USPTO serial 79284809
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
NL
NL
DE
DE
DE
DE
NL
DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
MATTHEW MOTTICE
MATTHEW MOTTICE STERIS Corporation5960 HEISLEY ROADSTERIS CorporationMentor, OH 44060| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials of metal or mainly of metal, namely, plating compositions and door panels, as well as profiles of metal, namely, end profiles, transition profiles, wall and ceiling connection profiles as well as profile end angles of metal; wainscotings of metal or mainly of metal; door fittings of metal for buildings; supporting structures of metal for interior fittings, namely stud frames for walls, metal wall panels and ceiling boards of metal; components and building elements of metal, namely, strut profiles for arranging devices on and in walls, ceiling and other surfaces, standard ceiling supports of metal, ceiling connecting parts, namely, ceiling tiles, wall panels, floor panels and ceiling panels, door frame profiles, standard door frames, round door frames; beams of metal; fastening elements of metal, namely, bolts, screws, metal ball lock pins, rivets and dowels of metal; fastening material of metal, namely, cotter pins and fastening clips of metal for tubes; metal holders for construction purposes for plates and panels, namely, metal mounting brackets; angle irons of metal, for building purposes | ACTIVE | — |
| 019 | Building materials and parts of buildings, not of metal or not mainly of metal, namely, plates and panels, as well as support elements constructed from these plates or panels for interior construction and interior fitting, namely, wall elements in the nature of non-metal wall tiles, wall linings, ceiling elements in the nature of non-metal ceiling panels, ceiling linings, floors and floor plates in the nature of non-metal floor panels; wainscotings for building purposes, not of metal or not mainly of metal; building materials, not of metal, namely, composite panels of different materials of wood and plastic, as well as support elements constructed from composite panels for interior construction and interior fitting, namely, wall elements in the nature of wall boards, wall linings in the nature of wall tiles, facade elements in the nature of non-metal covers for facades, ceiling elements in the nature of non-metal ceiling panels, ceiling linings in the nature of ceiling boards made of wood, window sills, floors, floor plates in the nature of non-metal floor panels; building materials consisting of glass, namely, thermally toughened safety glass; figured plate glass for interior building fitting as finished products; glass plates, panels, blanks, profiles and half-shells as finished products for building purposes; building glass; glass for building purposes, including heat-resistant glass panes, radiation-shielding glass panes, electrochromic glass panes; electrochromic windows, not of metal, for interior and exterior use; colored sheet glass for building purposes; decorative glass, ornamental glass and glass moulds for building purposes; building panels, not of metal; mouldings, not of metal, for building in the nature of non-metal architectural mouldings; surface plates of resin-based composites, of plastic composites, of plastic or mainly of plastic, and HPL plates as finished products in the nature of non-metal floor panels; building materials, not of metal or not mainly of metal, namely, windows, window frames, doors, light domes for use as architectural elements and partition walls for building purposes; components and building elements, not of metal, namely, strut profiles, standard supports, ceiling connecting parts in the nature of non-metal ceiling tiles, wall panels, floor panels and ceiling panels, frame profiles, standard frames, round frames; beams, not of metal; joists, not of metal; fastening elements, not of metal, namely, non-metal concrete construction hardware, namely, load transfer dowels; covings, not of metal, for building purposes in the nature of non-metal cove bases | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 20, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 20, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 20, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 20, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 20, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| May 4, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 3, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 3, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 18, 2025 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Sep 17, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 17, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 17, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 10, 2024 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jul 26, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 8, 2024 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Jun 28, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 15, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 11, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 18, 2021 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Aug 17, 2021 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Aug 4, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 4, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 16, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 16, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 27, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 12, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 9, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 9, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 9, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 31, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 23, 2020 | CRSN | CORRECTION SENT TO IB | — |
| Jul 23, 2020 | CRCR | CORRECTION CREATED FOR IB | — |
| Jul 10, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 10, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 6, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 5, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 29, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| May 15, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 11, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 7, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |