USPTO serial 79274552
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,125
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Julianne Abelman
Julianne Abelman Womble Bond Dickinson (US) LLP950 3rd Avenue, Suite 2400New York, NY 10022UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Formwork in the nature of tables and scaffolding as well as components thereof for concrete construction; formwork in the nature of tables and scaffolding as well as components thereof made of metal or mainly of metal for the production of prefabricated building elements; load-bearing and support structures in the nature of load-bearing scaffolds, load towers, shoring, adjusting supports, rails, props, struts, girders, washers, joists, braces, support heads, floor supports, frameworks, as well as components thereof for formwork for use in concrete construction; scaffolds as well as components thereof; portable structures as well as components thereof for formwork use; transport aids for aforementioned goods, namely, bins, containers, and pallets made in whole or significant part of metal; ironmongery and small items of metal hardware for assembly, assembling aid, adjustment, locking as well as for disassembly of the aforementioned goods, as far as included in this class, namely, wedges, cones, nuts, anchor plates, couplings, damps, fasteners, plugs, spindles, stays, bolts, sleeves, retainers, lugs; all aforementioned goods made of metal or mainly of metal | ACTIVE | — |
| 007 | Apparatus and implements for horizontally, vertically or inclined moving formwork, load-bearing and support structures, scaffolds as well as components thereof, namely, mechanical and pneumatic hoisting apparatus | ACTIVE | — |
| 019 | Formwork in the nature of tables and scaffolding as well as components thereof for concrete construction; prefabricated building elements, namely, walls, platforms and precast concrete parts; formwork in the nature of tables and scaffolding as well as components thereof for the production of prefabricated building elements; load-bearing and support structures in the nature of load-bearing scaffolds, load towers, shoring, adjusting supports, rails, props, struts, girders, washers, joists, braces, support heads, floor supports, frameworks, as well as components thereof for formwork for use in concrete construction; all aforementioned goods not made of metal or mainly not of metal | ACTIVE | — |
| 037 | Assembly, disassembly and rental of formwork, of load-bearing and support structures, scaffolds, portable structures, transport aids, of formwork devices as well as of components thereof and formwork accessories; equipment service, namely, cleaning, maintenance, preventive maintenance, overhaul and repair of formwork, of load-bearing and support structures, of scaffolds, portable structures, transport aids, of formwork devices as well as of components thereof and formwork accessories; building construction supervision and providing information relating to building construction; constructional consultation and planning in the area of formwork engineering and concrete construction; all aforementioned services for third parties | ACTIVE | — |
| 042 | Engineering and consulting services in the area of formwork engineering and concrete construction, including planning, designing and developing of formwork, load-bearing and support structures and of scaffolds as well as of components thereof and of accessories therefore; developing formwork products; consulting in the area of concrete engineering and construction process, including monitoring, inspection as well as examination of concrete maturity, designing and developing of computer software in the area of formwork engineering, providing online, non- downloadable software in the field of formwork engineering for planning, designing and developing of formwork, load-bearing and support structures and of scaffolds and components to be used together therewith; providing temporary use of non-downloadable software for inspecting, tracking and processing of customer and formwork specific data and documents via computer networks, intranet and Internet; developing, installing and maintaining data processing programs for planning, administrating and use of formwork, load-bearing and support structures as well as of scaffolds and components thereof and of accessories therefore in the area of concrete construction; consulting services with respect to the use of such data processing programs; all aforementioned services for third-parties | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 7, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 4, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 22, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 22, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 22, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 22, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 26, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 21, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 2, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 2, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 7, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 7, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 21, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 21, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 1, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 16, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 16, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 16, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 16, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 16, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 11, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 10, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 10, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 22, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 5, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 5, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 11, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 10, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 3, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 27, 2019 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 23, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 23, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 19, 2019 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |