USPTO serial 79282004
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $975
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kevin W. Guynn
Kevin W. Guynn Greer, Burns & Crain, Ltd.200 W. Madison St.Suite 2100Chicago, IL 60606| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Crushing, milling, pressing, milling and sifting machines for industrial purposes and parts therefor for the cement, coal and metal industries; crushing machines and parts therefor, in particular cone crushers and roller crushers for the cement, coal and metal industries; milling machines and parts therefor, in particular roller mills, hammer mills, ball mills, roller plate mills and vertical mills for the cement, coal and metal industries; industrial machine presses, in particular roller presses and briquetting machines; machine parts, namely, millstones and ring bindings with and without hard bodies for mill rollers or press rollers; mechanical installations in the nature of sifting machines and parts therefor for separating of fine bulk materials, in particular wind, cascade and rod basket sifters; installations for crushing bulk material, namely, circulatory milling machines; none of the aforesaid goods being welding machines, electric, and/or cutting machines and/or parts therefor | ACTIVE | — |
| 037 | Factory construction, namely, construction of cement, coal and metalworks factories; construction services, namely, installation, assembly, conversion, commissioning, repair, maintenance and servicing of cement, coal and metallurgical installations; building contractor services, namely, technical preparation of building projects, namely, in the field of construction of industrial installations | ACTIVE | — |
| 042 | Engineering, namely, planning, construction, selection, composition and dimensioning of machine installation parts for the cement, coal and metal industries, and design and programming of process automation installations; technical consultancy and technical project feasibility studies in the field of plant engineering, namely, in the field of the cement, coal and metal industries; technical, geological and scientific surveys, namely, in the field of the cement, coal and metal industries; land surveying; physics research, namely, energy calculations and simulations of industrial processes, and calculation and simulations of mechanical distribution of energy in static and dynamic installation parts; chemical laboratory services, namely, analysis of building materials; conducting of technical tests, namely, conducting of stone crushing and dust classification testing; geological and scientific surveys; research in the field of environmental protection, in the field of chemistry, cement, coal and metal technology and mechanical engineering; none of the aforesaid services in the field of welding and/or cutting; structural and civil engineering | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 8, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 8, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 8, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 8, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 5, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 13, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 12, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 8, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 8, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 22, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 22, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 2, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 17, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 5, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 4, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 4, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 15, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 30, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 30, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 21, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 20, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 4, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 31, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 31, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 26, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |