Drawing for OERLIKON

USPTO serial 79288184

OERLIKON

Reviewed by CopyMark Law Group

Reg. 6822918Status 700Registered
Filing date
Status date
Registration date
Aug 23, 2022
Examiner
CROWDER-SCHAEFER, ANDREW W
Law office
TMEG LAW OFFICE 104

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with OERLIKON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Neil B Friedman

Neil B Friedman HODGSON RUSS, LLP605 3rd Avenue, Suite 2300New York, NY 10158UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines and apparatus for automation of melt spinning machines and textile machines, namely, industrial robots for handling threads, bobbin tubes and bobbins, industrial robots for handling maintenance work, industrial transporting machines for bobbin tubes and bobbins, delivery machines for bobbin tubes and bobbins, sorting machines for bobbin tubes and bobbins, and bobbin packaging machines; machines and installations composed thereof for the manufacture, processing and treatment of non-woven fabrics, in particular melt blowing machines and machine parts therefore, namely, raw material storage containers, raw material driers, extrusion presses, mixing machines, spinning pumps, spinning nozzles, blowing nozzles units, conveyor belt units, calendering machines, consolidation units, and non-woven fabric coiling machines; non-woven fabric spinning machines and machine parts therefore, namely, raw material storage containers, raw material dryers, extrusion presses, mixing machines, spinning pumps, spinning nozzles, non-woven fabric coiling machines; units and machines for the production of textiles, namely, extraction nozzle units, folding units, calendering machines, consolidation machines and non-woven fabric coiling machines; machines for the production of textile in the nature of air-lay machines and machine parts therefore, namely, hammer mills, air laid formation heads, non-woven fabric consolidation units, non-woven fabric dryers, non-woven fabric winding machines, packaging machines and units; chemical installations in the nature of machines for manufacturing plastics for the chemical fiber industry, in particular polymerization installations for manufacturing thermoplastic polymers, polycondensation installations for manufacturing thermoplastic polymers; apparatus in the nature of plastic processing machines, plastic conditioning machines, plastic production machines; plastic processing machines, machines for separating recyclable materials; machines for recycling and treating plastics * ; all the aforementioned goods of this class not in the fields of welding, brazing, laser cladding, hardfacing, welding equipment, welding consumables, welding apparel, welding accessories, welding flux, cutting products, except for the goods in the fields of thermal spray, mechanical cutting and/or additive and build-up manufacturing *ACTIVE—
009Electric and electronic process control, process regulation, process management, measuring control regulation and data processing in the nature of electronic control system for machines for process monitoring, process control and process regulation, in particular for processing and manufacturing non-woven fabrics; visualization and control apparatus, namely, electro-dynamic apparatus for the remote control of signals, electro-dynamic apparatus for the local control of signals, electrical apparatus for the visualization of control signals, control parameters, process signal, process parameter; quality control and quality management apparatus, in particular for processing and manufacturing non-woven fabrics, namely, sensing and signaling devices for measurement and quality control of materials processing, in particular by laser, light probes, feeler heads; electric and electronic apparatus for automation of melt spinning machines and textile machines, in particular encoding apparatus, readers for coding inspection equipment, namely, optical code readers, mechanical code readers, electrical code readers; downloadable melt spinning machine and textile machine automation software for monitoring and controlling communication between computers and automated machine systems, recorded melt spinning machine and textile machine automation software for monitoring and controlling communication between computers and automated machine systems; downloadable artificial intelligence software and computer hardware for process monitoring and control in the nature of monitoring and controlling communication between computers and automated machine systems; recorded artificial intelligence software and computer hardware for process monitoring and control in the nature of monitoring and controlling communication between computers and automated machine systems; downloadable machine learning software; recorded machine learning software; electric installations for monitoring controlling and checking chemical installations for manufacturing plastics; downloadable software for monitoring, controlling and checking chemical installations for manufacturing plastics in the nature of monitoring and controlling communication between computers and automated machine system; recorded software for monitoring, controlling and checking chemical installations for manufacturing plastics in the nature of monitoring and controlling communication between computers and automated machine system * ; all the aforementioned goods of this class not in the fields of welding, brazing, laser cladding, hardfacing, welding equipment, welding consumables, welding apparel, welding accessories, welding flux, cutting products, except for the goods in the fields of thermal spray, mechanical cutting and/or additive and build-up manufacturing *ACTIVE—
037Construction, assembly, installation and maintenance of chemical installations for manufacturing plastics; installation, assembly, commissioning in the nature of checking, inspecting and testing as part of maintenance, servicing and repair of machines and installations constructed there from for manufacturing, treating and processing non-woven fabrics * ; all the aforementioned services of this class not in the fields of welding, brazing, laser cladding, hardfacing, welding equipment, welding consumables, welding apparel, welding accessories, welding flux, cutting products, except for the goods in the fields of thermal spray, mechanical cutting and/or additive and build-up manufacturing *ACTIVE—
042Engineering and engineering consultancy relating to automation of melt spinning machines and textile machines; engineering and engineering consultancy relating to the design, planning, construction, assembly monitoring, commissioning, inspection, maintenance and servicing of chemical installations for manufacturing plastics; engineering in the field of non-woven fabric manufacture, treatment and processing, in particular technical consultancy in the field of relating to goods planning, goods design, production, manufacture and installation planning and installation design * ; all the aforementioned services of this class not in the fields of welding, brazing, laser cladding, hardfacing, welding equipment, welding consumables, welding apparel, welding accessories, welding flux, cutting products, except for the goods in the fields of thermal spray, mechanical cutting and/or additive and build-up manufacturing *ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 14, 2023INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Nov 9, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 11, 2023NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Mar 9, 2023LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Mar 9, 2023COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Dec 21, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 19, 2022LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Nov 30, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 30, 2022FIMPFINAL DISPOSITION PROCESSED—
Nov 23, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 23, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 23, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 7, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 7, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 18, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 29, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 28, 2022NREVNOTICE OF REVIVAL - E-MAILED—
Apr 28, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 28, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 28, 2022ALIEASSIGNED TO LIE—
Apr 28, 2022PGRRPETITION GRANTED - RESPONSE RECEIVED—
Apr 27, 2022APETASSIGNED TO PETITION STAFF—
Apr 11, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 11, 2022PROATEAS PETITION TO REVIVE RECEIVED—
Dec 19, 2021OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 1, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 1, 2021OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 6, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 6, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 6, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 6, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 6, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 6, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 24, 2021RFNTREFUSAL PROCESSED BY IB—
Mar 11, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 11, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 11, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 16, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 16, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 27, 2020RFNTREFUSAL PROCESSED BY IB—
Sep 6, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 31, 2020RFRRREFUSAL PROCESSED BY MPU—
Aug 1, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 31, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2020DOCKASSIGNED TO EXAMINER—
Jun 30, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 26, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 25, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance