Drawing for VELATIA

USPTO serial 79283173

VELATIA

Reviewed by CopyMark Law Group

Reg. 6585300Status 700Renewal
Filing date
Status date
Registration date
Dec 14, 2021
Examiner
KUNKLEMAN, SARAH E
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VELATIA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $797*

Plus Government fees of $975

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Bradley J. Walz

Bradley J. Walz Taft Stettinius & Hollister LLP2200 IDS Center, 80 South 8th StreetMinneapolis, MN 55402UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009electrical conductors for transformers; electrical switchgears for primary and secondary distribution, namely, gas insulated cubicles, air-insulated cubicles, gas-insulated compact modular cubicles; withdrawable circuit breakers, low, medium and high voltage switchboards, voltage boosting devices for electric power lines, electrical switches, transformers for the distribution of electricity, transformer substations, electrical transducers, electrical transformers, namely, power transformers and high voltage transformers; patch panels for housing electrical components, electrical connectors for power converters and electrical power connectors, and electrical switches; electrical terminal blocks, electrical receptacles, electrical distribution boxes, electric switchgear and control cabinets specially adapted for electric control panels; vacuum tubes for switchgear, specially designed cabinets for holding switchgear, electrical connectors, electrical cables, electrical wires, electrical resolvers, electrical shielding spacers for cables and cable assemblies, electrical relays, electrical power connector, electrical fuses, electrical inductors, electrical controllers, electrical circuit boards, high, medium and low-voltage switchgear, electrical distribution systems, namely, power distribution panels; electrical controls for switchgear and power system control, namely, remote controls for operating switchgears and electrical power supply equipment; electrical and electronic apparatus and instruments for receiving and processing broadcast signals, namely, antennae, amplifiers distribution transformers, FM modulators and electrical signal attenuators; electrical connectors, electronic installations for the remote control of industrial operations, electronic apparatus for the remote control of industrial operations, electronic cordless controls for industrial equipment, electronic communications equipment for sensing and displaying information, namely, optical transceivers; electronic communications equipment used for the transmission and reception of electronic data for display on either digital or analog readout device, namely, telecommunications transmitters, wireless transmitters and receivers; battery chargers, namely, general purpose battery chargers and battery charging units; apparatus for recording, transmission or reproduction of sound or images, namely, blank magnetic data carriers; all the foregoing being scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signaling, checking being supervision, life-saving and teaching apparatus and instruments and/or apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; automatic vending machines and mechanisms for coin-operated apparatus; cash registers, calculating machines, data processing equipment, computersACTIVE—
037Construction of buildings; repair of electricity conductors, switches, transformers, electrical accumulation and storage units, electrical regulators and controllers; gas insulated cubicles, air-insulated cubicles, withdrawable circuit breakers, gas-insulated compact modular cubicles, distribution transformers, low, medium and high voltage switchboards, transformer substations; voltage boosting devices for electric power lines, electrical switches, patch panels for housing Construction of buildings; repair of electricity conductors, switches, transformers, electrical accumulation and storage units, electrical regulators and controllers; repair of gas insulated cubicles, air-insulated cubicles, withdrawable circuit breakers, gas-insulated compact modular cubicles, distribution transformers, low, medium and high voltage switchboards, transformer substations; repair of voltage boosting devices for electric power lines, electrical switches, patch panels for housing electrical components, electrical connectors, and electrical switches, electrical connectors, electrical cables, electrical wires, electrical transformers, electrical transducers, electrical terminal blocks, electrical resolvers, electrical shielding spacers for cables and cable assemblies, electrical sensor apparatus, electrical relays, electrical receptacles, electrical power connectors, electrical fuses, electrical inductors, electrical distribution boxes; repair of electrical distribution systems, data processors, computers, and computer peripherals; repair of photovoltaic installations; repair of wind-powered electricity generators information technology systems and security systems; repair of antennae, amplifiers, distributors, modulators and attenuators, electrical connectors and electronic installations for the remote control of industrial operations; installation of electricity conductors, switches, transformers, electrical accumulation and storage units, electrical regulators and controllers; installation of gas insulated cubicles, air-insulated cubicles, withdrawable circuit breakers, gas-insulated compact modular cubicles, distribution transformers, low, medium and high voltage switchboards, transformer substations; installation of voltage boosting devices for electric power lines, electrical switches, patch panels for housing electrical components, electrical connectors, and electrical switches, electrical connectors, electrical cables, electrical wires, electrical transformers, electrical transducers, electrical terminal blocks, electrical resolvers, electrical shielding spacers for cables and cable assemblies, electrical sensor apparatus, electrical relays, electrical receptacles, electrical power connectors, electrical fuses, electrical inductors, electrical distribution boxes; installation of electrical distribution systems, data processors, computers, and computer peripherals; installation of photovoltaic installations; installation of wind-powered electricity generators information technology systems and security systems; installation of antennae, amplifiers, distributors, modulators and attenuators, electrical connectors and electronic installations for the remote control of industrial operationsACTIVE—
042Construction of buildings; repair of electricity conductors, switches, transformers, electrical accumulation and storage units, electrical regulators and controllers; repair of gas insulated cubicles, air-insulated cubicles, withdrawable circuit breakers, gas-insulated compact modular cubicles, distribution transformers, low, medium and high voltage switchboards, transformer substations; repair of voltage boosting devices for electric power lines, electrical switches, patch panels for housing electrical components, electrical connectors, and electrical switches, electrical connectors, electrical cables, electrical wires, electrical transformers, electrical transducers, electrical terminal blocks, electrical resolvers, electrical shielding spacers for cables and cable assemblies, electrical sensor apparatus, electrical relays, electrical receptacles, electrical power connectors, electrical fuses, electrical inductors, electrical distribution boxes; repair of electrical distribution systems, data processors, computers, and computer peripherals; repair of photovoltaic installations; repair of wind-powered electricity generators information technology systems and security systems; repair of antennae, amplifiers, distributors, modulators and attenuators, electrical connectors and electronic installations for the remote control of Scientific and technological services and research and design relating thereto, namely, research and design in the field of electrical and electronic components particularly remote systems and remote controls; industrial analysis, namely, quality analysis in the field of electrical and electronic components particularly remote systems and remote controls; industrial research services in the field of electrical and electronic components particularly remote systems and remote controls; design and development of computers and computer programs being softwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 9, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 22, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 8, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 8, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 8, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 27, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 12, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 26, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 26, 2022FIMPFINAL DISPOSITION PROCESSED—
Mar 14, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 11, 2022RNWLINTERNATIONAL REGISTRATION RENEWED—
Dec 14, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 10, 2021GPNXNOTIFICATION PROCESSED BY IB—
Oct 3, 2021OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 28, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 28, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 15, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 15, 2021OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 8, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 8, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 8, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 25, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 25, 2021XAECEXAMINER'S AMENDMENT ENTERED—
Aug 25, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 25, 2021GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 25, 2021CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 27, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 27, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 27, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 4, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 4, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 4, 2021ALIEASSIGNED TO LIE—
Oct 29, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 29, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 29, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 29, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 29, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 29, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
May 22, 2020RFNTREFUSAL PROCESSED BY IB—
Apr 30, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 30, 2020RFRRREFUSAL PROCESSED BY MPU—
Apr 18, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 16, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 15, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2020DOCKASSIGNED TO EXAMINER—
Apr 14, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 13, 2020LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Apr 9, 2020SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance