USPTO serial 79287791
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computers and computer hardware; measuring, detecting and monitoring instruments, namely, light detectors, sound detectors, vibration detectors, electrical voltage and current detectors; electronic indicators and controllers sensors and detectors for computer-aided vision, computer-aided sound processing, computer-aided vibration processing, computer-aided biological signal processing, computer-aided industrial signal processing; GPS navigation, guidance, tracking, targeting and map making devices; information technology and audio-visual, multimedia and photographic devices, namely, integrated circuits; audiovisual and photographic devices, namely, integrated circuits being charge-coupled devices; image capturing and developing devices, namely, integrated circuits being charge-coupled devices; light, vibration, electrical voltage, current, and sound sensor modules; modules that combine sensing and computation, namely, computer hardware having features for detecting and processing light, sound, vibrations, and electrical signals from the human body, and computer hardware having features for detecting and processing light, sound, vibrations and electrical signals from industrial machines; neuromorphic data processors; asynchronous data processors; schematics, namely, downloadable diagrams for producing computing hardware, modules and processors; layouts, namely, downloadable diagrams for producing computing hardware, modules and processors; recorded and downloadable software for creating schematics for producing computer hardware, modules and processors; downloadable and recorded computer software for digital signals processing, for detecting and processing light, sound, and electrical signals from the human body; downloadable and recorded computer software for machine learning; downloadable and recorded computer software for asynchronous and event-driven algorithm design and simulation | ACTIVE | — |
| 042 | Consulting and design services and technical support, namely, consulting and design services and technical support in the field of computer hardware, software, sensor modules and processors; computer hardware development; software development, programming and implementation; website hosting services; software as a service services featuring software for digital signals processing, for detecting and processing light, sound, vibration, and electrical signals from the human body, and for machine learning; rental of software; rental of computer hardware and facilities, namely, space in a computer co-location facility for containerized data centers of others; IT consultancy, advisory and information services | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 23, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 13, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| May 15, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 21, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 21, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 2, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 2, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 17, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 17, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 14, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 28, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 28, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 28, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 9, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 3, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 3, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 2, 2021 | ALIE | ASSIGNED TO LIE | — |
| Mar 5, 2021 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Mar 4, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 4, 2021 | PETG | PETITION TO REVIVE-GRANTED | — |
| Mar 4, 2021 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Sep 27, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 6, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 29, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 30, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 29, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2020 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Jun 23, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 21, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 20, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 19, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 19, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 18, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |