USPTO serial 79282758
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,950
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Robbie R. Harmer
Robbie R. Harmer ThyssenKrupp North America, LLCSUITE 2400111 W. JACKSON BLVD.CHICAGO, IL 60604| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Anchors, metal tie rods, metal fasteners for positioning or embedding carbon reinforced rebars or grids in concrete structures, metal connectors for fixation of pre-tensioned or non-pre-tensioned carbon composite elements in building and civil structures, and connecting elements of metal for linking multiple carbon composite elements in building and civil structures; stainless steel and titanium for use as building and construction materials; metal hardware, namely, metal clamps, tension links of metal, metal connectors for decking and decking joists; replacement parts and accessories in the nature of joining, linking or connecting carbon metal composite elements, particularly rebars and grids, for all the aforesaid goods | ACTIVE | — |
| 008 | Hand-operated fastening and joining tools, namely, rebar and grid tying tools; hand-operated tools and implements for treatment of materials, namely, cutting tools and manually-operated grindstones for composite materials, hand-operated milling cutters for construction, repair and maintenance of composite rebars and grids; replacement parts and accessories in the nature of substitute cutting blades and grinding stones for all the aforesaid goods | ACTIVE | — |
| 019 | Reinforcement rods, not of metal, for reinforcing concrete structures, particularly, buildings, bridges, dams, harbor infrastructure, coast protection infrastructure, silos and tanks, nuclear and blast-containment structures, hardstands and pavements, and for pre-tensioned and post-tensioned concrete structures; latticework, not of metal; building and construction materials and elements, not of metal, namely, building cover panels for reinforcing concrete structures; latticed mesh for building, not of metal | ACTIVE | — |
| 020 | Fasteners, non-metallic, namely, non-metal threaded fasteners; non-metal fastening anchors for securing wheels to vehicles; non-metallic hardware, namely, non-metal threaded fasteners, clips, not of metal, for cables and pipes, non-metallic cable fasteners, fastening anchors and bolts all for linking composite element with surrounding structural elements, non-metal anchoring bolts, non-metal hooks, non-metal suspension devices in the nature of springs to create compensating pre-stressed reinforcements, screw rings, not of metal, spacer rings of polymeric elements being non-metal hardware, non-metal poles, and non-metal, non-mechanical tension reel for tensioning belts in the nature of reinforced composite belts | ACTIVE | — |
| 022 | Ropes, not of metal; raw textile fibers and substitutes therefor in the nature of glass fibers for textile use and carbon fibers for textile use; goods made of textile and fibers, namely, cargo slings of rope or fabric, wrapping or binding bands not of metal, cordage, and commercial nets; parts and accessories for all the aforesaid goods, namely, non-corrosive rope connectors in the nature of non-metal cables | ACTIVE | — |
| 042 | Engineering consultancy services; product development; technical consultancy relating to product development; scientific and technology services, namely, technology advice provided to customers with regard to application of composite rebars and grids for building and civil structures and basic product research and development for enhanced composite reinforcement elements in the field of building and civil structures; design services in the field of architecture design and civil engineering; technological consultation services in the field of structural reinforcements of building and civil structures | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 21, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 26, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 26, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 14, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 12, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 8, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 24, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 14, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 11, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 3, 2021 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 28, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 28, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 15, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 15, 2021 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 8, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 8, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 8, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 21, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 30, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 30, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 30, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 30, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 30, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 30, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 30, 2021 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 30, 2020 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 30, 2020 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 30, 2020 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 16, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 16, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 4, 2020 | ALIE | ASSIGNED TO LIE | — |
| Sep 16, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 16, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 23, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 3, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 3, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 18, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 17, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 14, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 10, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 10, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 9, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |