20, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 20, 2020 | ALIE | ASSIGNED TO LIE | — |
| May 14, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 1, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 11, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 11, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 20, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 18, 2019 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 17, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 16, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 16, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 12, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |