Drawing for BALCKE DÜRR

USPTO serial 79275540

BALCKE DÜRR

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
FINK, GINA M
Law office
TMEG LAW OFFICE 109 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with BALCKE DÜRR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
011Heat exchangers, in particular stationary heat exchangers, regenerative heat exchangers, compact heat exchangers; cooling towers; rotor air coolers; condensers, in particular turbine condensers, water-cooled surface condensers; cold-end systems for nuclear power plants; heat regenerators; air preheater; feed water heaters; gas-gas heaters; air heaters; reheaters, in particular moisture separator reheaters; pre-separators for the cleaning and purification of air and gas; process gas coolers; desuperheaters; gas and air purification equipment, in particular filter systems for gas and air purification, particle separators, separator ducts and layer separators, centrifugal and axial fans, flue gas pipelines; boilers; pressure vessels; flash tanks; solar steam generators; thermal storage systems, in particular storage heat exchangers; parts and accessories for all aforementioned goodsACTIVE—
037Installation, maintenance, repair and optimization by performance enhancement through increase of operating life and reduction of internal consumption of industrial plants and power plants, in particular installation, maintenance, repair and optimization by performance enhancement through increase of operating life and reduction of internal consumption of heat exchangers, cooling towers, condensers, feed water heaters, cold end systems, gas and air purification equipment and boilers; consultancy in the areas of gas cleaning and dust removal; uninstallation, dismantling and clearing of nuclear power plantsACTIVE—
042Maintenance planning for industrial plants and power plants, in particular for heat exchangers, cooling towers, condensers, feedwater heaters, cold end systems, gas and air purification equipment and boilers; engineering, technological consultancy and design services for power plants, in particular for coal fired power plants, combined cycle power plants, concentrated solar power plants, geothermal power plants, nuclear power plants, waste-to-energy power plants, biomass power plants, fluid mechanics; consultancy in the areas of technologies for environmental protection; development of safety concepts for the installation, maintenance, repair and optimization of industrial plants and power plants; safety testing relating to radiation areaACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 24, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 11, 2021FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 25, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 25, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 20, 2021OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 2, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 2, 2021OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 25, 2020MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 25, 2020ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Feb 28, 2020RFNTREFUSAL PROCESSED BY IB—
Feb 12, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 11, 2020RFRRREFUSAL PROCESSED BY MPU—
Jan 15, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 14, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 14, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 8, 2020DOCKASSIGNED TO EXAMINER—
Jan 8, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance