USPTO serial 79283639
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,625
Dinslaken, DE
Dinslaken, DE
Dinslaken, DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Dwayne K. Goetzel
Dwayne K. Goetzel KOWERT, HOOD, MUNYON, RANKIN & GOETZEL1120 S Cap of TX HwyBldg 2, Ste 300Austin, TX 78746| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Transporting machines, namely, shunting machines for railway wagons; electric propulsion mechanisms for machines consisting of electrical motor and gearing; drives, namely, electric drives, in particular for barriers and railway points; power-driven mechanical control mechanisms for machines, and for engines and motors and railway points; parts specially adapted for servo-drives, namely, control apparatus and electric motors, control apparatus for railway point machines; mechanical conveyor belts and belts for conveyors, rope winches, and conveying machines, in particular all the aforesaid for shunting equipment and automatic train washing installations; auxiliary power supply units for supplying electrical power for tunnel safety lighting; parts and fittings for the aforesaid goods in this class | ACTIVE | — |
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, level crossing signals, contactless electrical switches consisting of magnets and metal sensitive sensors; apparatus for recording, transmission or reproduction of sound or images; data-processing equipment and computers; Downloadable computer software for diagnostics of rail transport infrastructure equipment; visualization, control and diagnosis software recorded on computer media, in particular for rail transport infrastructure equipment; Electrical controllers; network management control apparatus, namely, computers and network routers; microprocessors for controlling railway infrastructure; Electronic communications equipment, namely, wireless, ethernet, mobile radio, LAN, and serial communication transmitters and receivers; Downloadable software for deployment on web servers for monitoring, controlling and diagnosing problems for railway infrastructure; network access server hardware; electro technical equipment and apparatus, instruments and components, included in this class for use in railway signals, level crossings, railway control and interlocking systems, switch control systems, and axle counting systems, namely, magnetic, level, and proximity switches; display, measuring, counting recording monitoring testing control, regulating and commutation apparatus, namely, electronic sensors for voltage, current, temperature, humidity, resistors, train position, route control, axle counting, track clear detection, and point position indication; Recorded computer software for controlling transport systems, in particular rail transport systems, and for controlling shunting equipment and automatic train washing installations, train positioning systems and train operation information systems; railway traffic safety appliances, namely, flashing and steady tunnel safety lights, track field steady safety lighting, sensors and detector units for actuation, monitoring, and controlling of railway track actuators, safety lighting, barrier drives, and safety signals, level crossing signals, trackside signals, trackside auxiliary signals, point position and order signals, mainline and shunting signals, level crossing barriers, control and interlocking system LED light signals, electrical axle counting systems, and electronic wheel sensors; Electrical integrated control systems for controlling monitoring, and automating train operation; apparatus for railway signaling technology and installations composed thereof in particular installations for line and safety technology, level crossing technology and signal box technology comprising railway signals, acoustic signals, road signals, barrier drives, switch machines, axle counters, wheel sensors; railway and road crossing signals, luminous or mechanical; acoustic safety, optical safety, and mechanical safety railway electronic signal transmitters; railway signaling installations comprising electronic control apparatus for the manually and train-triggered operation of level crossings and signal box technology; Electrical and electromechanical components included in this class, namely, magnetic switches, proximity switches, and level switches, relays, sensors, and contact sensors, in particular for rail transport infrastructure equipment, signaling installations, and industrial and mining applications; Electric double wheel sensors, in particular for rail transport; battery chargers, uninterruptible power supply apparatus and energy distributing apparatus for stationary use, namely, electric control devices, all for use in level crossing technology, signaling installations, tunnel safety lighting and signal box systems and modules; chargers for electric batteries; detectors and indicators of the speed, direction and position of rail vehicles; electric, electronic, computer-based and processor-based controllers and integrated control systems, and computer display monitors and sensors for voltage, current, resistance, temperature and humidity, train position, railway switch position and signal status, axle counting systems and wheel sensors for rail transport infrastructure equipment, for point heating installations and for control engineering and safety technology, level crossing technology and signal box technology; electronic regulating and control devices for operation of point heating installations and for temperature control in level switches; remote electronic controllers for point heating installations; Downloadable computer software for the remote control and remote diagnosis of point heating systems; remote monitoring systems comprising computer hardware and computer software for remotely monitoring, controlling and diagnosing conditions for railway infrastructure; software recorded on computer media for process control and process visualization for tunnel safety lighting systems; network communications transmission apparatus; automatic lighting control devices for railway systems; electronic control systems for process flows for rail transport, in particular in marshalling yards and at level crossings; computer software recorded on computer media for centralized and decentralized route control in shunting equipment; Electronic apparatus and instruments for controlling system operation components of railway level crossings and interlocking systems, axle counting systems and wheel sensors; parts and fittings for the aforesaid goods | ACTIVE | — |
| 011 | Lighting apparatus, namely, lighting installations; heating apparatus, namely, for railway point heating systems; point heating systems; electric, gas-operated or geothermally operated point heating apparatus and installations; turnkey point heating installations; lighting apparatus for use for railway infrastructure; lighting installations, in particular track lighting installations; lighting installations for tunnel safety; LED lighting installations; parts and fittings for the aforesaid goods in this class; point heaters | ACTIVE | — |
| 037 | Building assembly, maintenance and repair, refurbishment, and renovation to accommodate control engineering and safety technology installations, level crossing apparatus, signal box apparatus, point heating, track lighting and tunnel safety lighting systems, control engineering and remote control technology systems, control apparatus for network management and individual parts for all the aforesaid; Installation of control engineering hardware and safety technology hardware installations, level crossing apparatus, and signal box apparatus relating to point heating track lighting and tunnel safety lighting systems for control engineering remote control, network management and individual parts for all the aforesaid | ACTIVE | — |
| 042 | Technological services, namely, research, and optical, electronic, electrical and software design and testing for others in the field of railway signals, level crossings; research and design for others in the field of railway signals, level crossings; technical consultancy, in particular relating to control engineering and safety technology for level crossing and signal box systems and apparatus; design and development of computer hardware and software; Engineering services, namely, technical project planning and construction drafting for control engineering and safety technology installations, in particular the aforesaid featuring level crossing technology and signal box technology; development and technological and engineering feasibility studies relating to optical systems, control engineering and safety technology installations, level crossing technology, and signal box technology; Photometric testing laboratory services, namely, taking measurements in lighting laboratories; Technological planning of point heating, track lighting and tunnel safety lighting systems featuring control engineering, remote control technology, control apparatus for network management, and electrical and communications engineering installations in the rail transport technology sector | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 1, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 24, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 23, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 23, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 1, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 1, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 16, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 16, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 14, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 24, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 24, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 24, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 8, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 8, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 8, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 8, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 8, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 29, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 29, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 28, 2021 | ALIE | ASSIGNED TO LIE | — |
| Oct 19, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 23, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 2, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 2, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 24, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 23, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 22, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 20, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 20, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 16, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |