Drawing for TOOLTEMP

USPTO serial 79284539

TOOLTEMP

Reviewed by CopyMark Law Group

Reg. 6344085Status 700Renewal
Filing date
Status date
Registration date
May 11, 2021
Examiner
ORTIGA PALMER, RAMONA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TOOLTEMP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $797*

Plus Government fees of $975

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

H. David Starr

H. David Starr Muncy, Geissler, Olds & Lowe, P.C.4000 Legato Road, Suite 310Fairfax, VA 22033UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Electric motors for machines, particularly for cooling installations, heating apparatus, temperature-control apparatus and conditioning baths; machine tables, namely, tables specially adapted to hold powered machinery; regulators being parts of machines; stands for machinery; parts of machines, namely, mounting hangers adapted for water and oil temperature control units, water pressure control units, and water cooling units; parts of machines, namely, housings; fittings for engine boilers; steam parts of machines, namely, namely, air-cooled and water-cooled condensers; Compressors for machines; refrigerator compressors for cooling installations; condensing installations in the nature of air-cooled and water-cooled condensers; steam engine boilers; electric pumps; pumps as machine parts; electric pumps for heating installations; regulators being parts of machines; apparatus for deaerating water, namely water separators; water heaters being parts of machines; Conditioning bath machines for conditioning industrial moulds with water and steam operationACTIVE—
009Measuring, signaling and checking apparatus and instruments, namely, thermostats, level controls, indicator lamps, power reserve indicators, timers, central processing unit (CPU) clocks, electronic microprocessor controllers, particularly for cooling apparatus, cooling installations, water cooling apparatus, temperature-control apparatus, conditioning baths and heating apparatus or installations; electric and electronic control apparatus, namely, thermostats, level controls, indicator lamps, power reserve indicators, timers, central processing unit (CPU) clocks, electronic microprocessor controllers particularly for cooling apparatus, cooling installations, water cooling apparatus, temperature-control apparatus, conditioning baths, heating apparatus or installations; thermostats; recorded software for industrial processes; downloadable software for industrial processACTIVE—
011Cooling appliances and installations, namely, electric refrigerators for industrial purposes; cooling installations, namely, electric coolers; Electric cabinets used to control temperature and for heating industrial moulds; air cooling devices, namely, air conditioners; water cooling apparatus, namely, water coolers; temperature-control apparatus, namely, apparatus for heating tools and industrial moulds to operating temperatureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 11, 2026REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 11, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 24, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 24, 2021FIMPFINAL DISPOSITION PROCESSED—
Aug 11, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 11, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 23, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 23, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 3, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 19, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 19, 2021XAECEXAMINER'S AMENDMENT ENTERED—
Jan 19, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 19, 2021GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 19, 2021CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 26, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 25, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 25, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 31, 2020RFNTREFUSAL PROCESSED BY IB—
Jul 15, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 15, 2020RFRRREFUSAL PROCESSED BY MPU—
Jun 11, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 10, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 23, 2020DOCKASSIGNED TO EXAMINER—
May 7, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
May 3, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 30, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance