Drawing for DK-LOK

USPTO serial 79286068

DK-LOK

Reviewed by CopyMark Law Group

Reg. 6197741Status 700Renewal
Filing date
Status date
Registration date
Nov 17, 2020
Examiner
GALANTE, JOSHUA MICHAEL
Law office
TMO LAW OFFICE 127

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with DK-LOK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $797*

Plus Government fees of $975

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Hun Joon Kim

Hun Joon Kim LEX IP Meister PLLC5180 Parkstone Drive, Suite 175Chantilly, VA 20151UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal pipes and fittings therefor; metal fittings for rigid pipes; ring-shaped fittings of metal; ferrules of metal for pipes; fittings of metal for compressed air lines; fittings of metal for flexible pipes; pipe fittings of metal; valves of metal for gas piping, other than parts of machines; metal valves for containers for compressed gas, other than parts of machines; globe valves of metal, other than for machines; butterfly valves of metal, other than for machines; ball valves of metal, other than for machines; check valves of metal, other than for machines; metal pipe couplings for fastening; pipe straps of metal being metal pipe supports; metal pipe connectors; pipe joints of metal; pipe clamps of metal; elbows for pipes of metal; compression fitting of metal for pipes; rotating junctions of metal for pipes; metal valves for containers for compressed gas, not being parts of machines; valves of metal, other than parts of machines; gate valves of metal, other than for machinesACTIVE—
007Integrated fuel cell hybrid electric power generators and parts and fittings therefor, namely, brushes being parts of generators; Pump control valves for regulating the flow of gases and liquids being parts of machines; gate valves for parts of machine other than for land vehicles; valves being parts of machines, other than for land vehicles; butterfly valves being parts of machines; dispensing valves being machine parts; Angle valves being parts of machines; ball valves being parts of machines; proportional flow valves being parts of machines; back pressure valves as parts of machines; exhaust valves being parts of engines for introducing fuel-air mixtures onto the combustion chambers of internal combustion engines; injection valves being parts of engines for introducing fuel-air mixtures onto the combustion chambers of internal combustion engines; Industrial robots, namely, hydrogen refueling robots consisting of hydrogen fuel pumps and parts and fittings therefor for home stations and service stations; integrated fuel cell electric power generating apparatus and sub-apparatus, in particular, electric power generators for indoor use, comprised of valves, pumps, compressors, pressure regulators, heat exchangers; hydrogen dispensing equipment for service stations and parts and fittings therefor, namely, engine fuel pumps; fuel cell electric power generators and parts and fittings therefor, namely, brushes being parts of generators; chemical fiber spinning machines for industrial purpose and parts and fittings therefor, namely, spindles being parts of machinesACTIVE—
009Fuel cells; fuel cell electrodes; electrolyte board for fuel cells; hydrogen fuel cells and parts and fittings therefor, namely, anodes and cathodes; [ hydrogen power storage apparatus and parts and fittings therefor, namely, a system containing an electrolyser for converting electrical energy to hydrogen gas and a means of storing the hydrogen; ] fuel cell stacks and parts and fittings therefor, namely, anodes and cathodes [ ; Parts of hydrogen fuel cells and water electrolyzers, namely, anodes and cathode membranes ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 17, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 27, 2022INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Apr 16, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 16, 2021LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Aug 16, 2021COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jul 10, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 21, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 26, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 26, 2021FIMPFINAL DISPOSITION PROCESSED—
Feb 17, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 17, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 1, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 1, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 12, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 29, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 24, 2020RFNTREFUSAL PROCESSED BY IB—
Jul 23, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 22, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 22, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 6, 2020RFRRREFUSAL PROCESSED BY MPU—
Jun 5, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 4, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 26, 2020DOCKASSIGNED TO EXAMINER—
May 26, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
May 22, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 21, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance