Drawing for VOLTAINER

USPTO serial 79274999

VOLTAINER

Reviewed by CopyMark Law Group

Reg. 6331028Status 700Renewal
Filing date
Status date
Registration date
Apr 27, 2021
Examiner
WRIGHT, LAURA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VOLTAINER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $548*

Plus Government fees of $650

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rhett V. Barney

Rhett V. Barney Lee & Hayes, PC601 W Riverside, Suite 1400Spokane, WA 99201UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electric cables and wires; electricity measuring instruments, namely, battery measuring instruments; electric power distribution units; electrical cells and batteries; lithium ion batteries; battery jars; battery boxes; battery leads; chargers for electric batteries; battery packs; battery testers; plates for batteries; battery adapters; battery separators; battery chargers; rechargeable batteries; batteries for vehicles; charging stations for electric vehicles; electric batteries for vehicles; electronic control units, namely, control units for controlling the charging and discharging of batteries; electrical test apparatus, namely, electronic apparatus for testing batteries, battery packs, or battery boxes; electric connection circuit boards; solar panels for the production of electricity; photovoltaic apparatus for generating electricity; photovoltaic apparatus and installations for generating solar electricity; electrical distribution boxes; electrical fuses; electrical monitoring apparatus for monitoring the charge of batteries; electrical circuit boards; calculating machines, data processors, computers; wireless controllers for remote monitoring and control of the function and status of electrical, electronic and mechanical devices or systems; downloadable computer software for monitoring, transforming, accumulating, regulating or controlling electricity, electricity consumption, charging of batteries, batteries and battery chargersACTIVE—
042Technological consultation services in the field of energy storage, in particular batteries, battery packs and battery boxes; technical consultancy design and development services relating to batteries, battery chargers, battery characteristics, generation of electricity, electric apparatus and instruments and electric vehicles; research and consultancy, namely, technological research in the field of energy storage, consulting in the field of energy storage, in particular relating to batteries, battery packs and battery boxes; information technology consultancy; development of technologies for the protection of electronic networks; development of control programs for electric control and drive modules; development of testing apparatus for electrical wires; industrial analysis and research, namely, analysis and research in energy storage, battery packs, battery boxes, and batteries; design and development of computer hardware and software; design and development of batteries, battery chargers and apparatus, instruments and cables for conducting, switching, transforming, accumulating, generating, storage, regulating or controlling electricity; research in the field of energy; programming of software for energy management and energy consumption; engineering services relating to energy supply systems; design and development of energy management software; design and development of regenerative energy generation systems; technological analysis relating to energy and power needs of others; consultancy relating to technological services in the field of power and energy supplyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 27, 2026REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 30, 2025CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 7, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 29, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 10, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 10, 2021FIMPFINAL DISPOSITION PROCESSED—
Jul 27, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 8, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 27, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 4, 2021GPNXNOTIFICATION PROCESSED BY IB—
Feb 9, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 9, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 20, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 20, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 20, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 4, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 19, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 18, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 18, 2020ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 24, 2020GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 24, 2020GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 24, 2020CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 2, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 1, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 1, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 28, 2020RFNTREFUSAL PROCESSED BY IB—
Feb 13, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 13, 2020RFRRREFUSAL PROCESSED BY MPU—
Jan 22, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 21, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 10, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 6, 2020DOCKASSIGNED TO EXAMINER—
Jan 6, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 26, 2019REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance