Drawing for ZEE ZERO EMISSION ENERGY

USPTO serial 79277762

ZEE ZERO EMISSION ENERGY

Reviewed by CopyMark Law Group

Reg. 6805445Status 700Registered
Filing date
Status date
Registration date
Aug 2, 2022
Examiner
SABLE, ERIC
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ZEE ZERO EMISSION ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael Pesochinsky

Michael Pesochinsky Pesochinsky LLC // MyBrandMark.com9 Warner WayWayne, NJ 07470UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy from renewable sources; electrical energyACTIVE—
007Internal combustion engines for power generation, other than for land vehicles; steam engine boilers for power generation, other than for land vehicles; gas operated power generators; turbines, other than for land vehicles; gas turbines for power generation other than for land vehicles; replacement parts for all of the aforesaid goodsACTIVE—
011gas burners; gas stoves; steam accumulators; steam generating installations; treatment installations, namely, sewage treatment plants for biomass and biodegradable waste; apparatus for dehydrating food waste; steam generating installations; gas operated devices, namely, electric air dryers and mechanical air dryers used in drying of agriculture, forest, chemical and industrial products; air dryers for production processes; heating apparatus for solid, liquid or gaseous fuels; HVAC units for heating, ventilation and air conditioning; regulating accessories, namely, metered valves for regulating water, steam valves, air valves for steam heating installations; drying apparatus, namely, electric air dryers and mechanical air dryers for drying of agriculture, chemical and industrial products for industrial, chemical and agriculture processing; installations for the collection of gases, namely, direct vents for gas appliances; industrial ovens and furnaces not for food or beverages; drying machines for agriculture; safety accessories for water or gas apparatus and pipes, namely, meter valve meter regulating accessories for water or gas apparatus and pipes; drying apparatus, namely, drying of agriculture, chemical and industrial products for industrial, chemical and agriculture processing; air cooling apparatus; heating installations; automatic ash conveyor installations, namely, furnace ash boxes; water heaters for industrial use; air-conditioning ventilation installations and apparatus; evaporators for air conditioners and industrial processes; cooling installations and machines, namely, absorption cooling machines and refrigerators; animal feed drying apparatus; gas boilers; industrial drying installations, namely, food, forage and kiln drying apparatus; gas burners for industrial purposes; hot air apparatus, namely, hot air blowers; hot air space heating apparatus for industrial purpose; apparatus for dehydrating food waste; gas fired water heaters; refrigerating machines; cooling appliances and installations, namely, absorption cooling machines and air conditioners; cooling installations, namely, absorption cooling machines and refrigerators for liquids; apparatus for vapour producing installations, namely, steam vaporizers for adding humidity to the air; heat generating apparatus, namely, heat generators; water heaters; desiccating apparatus, namely, desiccating units for agriculture products and industrial and chemical processes; installations for the burning off of gases, namely, flare stacks for use in the oil industry and the bioenergy industry; drying installations, namely, drying machines for food and industrial applications; harvest drying machines; gas boilers; installations for evaporating, namely, heating and cooling evaporators; apparatus for heating, namely, hot water tanks and hot water pipelines sold as a unit; hot water heating installations, namely, hot water tanks and hot water pipelines sold together as a unit; refrigerating apparatus and machines, namely, refrigerators; hot water heaters; gas fired heating installations, namely, water, liquid and air heaters; burners, boilers and heaters, namely, natural and biogas burners, heating boilers; heating boilers; heating, ventilating, and air conditioning and purification equipment, namely, solar water heaters, water purification installations for rainwater and dirt water, sewage and sludge purification installations; hot air space heating apparatus; gas burners; replacement parts for all of the aforesaid goodsACTIVE—
037Installation of generators and machinery for generating electricity; repair of power generating apparatus and installations; installation of plants for solar, wind, hydro, and biomass renewable energy production; servicing, namely, maintenance and repair of power generating apparatus and installations;installation of power generating apparatus; maintenance and repair of cooling appliances and installations; repair or maintenance of power generators; maintenance of commercial electrical systems; servicing, namely, maintenance and repair of power generating apparatus and installations;maintenance and repair of gas and electricity installations; maintenance and repair of energy generating installations; maintenance of power generating apparatus and installations; maintenance of plants/installations for solar, wind, hydro, and biomass renewable energy productionACTIVE—
040Rental of electricity generators; electricity generating; energy production; production of electrical power from renewable sources; leasing of energy generating equipment; gas production services; rental of apparatus for the treatment and transformation of materials, namely, fossil and nonfossil feedstock, solar, wind and hydro, for the generation of energy and customised contract manufactureACTIVE—
042Advisory services relating to the use of renewable, waste energy, namely, technological consulting services in the field of renewable energy and waste to energy; technological consulting services in the field of alternative energy generation; design and development of regenerative energy generation systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 27, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 8, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 8, 2022FIMPFINAL DISPOSITION PROCESSED—
Nov 2, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 2, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 2, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 23, 2022GPNXNOTIFICATION PROCESSED BY IB—
May 17, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 17, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 27, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 27, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 27, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 14, 2022FIXDELECTRONIC RECORD REVIEW COMPLETE—
Apr 1, 2022ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Mar 28, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 28, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Mar 28, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 28, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 28, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 18, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 18, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 18, 2022ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 31, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 29, 2021WOAGWITHDRAWAL OF ATTORNEY GRANTED—
Dec 29, 2021WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED—
Dec 29, 2021EWORTEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED—
Dec 29, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 29, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 21, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 21, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 21, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 24, 2021OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 23, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 23, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 23, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 7, 2021OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 14, 2021DOCKASSIGNED TO EXAMINER—
Jan 25, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 25, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 25, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 9, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 9, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 9, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 9, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 9, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 9, 2020ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Sep 9, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 9, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 9, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Mar 28, 2020RFNTREFUSAL PROCESSED BY IB—
Mar 9, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 9, 2020RFRRREFUSAL PROCESSED BY MPU—
Feb 16, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 15, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 12, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 8, 2020DOCKASSIGNED TO EXAMINER—
Feb 8, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 6, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance