Drawing for A-MOTION

USPTO serial 79276023

A-MOTION

Reviewed by CopyMark Law Group

Reg. 6557308Status 700Renewal
Filing date
Status date
Registration date
Nov 16, 2021
Examiner
EISNACH, MICHAEL PATRICK
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with A-MOTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Todd A. Denys

Todd A. Denys Porzio, Bromberg & Newman, P.C.600 Alexander Road, Suite 2-1Princeton, NJ 08540UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Scientific being other than for medical use, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signaling, checking being supervision, life-saving and teaching apparatus and instruments, namely, tracking systems primarily comprised of programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input, automatic solar tracking sensors, and motors, gears and drives for orientating solar panels, control-command for solar trackers in the nature of programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input, fixed tilt structures in the nature of photovoltaic installation apparatus being tracking mechanisms; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, fixed tilt structures in the nature of photovoltaic installation apparatus being tracking mechanisms, tracking system apparatus in the nature of programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input, automatic solar tracking sensors; electric batteries; electric wires; electric relays; solar tracking system primarily comprised of solar panels for the production of electricity and recorded software for operating solar panelsACTIVE—
011Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes, namely, parabolic trough; air-conditioning apparatus and installationsACTIVE—
037Installation, maintenance, servicing, troubleshooting, repair, overhaul of solar tracking plants, devices and technology being hardware for solar tracking plantsACTIVE—
042Design, development and consulting for the operation of renewable energy production plants, particularly solar plants, of solar tracking devices and technologies; verification, control in the nature of technical verification and validation, operation and maintenance in the field of renewable energy production, particularly solar energy production, power plants, corresponding solar tracking devices and technology; construction drafting; engineering services in the field of renewable energy production, in particular solar energy, power plants, and corresponding solar tracking devices and technology; engineering, expert reports in the nature of engineering reports in the field of renewable energy production, in particular solar energy, power plants, corresponding solar tracking devices and technology; industrial analysis and research services in the field of fixed tilt structures, tracking systems apparatus; research and development in the field of renewable energy production, in particular solar energy, power plants, corresponding solar tracking devices and technology; and research and development of technology solutions in the field of renewable energy production, in particular solar energy, power plants, corresponding solar tracking devices and technology; prototyping, namely, design and development of new products for others; technical consultancy, in the nature of testing of carbon and energy assessments; technical project study, namely, technical project planning in the field of solar power plants; technical project design, development and research in the field of energy; technical studies, analysis and evaluation, namely, technical project planning in the field of solar power plants; evaluation of technical facilities in the nature of solar power plants; quality control for others; testing of materials; diagnostics, advice, technical consultancy and information relating to the aforesaid services; diagnostics, technical advice, consultancy and information on energy savings and renewable energy production, in particular solar energy, power plants, corresponding solar tracking devices and technologyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 17, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 17, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 17, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 17, 2022EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Aug 17, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 17, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 17, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
May 23, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 3, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 3, 2022FIMPFINAL DISPOSITION PROCESSED—
Feb 16, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 16, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 31, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 31, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 29, 2021GPNXNOTIFICATION PROCESSED BY IB—
Aug 11, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 11, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 11, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 27, 2021PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 26, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 21, 2021NREVNOTICE OF REVIVAL - E-MAILED—
Jul 21, 2021ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 21, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 21, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 21, 2021ALIEASSIGNED TO LIE—
Jul 21, 2021PGRRPETITION GRANTED - RESPONSE RECEIVED—
Jul 20, 2021ERTPTEAS RESPONSE TO PETITION DEFICIENCY RECEIVED—
Jun 27, 2021OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 23, 2021PINMINCOMPLETE PETITION NOTICE MAILED—
Jun 23, 2021ISPOWITHDRAWN FROM ISSUE - PETITIONS OFFICE REQUEST—
Jun 22, 2021APETASSIGNED TO PETITION STAFF—
Jun 14, 2021PETRPETITION TO REVIVE-RECEIVED—
Jun 14, 2021TPDRTEAS PETITION TO DIRECTOR RECEIVED—
Jun 9, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 9, 2021OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 18, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 18, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 16, 2021GPNXNOTIFICATION PROCESSED BY IB—
Apr 28, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 28, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 28, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 14, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 14, 2021XAECEXAMINER'S AMENDMENT ENTERED—
Apr 14, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 14, 2021GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 14, 2021CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 1, 2020GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 1, 2020GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 1, 2020CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 21, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 21, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 21, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 3, 2020RFNTREFUSAL PROCESSED BY IB—
Mar 19, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 19, 2020RFRRREFUSAL PROCESSED BY MPU—
Mar 3, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 2, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 25, 2020DOCKASSIGNED TO EXAMINER—
Jan 14, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 10, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 9, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance