Drawing for SPIDER

USPTO serial 79288143

SPIDER

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
MANOR, THOMAS M
Law office
TMO LAW OFFICE 110 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with SPIDER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Building and construction materials and elements of metal; unwrought or semi-wrought common metals; metal hardware; metal containers for storage or transport; spacers being building elements made of metal; building materials of metal; building components of metal for the construction of arches; building components (metal -) in the form of slabs; modular building units (metal -); steel building materials; reinforcement materials (metal -) for construction; fabricated metal components for building foundations; refractory construction materials of metal; reinforcing materials of metal for building; linings of metal [building]; building structures of metal; mouldings of metal for building; ties of metal for use in building; steel reinforcement for use in the construction of concrete floors; reinforcement rods of metal; reinforcing pins of metal for formwork; reinforcing bars of metal for use in brickwork; frames of metal for building; metal door viewers [non-magnified]; reinforcing fabrics of metal for building; architectural hardware made of common metals and alloys thereof; capitals (metal -) being parts of columns; pre-fabricated metal architectural columns; pillars of metal for building; stays of metal; props of metal; brickwork supports of metal; metal panels; metal brackets; frameworks of metal; frameworks of metal for ceilingsACTIVE—
019Reinforcement rods for building, not of metal; space frame modular units being building materials, not of metal; slabs, not of metal, for building; prefabricated non-metal buildings; concrete building elements; building components of wood; construction elements of plastic; structural elements (non-metallic -) for use in building; building and construction materials and elements, not of metal; building materials and building components (non-metallic); prefabricated building components (non-metallic -); prefabricated building elements (non-metallic -) for on-site assembly; manufactured building elements (non-metallic -); concrete building materials; building materials of concrete reinforced with plastics and glass fibres; fiber reinforced plastic construction materials; building materials of plastics material; building materials made of rock fibres; expanded plastics for use in construction; building boards of plastics materials; multilayer panels of plastic for use in building; reinforcing materials, not of metal, for building; structural reinforcement (non-metallic -) for construction purposes; beams (non-metallic -) for building purposes; concrete walls for building; brackets, not of metal, for building; woven materials (non-metallic -) for use in buildings; ties (non-metallic -) for use in building; modular units (non-metallic -) for constructing prefabricated buildings; foundation material (non-metallic -) for use in construction; stabilisation fabrics (non-metallic -) for use in construction; framework, not of metal, for building; building sections (non-metallic -); reinforcing mesh made of textile fibres for construction purposes; modular building units (non-metallic -); structural frameworks (non-metallic -) for buildings; building materials, not of metal; building materials [non-metallic]; reinforcing fabrics (non-metallic -) for building; fireproof seals in the nature of building materials; refractory construction materials, not of metal; non-metallic building materials having acoustic properties; partitions being non-metallic building materials; monocoque buildings (non-metallic -); pillars, not of metal, for building; pre-fabricated non-metal architectural columns; pillars (non-metallic -) for buildings; capitals (non-metallic -) being parts of columns; porticos (non-metallic -); props, not of metal; textured wall claddings, not of metal, for building; structural support joists (non-metallic -) for the construction of floors; porches [structures], not of metalACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 22, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 16, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 13, 2022FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 22, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 22, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 19, 2021OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 1, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 1, 2021OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 24, 2021LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Feb 22, 2021MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Feb 22, 2021ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 29, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Aug 25, 2020RFNTREFUSAL PROCESSED BY IB—
Aug 6, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 6, 2020RFRRREFUSAL PROCESSED BY MPU—
Jun 30, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 30, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 29, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2020DOCKASSIGNED TO EXAMINER—
Jun 26, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 25, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance