Drawing for K3R

USPTO serial 79287713

K3R

Reviewed by CopyMark Law Group

Reg. 6604367Status 700Renewal
Filing date
Status date
Registration date
Jan 4, 2022
Examiner
SAITO, KIM
Law office
TMO LAW OFFICE 124

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with K3R?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,046*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Cecilia R. Dickson

Cecilia R. Dickson The Webb Law Firm420 Fort Duquesne Boulevard, Suite 1200One Gateway CenterPittsburgh, PA 15222

Goods and services

ClassDescriptionStatusFirst use
001Transmission fluid; brake fluid; chemical additives for motor fuel; power steering fluid; industrial chemicals; agricultural chemicals, except fungicides, herbicides, insecticides and parasiticides; soil improving agents; loamACTIVE—
004Solid lubricants for industrial purposes; solid fuels; liquid fuels; gaseous fuels; mineral oils and greases for industrial purposes, not for fuel; non-mineral oils and greases for industrial purposes, not for fuelACTIVE—
007Electric and gas welding machines with engine generator; gasoline engines not for land vehicles; diesel engines not for land vehicles; engine parts, namely, cylinder liners, exhaust valves, connecting rods, fuel filters, water pumps, crankcases, flywheels, gear cases, o-rings, crankpin metals; internal combustion engines, not for land vehicles, and pumps and compressors as parts thereof; non-electric prime movers, not for land vehicles, other than water mills and wind mills, namely, steam engines, jet engines, and turbines; engine generators, namely, alternators; hydraulic power generators; starters for motors and engines; AC motors and DC motors not for land vehicles, and parts, namely, dynamo brushes and stators; AC generators and machine parts, namely, dynamo brushes and dynamo belts; DC generators and machine parts, namely, dynamo brushes and dynamo belts; fuel pumps for land vehicle engines; oil pumps for land vehicle engines; gaskets of metal for internal combustion engines; gaskets, not of metal, for internal combustion engines; cooling fans for engines; walk-behind tractors for agricultural use; combine harvesters; reapers and binders in the nature of hay binding machine; timber harvesting machines; agricultural machinery, namely, harvesters; rice transplanting machines; power tillers; agricultural machinery, namely, fertilizer spreading machines; reapers; mowing machines; vegetable transplanting machines; agricultural seed planting machines, namely, sowers; vegetable harvesting machines; rice polishing machines; rice husking machines; spraying machines; threshing machines; vegetable packing machines; weeding machines; agricultural machines, namely, gear cutters, rechargeable brush cutters in the nature of hedge cutters, combines, threshers, backhoes, reapers, reapers and binders in the nature of hay binding machines, automated transplanting machines, namely, transplanting machines for transplanting seedlings and rice, poweroperated agricultural sprayers and pumps for agricultural sprayers and their structural parts and fittings; lawnmowers and their parts and fittings; riding lawn mowers and their parts and fittings; earth-moving machines, namely, backhoes; skid-steer loaders; wheel loaders; pile-drivers; earth augers; earth moving machines, namely, earth scrapers; tamping machines in the nature of hydraulic soil tampers; construction machines namely, excavators, concrete crushers, asphalt crushers, rock crushers, bulldozers, and piledrivers and their structural parts and fittings; loading-unloading machines and apparatus and their parts and fittings; bearings as machine parts not for land vehicles; machine parts, namely, shafts, axles and spindles, other than for land vehicles; axles for machines; crank shafts for machines and engines; shaft couplings and connecting rods for machines, motors and engines, not for land vehicles; reduction gears being parts of machines, not for land vehicles; speed change gears being parts of machines, not for land vehicles; connecting links being parts of machines, engines and motors; cams being parts of machines; gear wheels and gears for machines, not for land vehicles; power transmission belts for machines; power transmissions and gearing for machines; springs being parts of machines; shock absorbers for machines, not for land vehicles; brakes for machines; valves being parts of machines; sparking plugs for internal combustion engines; dynamo belts; fan belts, power transmission belts, timing belts for motors and engines; cylinder heads for engines; pistons for machine cylinders; oil filters for motors and engines; air filters for motors and engines; air cleaners for motors and engines; transmission chains, other than for land vehicles; power transmission components for machines, other than for land vehicles; transmission belt conveyors for machines; crawler tracks for agricultural machines, construction machines and civil engineering machines; planting claws for rice transplanting machines; tillage claws for tilling machines; air condensers; pumps for cooling engines; parts and fittings of AC motors and DC motors for land vehiclesACTIVE—
012Tractors; tractors for agricultural purposes; automobiles and their structural replacement parts and fittings thereof; aerial conveyors for the transportation of cargo; tipping body in the nature of parts of railway freight cars; pusher cars for mining; puller cars for mining; traction engine; non-electric prime movers for land vehicles, namely, internal combustion engines for land vehicles, steam engines for land vehicles, jet engines for land vehicles, and turbines for land vehicles; parachutes; anti-theft alarms for vehicles; shafts, axles or spindles, namely, propeller shafts for boats, drive shafts for land vehicles, transmission shafts for land vehicles, axles for land vehicles, and spindles for land vehicles being machine elements for land vehicles; axle bearings and wheel bearings for land vehicles; shaft couplings for land vehicles; connecting rods for land vehicles, other than parts of motors and engines; power transmissions and gearing for land vehicles; shock absorbers and suspension springs for land vehicles; brakes for land vehicles; AC motors and DC motors for land vehicles; power transmission components for land vehicles; driving chains for land vehicles; power transmission for land vehicles; power transmission belts for land vehicles; tires for * land * vehicles; engines for land vehicles; crawler tracks for tractors; axles for land vehicles; shock absorbing springs for vehicles; speed change gears for land vehicles; transmissions for land vehicles; axle bearings and wheel bearings for land vehicles; reduction gears for land vehicles; fuel tanks for land vehicles; * industrial * drones and their structural parts and fittingsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 25, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 30, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 30, 2022FIMPFINAL DISPOSITION PROCESSED—
Jun 30, 2022LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jun 30, 2022COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jun 30, 2022PLGLASSIGNED TO PARALEGAL—
Apr 4, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 20, 2022LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jan 4, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 12, 2021OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 24, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 24, 2021OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 25, 2021GPNXNOTIFICATION PROCESSED BY IB—
Oct 19, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 19, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 29, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 29, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 29, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 14, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 14, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 14, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 14, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 12, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 12, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 12, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 25, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 24, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 24, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 24, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 24, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 24, 2021ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Feb 24, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 24, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 24, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Sep 27, 2020RFNTREFUSAL PROCESSED BY IB—
Sep 5, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 24, 2020RFRRREFUSAL PROCESSED BY MPU—
Jul 17, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 16, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 24, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 20, 2020DOCKASSIGNED TO EXAMINER—
Jun 20, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 18, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance