USPTO serial 79278205
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Rebeccah Gan
Rebeccah Gan Muncy, Geissler, Olds & Lowe, P.C.4000 Legato Road, Suite 310Fairfax, VA 22033UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Monitoring apparatus for monitoring the quality of electric power, other than for medical purposes; remote control apparatus to be used in the field of electric power compensation and electric power quality technology; remote control devices for suppressors for electrical noise; industrial automation controls to be used in the field of electric power compensation and electric power quality technology; electrical controllers to be used in the field of electric power compensation and electric power quality technology; electric control devices and control apparatus and downloadable computer software for controlling suppressors for electrical noise; electrical controls for valve operators; electric installations for the remote control of industrial operations to be used in the field of electric power compensation and electric power quality technology; energy control devices for controlling electric power flow in electric power network; electric current control devices for controlling electric power flow in electric power network; electric current regulators; energy regulators for controlling electric power flow in electric power network; apparatus for monitoring electrical energy consumption; current converters; current limiting reactors; electric current switches for controlling electric power flow in electric power networks; instruments for distributing electrical current; conductors, electric; electrical connectors to be used in the field of electric power compensation and electric power quality technology; anti-interference devices for suppressing electrical noise to be used in electric power networks; suppressors being active filters for electrical noise to be used in electric power networks; active filters for electric power networks, devices for reactive power compensation and devices for filtering harmonic waves in electric power networks; static and dynamic compensators for electric power networks; static var compensators; static synchronous compensators (statcom); thyristors; thyristor valves; current collectors, electric; converters, electric; voltage converters; electricity inverters; current rectifiers; electrical inductors; high tension batteries; batteries, electric; chargers for electric batteries; charging stations for electric vehicles; electrical storage batteries; electricity storage apparatus, namely, batteries and capacitors; touch screens for suppressors for electrical noise to be used in electric power networks; electronic publications in the nature of brochures, magazine and journals in the field of energy saving technology, downloadable; downloadable implementation manuals and handbooks in the field of electric power compensation and electric power quality technology | ACTIVE | — |
| 042 | Technological consultancy in the field of electric power compensation and electric power quality technology; research in the field of environmental protection; consultancy in the field of energy-saving technology; scientific research in measurement technology; design and development of suppressors for electrical noise and noise-suppression systems; design and development of energy storage devices for uninterrupted electric power supply; engineering; design of measurement systems; quality control for others; control technology consulting services; computer services for the analysis of waveform data obtained from electric power networks; cloud computing featuring software for monitoring and controlling the quality of electric power in electric power network; software as a service (SAAS) featuring software for controlling suppressors for electrical noise; online data storage; electronic data storage; monitoring of computer systems by remote access; electronic monitoring and control of quality of electric power by remote access; provision of reports being electronic monitoring services using computers and sensors relating to quality of electric power | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 6, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 13, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 26, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Dec 26, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 26, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 26, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 26, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 24, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Dec 16, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 16, 2021 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Dec 16, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 16, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 7, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 20, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 20, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 6, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 6, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 24, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 19, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 19, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 30, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 30, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 30, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 16, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 8, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 8, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 8, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 8, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 26, 2020 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 26, 2020 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 26, 2020 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 3, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 3, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 3, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 28, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 12, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 12, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 20, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 19, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 15, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 11, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 11, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 6, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |