USPTO serial 79278319
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $850
SMART BUILDINGS ALLIANCE FOR SMART CITIES
FR
Other trademarks owned by SMART BUILDINGS ALLIANCE FOR SMART CITIES
SMART BUILDINGS ALLIANCE FOR SMART CITIES
FR
Other trademarks owned by SMART BUILDINGS ALLIANCE FOR SMART CITIES
SMART BUILDINGS ALLIANCE FOR SMART CITIES
FR
Other trademarks owned by SMART BUILDINGS ALLIANCE FOR SMART CITIES
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
William S. Fultz
William S. Fultz Womble Bond Dickinson (US) LLP555 Fayetteville Street, Suite 1100Raleigh, NC 27601UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction consultation; consultancy on the construction of connected and interoperable buildings; consultancy with respect to construction, repair and installation of buildings, public or private facilities, for the purposes of environmental preservation, building connectivity, building interoperability, land-use planning, urban planning and roads; construction information; information with respect to the construction of connected and interoperable buildings; providing information relating to repairs; information with respect to repair of connected and interoperable buildings; construction work supervision and management; supervision and management of building construction for connected and interoperable buildings | ACTIVE | — |
| 042 | Technical information services in the field of standards, rules and benchmarks in the field of environmental and sanitary quality of buildings, building connectivity and interoperability and building safety, namely, providing technical information in the field of environmental assessment and planning, environmental testing and inspection services, engineering services as it relates to environmental compliance and environmental engineering, testing and inspection services; consultancy services with respect to building improvements and in the field of construction; scientific and technological services, namely, research and design relating thereto, in the field of construction, land-use planning, urban planning and roads, namely, assessment, appraisals and research in the scientific and technological fields, provided by architects, engineers, researchers; advice related to energy saving, in particular energy auditing; energy auditing; technical consultancy with respect to digital transition, connectivity and interoperability of buildings; energy auditing with respect to digital transition, connectivity and interoperability of buildings; providing scientific information and advice on carbon offsetting; construction drafting; industrial design; urban planning; quality control for others; quality control with respect to construction, land-use planning, urban planning and roads services; testing of materials; calibration; research departments, namely, architectural research; conducting of technical project studies, namely, conducting scientific feasibility studies, conducting of feasibility studies in the field of new technologies and conducting feasibility studies in the field of environmental engineering; architectural consultancy; surveying; technical research in the field of construction, land-use planning, urban planning and roads; mechanical and physics research; research with respect to building construction; environmental protection-related research; research with respect to building connectivity and interoperability; technical support for main contractors relating to construction and land development, namely, providing technical advice relating to the implementation of standards, rules and benchmarks in the field of environmental and sanitary quality of buildings, building connectivity and interoperability and building safety; technical support for local authorities with respect to construction, digital transition, sustainable development, land-use planning and urban planning, namely, providing technical advice relating to the implementation of standards, rules and benchmarks in the field of environmental and sanitary quality of buildings, building connectivity and interoperability and building safety; technical support for companies and individuals in the field of construction, digital transition, sustainable development, land-use planning and urban planning, namely, providing technical advice relating to the implementation of standards, rules and benchmarks in the field of environmental and sanitary quality of buildings, building connectivity and interoperability and building safety | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 12, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 25, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jan 4, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 15, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 15, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 25, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 25, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 9, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 9, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 20, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 5, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 5, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 5, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 5, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 5, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 25, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 24, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 24, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 3, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 16, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 16, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 26, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 25, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 18, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 17, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 14, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 13, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |